This selective lead-based paint survey report documents testing performed at Building 53 of the Jefferson Barracks VA facility in St. Louis County, Missouri. The purpose of the testing was to determine the presence of lead-based paint in areas that will be impacted by the proposed replacement of roof top air handler units and associated equipment. Using an X-ray fluorescence detector, the consultant tested paint coatings and found that none contained more than 1.0 mg/cm3 of lead, below the regulatory threshold to be considered lead-based paint. Therefore, the report concludes that none of the tested paint coatings would be considered lead-based paint.
The related federal contract opportunity is for construction services required for project number 657-21-106JB to replace obsolete air handling units that support Buildings 52 and 53 at the Jefferson Barracks Division of the St. Louis VA Medical Center. The existing units are over 35 years old. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25523R0026 0005.docx | DOCX document | |
| 36C25523R0026_1 Page 5 3 bid items.pdf | ||
| 36C25523R0026 0004.docx | DOCX document | |
| 36C25523R0026 0003.docx | DOCX document | |
| 657-21-106JB - RFI Prebid Jan-2023 Questions.docx | DOCX document | |
| 657-21-106JB Sign In Sheet.pdf | ||
| 36C25523R0026_1 Page 5.pdf | ||
| 36C25523R0026 0002.docx | DOCX document | |
| 36C25523R0026 0001.docx | DOCX document | |
| P01 JB Combined drawings 22 09 09 Part2.pdf | ||
| P01 APPENDIX B - 100 SPECIFICATIONS 22 09 30 Update.pdf | ||
| APPENDIX D - ACM LBP MOLD REPORTS PART 1.pdf | ||
| P01 JB Combined drawings 22 09 09b Part3.pdf | ||
| P01 JB Combined drawings 22 09 09 Part1.pdf | ||
| 36C25523R0026_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCI ENGINEERING, INC.
EARTH • SCIENCE • SOLUTIONS
GEOTECHNICAL
ENVIRONMENTAL
NATURAL RESOURCES
CULTURAL RESOURCES
CONSTRUCTION SERVICES
130 Point West Boulevard, St. Charles, Missouri 63301 ■ 636-949-8200 www.sciengineering.com
February 10, 2022
Scott Thraen Romanyk Consulting 3308 Preston Road, Suite 350-164 Plano, Texas 75093
RE: Selective Lead-Based Paint Survey Report, Building 53 VISN 15 – Project 657-21-106JB FCA – Replace Air Handling Units Buildings 52 & 53 St. Louis, Missouri SCI No. 2017-0502.20 Task 007
Dear Scott Thraen:
INTRODUCTION
SCI Engineering, Inc. (SCI) is pleased to submit this report summarizing lead-based paint (LBP) survey activities performed on December 2, 2021.
The purpose of this survey was to determine the presence of lead-based paint in accessible areas which will be impacted by proposed replacement of roof top air handler units and associated equipment in Building 53 of the Jefferson Barracks VA facility in St. Louis County, Missouri.
LEAD BASED PAINT SURVEY
SCI performed a LBP survey to determine whether LBP systems are prevalent within the on-site structure. The survey was conducted by Travis S. Clayton, Missouri Licensed Lead Inspector.
This survey was performed using a handheld X-Ray Fluorescence Detector (XRF) that can quickly and nondestructively determine the quantity of lead present in paint coatings on various interior and exterior components of the structure.
The United States Department of Housing and Urban Development and the Missouri Department of Health and Senior Services indicates that LBP is any paint, varnish, stain, or other applied coating that has one milligram per square centimeter (mg/cm2) or 5,000 micrograms per gram (ug/g) by dry weight (0.5 percent by mass) or more of lead. Based upon a review of the XRF results, none of the paint systems analyzed had a lead content greater than 1.0 mg/cm3. A complete summary of the lead testing results is enclosed.
CONCLUSION
None of the paint coatings analyzed in areas where renovations are anticipated were found to be considered LBP.
Scott Thraen 2 February 10, 2022 Romanyk Consulting SCI No. 2017-0502.20
We appreciate the opportunity to be of service to you on this project. If you have any questions or comments regarding these results, please feel free to contact us.
Respectfully, SCI ENGINEERING, INC.
Travis S. Clayton Lead Inspector License Number160328-300004933
Glen A. Grissom Senior Scientist
TSC/GAG/lf/rah
Enclosures XRF Results
2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T007-Jefferson Barracks VA-Bldgs. 52 and 53 AHU\!LBP\Bldg. 53\FCA Replace AHUs Bldg 53 - LBP Report.docx
FCA-Replace Air Handling Units Building 53
SCI No. 2017-0502.20 Task 007
Reading No Time Type Duration Units Sequence Results Depth Index Action Level Component Substrate Side Color Pb Reading No 81 6/1/2007 2:40 Quantify Lead Paint 20.8 mg / cm ^2 Final Inconclusive 1.12 1 POS CAL 1.06 81 82 6/1/2007 2:40 Quantify Lead Paint 20.81 mg / cm ^2 Final Negative 1 1 NEG CAL <LOD 82 87 6/1/2007 3:16 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-5 TAN <LOD 87 88 6/1/2007 3:17 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-5 TAN <LOD 88 89 6/1/2007 3:17 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-5 WHITE <LOD 89 90 6/1/2007 3:17 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-5 WHITE <LOD 90 91 6/1/2007 3:18 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-5 WHITE <LOD 91 92 6/1/2007 3:18 Quantify Lead Paint 10.33 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-5 WHITE <LOD 92 93 6/1/2007 3:19 Quantify Lead Paint 11.03 mg / cm ^2 Final Negative 1 1 EF-5 METAL AHU-5 TAN <LOD 93 94 6/1/2007 3:20 Quantify Lead Paint 11.38 mg / cm ^2 Final Negative 2 1 HANGAR METAL AHU-5 TAN 0.11 94 95 6/1/2007 3:20 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 BOX METAL AHU-5 SILVER <LOD 95 96 6/1/2007 3:21 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 FLASHING METAL AHU-5 WHITE <LOD 96 97 6/1/2007 3:23 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 DUCT SUPPORT METAL AHU-5 WHITE <LOD 97 98 6/1/2007 3:23 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ROOFING METAL AHU-5 SILVER <LOD 98 99 6/1/2007 3:24 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 COPING METAL AHU-2 WHITE <LOD 99
100 6/1/2007 3:24 Quantify Lead Paint 10.7 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-2 TAN <LOD 100 101 6/1/2007 3:25 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-2 WHITE <LOD 101 102 6/1/2007 3:25 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-2 WHITE <LOD 102 103 6/1/2007 3:26 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM DUCT METAL AHU-2 WHITE <LOD 103 104 6/1/2007 3:27 Quantify Lead Paint 10.34 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-2 GRAY <LOD 104 105 6/1/2007 3:28 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 CONDUIT METAL AHU-2 GREEN <LOD 105 106 6/1/2007 3:28 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 2.29 1 HANGAR METAL AHU-2 WHITE 0.09 106 107 6/1/2007 3:31 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 PEN COVER METAL AHU-2 WHITE <LOD 107 108 6/1/2007 3:33 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-4 TAN <LOD 108 109 6/1/2007 3:34 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-4 TAN <LOD 109 110 6/1/2007 3:34 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-4 GRAY <LOD 110 111 6/1/2007 3:35 Quantify Lead Paint 11.04 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-3 TAN <LOD 111 112 6/1/2007 3:35 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-3 TAN <LOD 112 113 6/1/2007 3:36 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.94 1 SUPPORT BEAM METAL AHU-3 WHITE <LOD 113 114 6/1/2007 3:36 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-3 WHITE <LOD 114 115 6/1/2007 3:37 Quantify Lead Paint 12.08 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM DUCT METAL AHU-3 WHITE <LOD 115 116 6/1/2007 3:39 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-3 GRAY <LOD 116 117 6/1/2007 3:39 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-1 WHITE <LOD 117 118 6/1/2007 3:39 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-1 WHITE <LOD 118 119 6/1/2007 3:40 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-1 WHITE <LOD 119 120 6/1/2007 3:40 Quantify Lead Paint 11.74 mg / cm ^2 Final Negative 1 1 HANGAR METAL AHU-1 WHITE <LOD 120 121 6/1/2007 3:41 Quantify Lead Paint 11.04 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-1 TAN <LOD 121 122 6/1/2007 3:41 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 EF-1 METAL AHU-1 TAN <LOD 122 123 6/1/2007 3:41 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 EF-1 METAL AHU-1 TAN <LOD 123 124 6/1/2007 3:42 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM DUCT METAL AHU-1 TAN <LOD 124 125 6/1/2007 3:43 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM PARAPET METAL AHU-1 WHITE <LOD 125 126 6/1/2007 3:44 Quantify Lead Paint 11.04 mg / cm ^2 Final Negative 1 1 CONDUIT METAL AHU-3 WHITE <LOD 126 127 6/1/2007 3:44 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 PENETRATION CAP METAL AHU-3 WHITE <LOD 127 128 6/1/2007 3:46 Quantify Lead Paint 20.81 mg / cm ^2 Final Inconclusive 1.12 1 POS CAL 1.05 128
FCA-Replace Air Handling Units Building 53
SCI No. 2017-0502.20 Task 007
Reading No Time Type Duration Units Sequence Results Depth Index Action Level Component Substrate Side Color Pb Reading No 129 6/1/2007 3:46 Quantify Lead Paint 20.82 mg / cm ^2 Final Negative 1 1 POS CAL <LOD 129 130 6/1/2007 3:50 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE GRAY <LOD 130 131 6/1/2007 3:50 Quantify Lead Paint 9.99 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE GRAY <LOD 131 132 6/1/2007 3:50 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE GRAY <LOD 132 133 6/1/2007 3:51 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE TAN <LOD 133 134 6/1/2007 3:51 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE TAN <LOD 134 135 6/1/2007 3:53 Quantify Lead Paint 21.15 mg / cm ^2 Final Inconclusive 1.11 1 POS CAL 1.05 135 136 6/1/2007 3:53 Quantify Lead Paint 21.16 mg / cm ^2 Final Negative 1 1 NEG CAL <LOD 136 137 6/1/2007 4:17 Quantify Lead Paint 11.39 mg / cm ^2 Final Negative 1 1 CEILING TILE 53-2 WHITE <LOD 137 138 6/1/2007 4:17 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 CEILING GRID 53-2 WHITE <LOD 138 139 6/1/2007 4:25 Quantify Lead Paint 20.8 mg / cm ^2 Final Inconclusive 1.14 1 POS CAL 1.04 139 140 6/1/2007 4:26 Quantify Lead Paint 20.8 mg / cm ^2 Final Negative 1 1 NEG CAL <LOD 140 tclayton Text Box
1. ACM TSI
tclayton Text Box ACM Locations tclayton Text Box
SCI
tclayton Line tclayton Text Box Asbestos Containing Materials (ACMs) Locations tclayton Text Box 65% Schematic Design Package tclayton Line tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Callout
1. ACM TSI with Suspect Mold Growth to be Abated
2. Non-ACM TSI with Suspect Mold Growth to be Abated tclayton Text Box Suspect Mold Growth Locations tclayton Text Box
SCI
tclayton Line tclayton Text Box Suspect Mold Growth to be Abated tclayton Text Box 65% Schematic Design Package tclayton Line tclayton Polygon tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Callout tclayton Callout
Asbestos Containing Materials(ACMs) Locations tclayton Text Box 65% Schematic Design Package tclayton Line tclayton Text Box
SCI
tclayton Text Box ACM Locations tclayton Text Box ACM Locations tclayton Text Box ACM Locations tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Oval tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Rectangle tclayton Text Box
1. ACM Window Caulk
2. ACM TSI
tclayton Callout tclayton Callout tclayton Callout tclayton Callout
Line
SCI
tclayton Text Box Suspect Mold Growth to be Abated tclayton Line tclayton Text Box 65% Schematic Design Package tclayton Line tclayton Line tclayton Text Box
1. Suspect Mold Growth to Be Abated tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Line tclayton Callout tclayton Text Box Suspect Mold Growth Locations tclayton Text Box Suspect Mold Growth Locations tclayton
Suspect Mold Growth Locations
SCOPE OF WORK
UPDN
DNDN
BED RM. - 1 BED
2S058
TOILET
2S060
HAC
2S059
BED RM. - 1 BED
2S061
UTILITY RM.,
CLEAN
2S062
LINEN RM.,
CLEAN
2S063
PATIENT RM. - 1
BED
2S066
BATH / SHOWER
RM.
2S067
BREAK RM.
2S68
KITCHEN
2S070
MEDICATION
PREP.
2S069
NURSE STATION
2S072
BED RM. - 2 BED
2S073
BATH / SHOWER
RM.
2S074
BATH / SHOWER
RM.
2S075
BED RM. - 3 BED
2S76
BED RM. - 3 BED
2S77
LOCKER RM.
2S078
TOILET
2S079STORAGE
2S080
SERVICE LOBBY
2S081
OFFICE
2S082
OFFICE, OPEN
2S083
OFFICE
2S085
WHEELCHAIR
STORAGE
2N086
RECEPTION
2N089
WAITING RM.
2N088
O.T.
2N091
O.T. ADMIN.
2N092
PT
2N096
PT
2N094
EQUIP.
STORAGE
2N095
TOILET, MALE
2N097
TOILET, FEMALE
2N098
STAIRWELL NO.
S203
PT
2N100C
OFFICE, OPEN
2N100A
EXAM
2N100B
EXAM
2N100D
EMG
2N100E
ELEC. CLOSET
2N101
EXAM
2N102
HAC
2N103
OFFICE
2N104
OFFICE, OPEN
2N106
LINEN CHUTE
2N105
OFFICE
2S001
OI&T
2S002
WAITING RM.
2S003
OFFICE, OPEN
2S004
STAIRWELL NO.
S202
TREAT. RM.
2S007
OFFICE, OPEN
2S008
EXAM
2S009
OFFICE
2S10
OFFICE
2S011
OFFICE
2S012
OFFICE
2S013 EXAM
2S014
OFFICE
2S016
COPY RM.
2S018
OFFICE
2S018A
BATH / SHOWER
RM.
2S024
TOILET, MALE
2S020
TOILET, FEMALE
2S014A
CONFERENCE
RM.
2S017
OFFICE
2S015
STORAGE
2S015A
STORAGE
2S06
BED RM. - 3 BED
2S025
ANTE RM.
2S029
BED RM.
2S030 BATH / SHOWER
RM.
2S032
BED RM. - 2 BED
2S040
BED RM. - 2 BED
2S041
TOILET
2S042
BATH / SHOWER
RM.
2S039
BED RM. - 1 BED
2S038
BED RM. - 1 BED
2S043
BED RM. - 1 BED
2S044
BED RM. - 1 BED
2S037
BATH / SHOWER
RM.
2S036
BATH / SHOWER
RM.
2S045
TOILET
2S056
BED RM. - 2 BED
2S053
TOILET
2S050
TOILET
2S051
BATH / SHOWER
RM.
2S049
STAIRWELL NO.
S201
TOILET, STAFF
2S048
LINEN CHUTE
2S047
ELEC. CLOSET
2S035
DAY RM.
2S034
ELEVATOR NO.
E1
ELEVATOR NO.
E2
BED RM. - 3 BED
2S057
BATH / SHOWER
RM.
2S055
BED RM. - 3 BED
2S054
CHASE
CH-N-1
CHASE
CH-S-2
ELEC. RM.
2S026
CHASE
CH-S-4
CHASE
CH-S-6
CHASE
CH-S-1
CHASE
CH-S-3
O2 STORAGE
2S052
CHASE
CH-S-8
CHASE
CH-S-7
CHASE
CH-S-5
STORAGE
2N091B
STORAGE
2N091C
CHASE
CH-N-2
OFFICE
2S065
SOILED UTILITY
2S64
ALCOVE
2S031
TOILET
2S027
BED- R. - 2 BED
2S028
CHASE
CH-S-9
CHASE
CH-S-14
CHASE
CH-S-13
CHASE
CH-S-12
CHASE
CH-S-11
CHASE
CH-S-10
CHASE
CH-N-3
CHASE
CH-N-4
GENERAL ROOF NOTES
KEYNOTES
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
53-MD100
53-MD101
53-AH5 53-AH2
53-AH4
53-AH3 53-AH1
53-MD200
53-MH100
53-MP100
53-MP101
53-MH101
53-MD201
1. THE ROOF FOR BUILDING 53 WILL BE REPAIRED, PARTIALLY REPLACED, OR
COMPLETELY REPLACED. REFER TO ARCHITECTURAL PLANS FOR SCOPE AND
INFORMATION REGARDING: ROOF REPLACEMENT TYPE, CURBS, PENETRATIONS,
WEATHERPROOFING, STRUCTURAL SUPPORTS, AND OVERALL CONSTRUCTION.
NORTH
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
VETERANS
HEALTH
ADMINISTRATION
B
IM
/V
IS
N
J e ff e rs o n B a rr a c k s R e p la c e A
H U s B
V
/J e ff e rs o n B a rr a c k s R e p la c e A
H U s B
M
E P
V
.r v t
/3 /2
:0
:3
P M
BUILDING 53 OVERALL PLAN - LEVEL 02 & ROOF
- MECHANICAL
OCTOBER 27, 2021
657-21-106JB
35% SCHEMATIC DESIGN
PACKAGE
FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
ST DAW
53-MO101
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
1/16" = 1'-0"
BUILDING 53 OVERALL PLAN - LEVEL 02 - MECHANICAL
1/16" = 1'-0"
BUILDING 53 OVERALL PLAN - ROOF - MECHANICAL
NO. DESCRIPTION
1 SEE ARCHITECTURAL PLANS FOR ROOF LEVEL SCOPE.
2 (NOTE TO BE REVISED LATER)
3 (NOTE TO BE REVISED LATER)
4 (NOTE TO BE REVISED LATER)
Revisions: Date:
tclayton Rectangle tclayton Rectangle tclayton Text Box
1. Location of Suspect Mold Growth to be Abated tclayton Text Box tclayton Callout tclayton Callout tclayton Text Box
SCI
tclayton Text Box Suspect Mold Growth to be Abated tclayton Line tclayton Text Box 65% Schematic Design Package
Line
09-01-15
02 82 11 - i
SECTION 02 82 11
TRADITIONAL ASBESTOS ABATEMENT
TABLE OF CONTENTS
1.1 SUMMARY OF THE WORK
1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS
1.1.2 EXTENT OF WORK
1.1.3 RELATED WORK
1.1.4 TASKS
1.1.5 CONTRACTORS USE OF PREMISES
1.2 VARIATIONS IN QUANTITY
1.3 STOP ASBESTOS REMOVAL
1.4 DEFINITIONS
1.4.1 GENERAL
1.4.2 GLOSSARY
1.4.3 REFERENCED STANDARDS ORGANIZATIONS
1.5 APPLICABLE CODES AND REGULATIONS
1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS
1.5.2 Asbestos Abatement CONTRACTOR RESPONSIBILITY
1.5.3 FEDERAL REQUIREMENTS
1.5.4 STATE REQUIREMENTS
1.5.5 LOCAL REQUIREMENTS
1.5.6 STANDARDS
1.5.7 EPA GUIDANCE DOCUMENTS
1.5.8 NOTICES
1.5.9 PERMITS/LICENSES
1.5.10 POSTING AND FILING OF REGULATIONS
1.5.11 VA RESPONSIBILITIES
1.5.12 EMERGENCY ACTION PLAN AND ARRANGEMENTS
1.5.13 PRE-CONSTRUCTION MEETING
1.6 PROJECT COORDINATION
1.6.1 PERSONNEL
1.7 RESPIRATORY PROTECTION
1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM
1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR
1.7.3 SELECTION AND USE OF RESPIRATORS
1.7.4 MINIMUM RESPIRATORY PROTECTION
02 82 11 - ii
1.7.5 MEDICAL WRITTEN OPINION
1.7.6 RESPIRATOR FIT TEST
1.7.7 RESPIRATOR FIT CHECK
1.7.8 MAINTENANCE AND CARE OF RESPIRATORS
1.7.9 SUPPLIED AIR SYSTEMS
1.8 WORKER PROTECTION
1.8.1 TRAINING OF ABATEMENT PERSONNEL
1.8.2 MEDICAL EXAMINATIONS
1.8.3 REGULATED AREA ENTRY PROCEDURE
1.8.4 DECONTAMINATION PROCEDURE
1.8.5 REGULATED AREA REQUIREMENTS
1.9 DECONTAMINATION FACILITIES
1.9.1 DESCRIPTION
1.9.2 GENERAL REQUIREMENTS
1.9.3 TEMPORARY FACILITIES TO THE PDF and W/EDF
1.9.4 PERSONNEL DECONTAMINATION FACILITY (PDF)
1.9.5 WASTE/EQUIPMENT DECONTAMINATION FACILITY (W/EDF)
1.9.6 WASTE/EQUIPMENT DECONTAMINATION PROCEDURES
PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT
2.1 MATERIALS AND EQUIPMENT
2.1.1 GENERAL REQUIREMENTS
2.2 MONITORING, INSPECTION AND TESTING
2.2.1 GENERAL
2.2.2 SCOPE OF SERVICES OF THE VPIH/CIH CONSULTANT
2.2.3 MONITORING, INSPECTION AND TESTING BY CONTRACTOR CPIH/CIH
2.3 ASBESTOS hAZARD aBATEMENT pLAN
2.4 SUBMITTALS
2.4.1 PRE-START MEETING SUBMITTALS
2.4.2 SUBMITTALS DURING ABATEMENT
2.4.3 SUBMITTALS AT COMPLETION OF ABATEMENT
2.5 ENCAPSULANTS
2.5.1 TYPES OF ENCAPSULANTS
2.5.2 PERFORMANCE REQUIREMENTS
2.5.3 CERTIFICATES OF COMPLIANCE
PART 3 - EXECUTION
3.1 REGULATED AREA PREPARATIONS
3.1.3.1 DESIGN AND LAYOUT
02 82 11 - iii
3.1.3.2 NEGATIVE AIR MACHINES (HEPA UNITS)
3.1.3.3 PRESSURE DIFFERENTIAL
3.1.3.4 MONITORING
3.1.3.5 AUXILIARY GENERATOR
3.1.3.6SUPPLEMENTAL MAKE-UP AIR INLETS
3.1.3.7 TESTING THE SYSTEM
3.1.3.8 DEMONSTRATION OF THE NEGATIVE PRESSURE Filtration SYSTEM
3.1.3.9 USE OF THE NEGATIVE PRESSURE FILTRATION SYSTEM DURING
ABATEMENT OPERATIONS
3.1.3.10 DISMANTLING THE SYSTEM
3.1.4 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA
3.1.4.1 GENERAL
3.1.4.2 PREPARATION PRIOR TO SEALING THE REGULATED AREA
3.1.4.3 CONTROLLING ACCESS TO THE REGULATED AREA
3.1.4.4 CRITICAL BARRIERS
3.1.4.5 PRIMARY BARRIERS
3.1.4.6 SECONDARY BARRIERS
3.1.4.7 EXTENSION OF THE REGULATED AREA
3.1.4.8 FIRESTOPPING
3.1.5 Sanitary facilities
3.1.6 PERSONAL PROTECTIVE EQUIPMENT
3.1.7 Pre-cleaning
3.1.8 PRE-ABATEMENT ACTIVITIES
3.1.8.1 PRE-ABATEMENT Meeting
3.1.8.2 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS
3.1.8.3 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS
3.2 REMOVAL OF ACM
3.2.1 WETTING acm
3.2.2 SECONDARY BARRIER AND WALKWAYS
3.2.3 WET REMOVAL OF ACM
3.2.4 WET REMOVAL OF AMOSITE
3.2.5 REMOVAL OF ACM/DIRT FLOORS AND OTHER SPECIAL
PROCEDURES...........................................................Er ror! Bookmark not defined.
3.3 LOCKDOWN ENCAPSULATION
3.3.1 GENERAL
3.3.2 DELIVERY AND STORAGE
3.3.3 WORKER PROTECTION
02 82 11 - iv
3.3.4 ENCAPSULATION OF SCRATCH COAT PLASTER OR PIPING
3.3.5 SEALING EXPOSED EDGES
3.4 DISPOSAL OF ACM WASTE MATERIALS
3.4.1 GENERAL
3.4.2 PROCEDURES
3.5 PROJECT DECONTAMINATION
3.5.1 GENERAL
3.5.2 REGULATED AREA CLEARANCE
3.5.3 WORK DESCRIPTION
3.5.4 PRE-DECONTAMINATION CONDITIONS
3.5.5 FIRST CLEANING
3.5.6 PRE-CLEARANCE INSPECTION AND TESTING
3.5.7 LOCKDOWN ENCAPSULATION OF ABATED SURFACES
3.6 FINAL VISUAL INSPECTION AND AIR CLEARANCE TESTING
3.6.1 GENERAL
3.6.2 FINAL VISUAL INSPECTION
3.6.3 FINAL AIR CLEARANCE TESTING
3.6.4 FINAL AIR CLEARANCE PROCEDURES
3.6.5 CLEARANCE SAMPLING USING PCM – LESS THAN 260LF/160SF:
3.6.8 LABORATORY TESTING OF TEM SAMPLES
3.7 ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE
3.7.1 COMPLETION OF ABATEMENT WORK
3.7.2 CERTIFICATE OF COMPLETION BY CONTRACTOR
3.7.3 WORK SHIFTS
3.7.4 RE-INSULATION
ATTACHMENT #1
ATTACHMENT #2
ATTACHMENT #4
02 82 11 - 1
PART 1 - GENERAL
1.1 SUMMARY OF THE WORK
1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS
Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the Asbestos Abatement Contractor discovers a conflict in the contract documents and/or requirements or codes, the conflict must be brought to the immediate attention of the Contracting Officer for resolution. Whenever there is a conflict or overlap in the requirements, the most stringent shall apply. Any actions taken by the Contractor without obtaining guidance from the Contracting Officer shall become the sole risk and responsibility of the Asbestos Abatement Contractor. All costs incurred due to such action are also the responsibility of the Asbestos Abatement Contractor.
1.1.2 EXTENT OF WORK
A. Below is a brief description of the estimated quantities of asbestos containing materials to be abated. These quantities are for informational purposes only and are based on the best information available at the time of the specification preparation. The Contractor shall satisfy himself as the actual quantities to be abated. Nothing in this section may be interpreted as limiting the extent of work otherwise required by this contract and related documents.
B. Removal, clean-up and disposal of asbestos containing materials (ACM) and asbestos/waste contaminated elements in an appropriate regulated area for the following approximate quantities;
Building 52
1. Amosite and Chrysotile-Containing Magnesium Silicate Pipe Insulation and Associated Fittings, Rooms GS08, GS08A, and 2S14 – 165 linear feet
1.1.3 RELATED WORK
A. Section 07 84 00, FIRESTOPPING.
B. Section 02 41 00, DEMOLITION.
C. Division 09, FINISHES D. Division 22, PLUMBING.
E. Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION / Section 22
05 11, COMMON WORK RESULTS FOR PLUMBING / Section 23 05 11, COMMON WORK
RESULTS FOR HVAC AND STEAM GENERATION.
F. Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION / Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING / Section 23 05 11, COMMON WORK
RESULTS FOR HVAC AND STEAM GENERATION
G. Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION.
H. Section 22 05 19, METERS AND GAGES FOR PLUMBING PIPING / Section 22 05
23, GENERAL-DUTY VALVES FOR PLUMBING PIPING / Section 22 05 33, HEAT TRACING FOR PLUMBING PIPING / Section 22 11 00, FACILITY WATER
02 82 11 - 2
DISTRIBUTION / Section 22 13 00, FACILITY SANITARY SEWERAGE / Section 22 13 23, SANITARY WASTE INTERCEPTORS / Section 22 14 00, FACILITY STORM DRAINAGE / Section 22 66 00, CHEMICAL-WASTE SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES / Section 23 11 23, FACILITY NATURAL-GAS PIPING.
I. Section 23 21 13, HYDRONIC PIPING / Section 23 22 13, STEAM AND CONDENSATE
HEATING PIPING.
J. Section 23 31 00, HVAC DUCTS AND CASINGS / Section 23 37 00, AIR OUTLETS
AND INLETS.
1.1.4 TASKS
The work tasks are summarized briefly as follows:
A. Pre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, regulated area preparations, emergency procedures arrangements, and standard operating procedures for asbestos abatement work.
B. Abatement activities including // removal //, // encapsulation //, // enclosure //, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections.
C. Cleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination.
1.1.5 CONTRACTORS USE OF PREMISES
A. The Contractor and Contractor's personnel shall cooperate fully with the VA representative/consultant to facilitate efficient use of buildings and areas within buildings. The Contractor shall perform the work in accordance with the VA specifications, drawings, phasing plan and in compliance with any/all applicable Federal, State and Local regulations and requirements.
B. The Contractor shall use the existing facilities in the building strictly within the limits indicated in contract documents as well as the approved VA Design and Construction Procedures. VA Design and Construction Procedures drawings of partially occupied buildings will show the limits of regulated areas; the placement of decontamination facilities; the temporary location of bagged waste ACM; the path of transport to outside the building; and the temporary waste storage area for each building/regulated area. Any variation from the arrangements shown on drawings shall be secured in writing from the VA representative through the pre-abatement plan of action. The following limitations of use shall apply to existing facilities shown on drawings:
1.2 VARIATIONS IN QUANTITY
The quantities and locations of ACM as indicated on the drawings and the extent of work included in this section are estimated which are limited by the physical constraints imposed by occupancy of the buildings and accessibility to ACM. Accordingly, minor variations (+/- 5%) in quantities of ACM within the regulated area are considered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contractor shall provide unit prices for newly discovered ACM and those prices shall be used for additional work required under the contractor.
1.3 STOP ASBESTOS REMOVAL
If the Contracting Officer; their field representative; (the facility Safety Officer/Manager or their designee, or the VA Professional Industrial Hygienist/Certified Industrial Hygienist (VPIH/CIH) presents
02 82 11 - 3 a verbal Stop Asbestos Removal Order, the Contractor/Personnel shall immediately stop all asbestos removal and maintain HEPA filtered negative pressure air flow in the containment and adequately wet any exposed ACM.
If a verbal Stop Asbestos Removal Order is issued, the VA shall follow-up with a written order to the Contractor as soon as it is practicable.
The Contractor shall not resume any asbestos removal activity until authorized to do so in writing by the VA Contracting Officer. A stop asbestos removal order may be issued at any time the VA Contracting Officer determines abatement conditions/activities are not within VA specification, regulatory requirements or that an imminent hazard exists to human health or the environment. Work stoppage will continue until conditions have been corrected to the satisfaction of the VA. Standby time and costs for corrective actions will be borne by the Contractor, including the VPIH/CIH time. The occurrence of any of the following events shall be reported immediately by the Contractor’s competent person to the VA Contracting Office or field representative using the most expeditious means (e.g., verbal or telephonic), followed up with written notification to the Contracting Officer as soon as practical. The Contractor shall immediately stop asbestos removal/disturbance activities and initiate fiber reduction activities:
A. Airborne PCM analysis results equal to or greater than 0.01 f/cc outside a regulated area or >0.05 f/cc inside a regulated area;
B. breach or break in regulated area containment barrier(s);
C. less than –0.02” WCG pressure in the regulated area;
D. serious injury/death at the site;
E. fire/safety emergency at the site;
F. respiratory protection system failure;
G. power failure or loss of wetting agent; or H. any visible emissions observed outside the regulated area.
1.4 DEFINITIONS
1.4.1 GENERAL
Definitions and explanations here are neither complete nor exclusive of all terms used in the contract documents, but are general for the work to the extent they are not stated more explicitly in another element of the contract documents. Drawings must be recognized as diagrammatic in nature and not completely descriptive of the requirements indicated therein.
1.4.2 GLOSSARY
Abatement - Procedures to control fiber release from asbestos-containing materials. Includes removal, encapsulation, enclosure, demolition, and renovation activities related to asbestos containing materials (ACM).
Aerosol - Solid or liquid particulate suspended in air.
Adequately wet - Sufficiently mixed or penetrated with liquid to prevent the release of particulates. If visible emissions are observed coming from the ACM, then that material has not been adequately wetted.
Aggressive method - Removal or disturbance of building material by sanding, abrading, grinding, or other method that breaks, crumbles, or disintegrates intact ACM.
Aggressive sampling - EPA AHERA defined clearance sampling method using air moving equipment such as fans and leaf blowers to aggressively disturb and maintain in the air residual fibers after abatement.
AHERA - Asbestos Hazard Emergency Response Act. Asbestos regulations for schools issued in 1987.
02 82 11 - 4
Aircell - Pipe or duct insulation made of corrugated cardboard which contains asbestos.
Air monitoring - The process of measuring the fiber content of a known volume of air collected over a specified period of time. The NIOSH 7400 Method, Issue 2 is used to determine the fiber levels in air. For personal samples and clearance air testing using Phase Contrast Microscopy (PCM) analysis. NIOSH Method 7402 can be used when it is necessary to confirm fibers counted by PCM as being asbestos. The AHERA TEM analysis may be used for background, area samples and clearance samples when required by this specification, or at the discretion of the VPIH/CIH as appropriate.
Air sample filter - The filter used to collect fibers which are then counted. The filter is made of mixed cellulose ester membrane for PCM (Phase Contrast Microscopy) and polycarbonate for TEM (Transmission Electron Microscopy)
Amended water - Water to which a surfactant (wetting agent) has been added to increase the penetrating ability of the liquid.
Asbestos - Includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that have been chemically treated or altered. Asbestos also includes PACM, as defined below.
Asbestos Hazard Abatement Plan (AHAP) - Asbestos work procedures required to be submitted by the contractor before work begins.
Asbestos-containing material (ACM) - Any material containing more than one percent of asbestos.
Asbestos contaminated elements (ACE) - Building elements such as ceilings, walls, lights, or ductwork that are contaminated with asbestos.
Asbestos-contaminated soil (ACS) – Soil found in the work area or in adjacent areas such as crawlspaces or pipe tunnels which is contaminated with asbestos-containing material debris and cannot be easily separated from the material.
Asbestos-containing waste (ACW) material - Asbestos-containing material or asbestos contaminated objects requiring disposal.
Asbestos Project Monitor – Some states require that any person conducting asbestos abatement clearance inspections and clearance air sampling be licensed as an asbestos project monitor.
Asbestos waste decontamination facility - A system consisting of drum/bag washing facilities and a temporary storage area for cleaned containers of asbestos waste. Used as the exit for waste and equipment leaving the regulated area. In an emergency, it may be used to evacuate personnel.
Authorized person - Any person authorized by the VA, the Contractor, or government agency and required by work duties to be present in regulated areas.
Authorized visitor - Any person approved by the VA; the contractor; or any government agency representative having jurisdiction over the regulated area (e.g., OSHA, Federal and State EPA.
Barrier - Any surface the isolates the regulated area and inhibits fiber migration from the regulated area.
Containment Barrier - An airtight barrier consisting of walls, floors, and/or ceilings of sealed plastic sheeting which surrounds and seals the outer perimeter of the regulated area.
Critical Barrier - The barrier responsible for isolating the regulated area from adjacent spaces, typically constructed of plastic sheeting secured in place at openings such as doors, windows, or any other opening into the regulated area.
Primary Barrier – Plastic barriers placed over critical barriers and exposed directly to abatement work.
02 82 11 - 5
Secondary Barrier - Any additional plastic barriers used to isolate and provide protection from debris during abatement work.
Breathing zone - The hemisphere forward of the shoulders with a radius of about 150 - 225 mm (6 - 9 inches) from the worker's nose.
Bridging encapsulant - An encapsulant that forms a layer on the surface of the ACM.
Building/facility owner - The legal entity, including a lessee, which exercises control over management and recordkeeping functions relating to a building and/or facility in which asbestos activities take place.
Bulk testing - The collection and analysis of suspect asbestos containing materials.
Certified Industrial Hygienist (CIH) - A person certified in the comprehensive practice of industrial hygiene by the American Board of Industrial Hygiene.
Class I asbestos work - Activities involving the removal of Thermal System Insulation (TSI) and surfacing ACM and Presumed Asbestos Containing Material (PACM).
Class II asbestos work - Activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic.
Clean room/Changing room - An uncontaminated room having facilities for the storage of employee's street clothing and uncontaminated materials and equipment.
Clearance sample - The final air sample taken after all asbestos work has been done and visually inspected. Performed by the VA's professional industrial hygiene consultant/Certified Industrial Hygienist (VPIH/CIH).
Closely resemble - The major workplace conditions which have contributed to the levels of historic asbestos exposure, are no more protective than conditions of the current workplace.
Competent person - In addition to the definition in 29 CFR 1926.32(f), one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, as specified in 29 CFR 1926.32(f); in addition, for Class I and II work who is specially trained in a training course which meets the criteria of EPA's Model Accreditation Plan (40 CFR 763) for supervisor.
Contractor's Professional Industrial Hygienist (CPIH/CIH) - The asbestos abatement contractor's industrial hygienist. The industrial hygienist must meet the qualification requirements of a PIH and may be a certified industrial hygienist (CIH).
Count - Refers to the fiber count or the average number of fibers greater than five microns in length with a length-to-width (aspect) ratio of at least 3 to 1, per cubic centimeter of air.
Crawlspace – An area which can be found either in or adjacent to the work area. This area has limited access and egress and may contain asbestos materials and/or asbestos contaminated soil.
Decontamination area/unit - An enclosed area adjacent to and connected to the regulated area and consisting of an equipment room, shower room, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.
Demolition - The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.
02 82 11 - 6
VA Total – means a building or substantial part of the building is completely removed, torn or knocked down, bulldozed, flattened, or razed, including removal of building debris.
Disposal bag - Typically 6 mil thick sift-proof, dustproof, leak-tight container used to package and transport asbestos waste from regulated areas to the approved landfill. Each bag/container must be labeled/marked in accordance with EPA, OSHA and DOT requirements.
Disturbance - Activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM.
Disturbance includes cutting away small amounts of ACM or PACM, no greater than the amount that can be contained in one standard sized glove bag or waste bag in order to access a building component. In no event shall the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or disposal bag which shall not exceed 60 inches in length or width.
Drum - A rigid, impermeable container made of cardboard fiber, plastic, or metal which can be sealed in order to be sift-proof, dustproof, and leak-tight.
Employee exposure - The exposure to airborne asbestos that would occur if the employee were not wearing respiratory protection equipment.
Encapsulant - A material that surrounds or embeds asbestos fibers in an adhesive matrix and prevents the release of fibers.
Encapsulation - Treating ACM with an encapsulant.
Enclosure - The construction of an air-tight, impermeable, permanent barrier around ACM to control the release of asbestos fibers from the material and also eliminate access to the material.
Equipment room - A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment.
Fiber - A particulate form of asbestos, 5 microns or longer, with a length to width (aspect) ratio of at least 3 to 1.
Fibers per cubic centimeter (f/cc) - Abbreviation for fibers per cubic centimeter, used to describe the level of asbestos fibers in air.
Filter - Media used in respirators, vacuums, or other machines to remove particulate from air.
Firestopping - Material used to close the open parts of a structure in order to prevent a fire from spreading.
Friable asbestos containing material - Any material containing more than one (1) percent or asbestos as determined using the method specified in appendix A, Subpart F, 40 CFR 763, section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Glovebag - Not more than a 60 x 60-inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which materials and tools may be handled.
High efficiency particulate air (HEPA) filter – An ASHRAE MERV 17 filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
HEPA vacuum - Vacuum collection equipment equipped with a HEPA filter system capable of collecting and retaining asbestos fibers.
Homogeneous area - An area of surfacing, thermal system insulation or miscellaneous ACM that is uniform in color, texture and date of application.
HVAC - Heating, Ventilation and Air Conditioning
02 82 11 - 7
Industrial hygienist (IH) - A professional qualified by education, training, and experience to anticipate, recognize, evaluate and develop controls for occupational health hazards. Meets definition requirements of the American Industrial Hygiene Association (AIHA).
Industrial hygienist technician (IH Technician) - A person working under the direction of an IH or CIH who has special training, experience, certifications and licenses required for the industrial hygiene work assigned. Some states require that an industrial hygienist technician conducting asbestos abatement clearance inspection and clearance air sampling be licensed as an asbestos project monitor.
Intact - The ACM has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.
Lockdown - Applying encapsulant, after a final visual inspection, on all abated surfaces at the conclusion of ACM removal prior to removal of critical barriers.
National Emission Standards for Hazardous Air Pollutants (NESHAP) - EPA's rule to control emissions of asbestos to the environment (40 CFR part 61, Subpart M).
Negative initial exposure assessment - A demonstration by the employer which complies with the criteria in 29 CFR 1926.1101 (f)(2)(iii), that employee exposure during an operation is expected to be consistently below the PEL.
Negative pressure - Air pressure which is lower than the surrounding area, created by exhausting air from a sealed regulated area through HEPA equipped filtration units. OSHA requires maintaining -0.02" water column gauge inside the negative pressure enclosure.
Negative pressure respirator - A respirator in which the air pressure inside the facepiece is negative during inhalation relative to the air pressure outside the respirator facepiece.
Non-friable ACM - Material that contains more than 1 percent asbestos but cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Organic vapor cartridge - The type of cartridge used on air purifying respirators to remove organic vapor hazardous air contaminants.
Outside air - The air outside buildings and structures, including, but not limited to, the air under a bridge or in an open ferry dock.
Owner/operator - Any person who owns, leases, operates, controls, or supervises the facility being demolished or renovated or any person who owns, leases, operates, controls, or supervises the demolition or renovation operation, or both.
Penetrating encapsulant - Encapsulant that is absorbed into the ACM matrix without leaving a surface layer.
Personal sampling/monitoring - Representative air samples obtained in the breathing zone for one or workers within the regulated area using a filter cassette and a calibrated air sampling pump to determine asbestos exposure.
Permissible exposure limit (PEL) - The level of exposure OSHA allows for an 8-hour time weighted average. For asbestos fibers, the eight (8) hour time weighted average PEL is 0.1 fibers per cubic centimeter (0.1 f/cc) of air and the 30-minute Excursion Limit is 1.0 fibers per cubic centimeter (1 f/cc).
Personal protective equipment (PPE) – equipment designed to protect user from injury and/or specific job hazard. Such equipment may include protective clothing, hard hats, safety glasses, and respirators.
02 82 11 - 8
Pipe tunnel – An area, typically located adjacent to mechanical spaces or boiler rooms in which the pipes servicing the heating system in the building are routed to allow the pipes to access heating elements. These areas may contain asbestos pipe insulation, asbestos fittings, or asbestos-contaminated soil.
Polarized light microscopy (PLM) - Light microscopy using dispersion staining techniques and refractive indices to identify and quantify the type(s) of asbestos present in a bulk sample.
Polyethylene sheeting - Strong plastic barrier material 4 to 6 mils thick, semi-transparent, flame retardant per NFPA 241.
Positive/negative fit check - A method of verifying the seal of a facepiece respirator by temporarily occluding the filters and breathing in (inhaling) and then temporarily occluding the exhalation valve and breathing out (exhaling) while checking for inward or outward leakage of the respirator respectively.
Presumed ACM (PACM) - Thermal system insulation, surfacing, and flooring material installed in buildings prior to 1981. If the building owner has actual knowledge or should have known through the exercise of due diligence that other materials are ACM, they too must be treated as PACM.
The designation of PACM may be rebutted pursuant to 29 CFR 1926.1101 (b).
Professional IH - An IH who meets the definition requirements of AIHA;
meets the definition requirements of OSHA as a "Competent Person" at 29 CFR 1926.1101 (b); has completed two specialized EPA approved courses on management and supervision of asbestos abatement projects; has formal training in respiratory protection and waste disposal; and has a minimum of four projects of similar complexity with this project of which at least three projects serving as the supervisory IH. The PIH may be either the VA’s PIH (VPIH) or Contractor’s PIH (CPIH/CIH).
Project designer - A person who has successfully completed the training requirements for an asbestos abatement project designer as required by 40 CFR 763 Appendix C, Part I; (B)(5).
Assigned protection factor - A value assigned by OSHA/NIOSH to indicate the expected protection provided by each respirator class, when the respirator is properly selected and worn correctly. The number indicates the reduction of exposure level from outside to inside the respirator facepiece.
Qualitative fit test (QLFT) - A fit test using a challenge material that can be sensed by the wearer if leakage in the respirator occurs.
Quantitative fit test (QNFT) - A fit test using a challenge material which is quantified outside and inside the respirator thus allowing the determination of the actual fit factor.
Regulated area - An area established by the employer to demarcate where Class I, II, III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work may accumulate; and a work area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed the PEL.
Regulated ACM (RACM) - Friable ACM; Category I non-friable ACM that has become friable; Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading or; Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of the demolition or renovation operation.
Removal - All operations where ACM, PACM and/or RACM is taken out or stripped from structures or substrates, including demolition operations.
Renovation - Altering a facility or one or more facility components in any way, including the stripping or removal of asbestos from a facility component which does not involve demolition activity.
02 82 11 - 9
Repair - Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsulation or other repair of ACM or PACM attached to structures or substrates.
Shower room - The portion of the PDF where personnel shower before leaving the regulated area.
Supplied air respirator (SAR) - A respiratory protection system that supplies minimum Grade D respirable air per ANSI/Compressed Gas Association Commodity Specification for Air, G-7.1-1989.
Surfacing ACM - A material containing more than 1 percent asbestos that is sprayed, troweled on or otherwise applied to surfaces for acoustical, fireproofing and other purposes.
Surfactant - A chemical added to water to decrease water's surface tension thus making it more penetrating into ACM.
Thermal system ACM - A material containing more than 1 percent asbestos applied to pipes, fittings, boilers, breeching, tanks, ducts, or other structural components to prevent heat loss or gain.
Transmission electron microscopy (TEM) - A microscopy method that can identify and count asbestos fibers.
VA Professional Industrial Hygienist (VPIH/CIH) – The Department of Veterans Affairs Professional Industrial Hygienist must meet the qualifications of a PIH and may be a Certified Industrial Hygienist (CIH).
VA Representative - The VA official responsible for on-going project work.
Visible emissions - Any emissions, which are visually detectable without the aid of instruments, coming from ACM/PACM/RACM/ACS or ACM waste material.
Waste/Equipment decontamination facility (W/EDF) – The area in which equipment is decontaminated before removal from the regulated area.
Waste generator - Any owner or operator whose act or process produces asbestos-containing waste material.
Waste shipment record - The shipping document, required to be originated and signed by the waste generator, used to track and substantiate the disposition of asbestos-containing waste material.
Wet cleaning - The process of thoroughly eliminating, by wet methods, any asbestos contamination from surfaces or objects.
1.4.3 REFERENCED STANDARDS ORGANIZATIONS
The following acronyms or abbreviations as referenced in contract/specification documents are defined to mean the associated names. Names and addresses may be subject to change.
A. VA Department of Veterans Affairs
810 Vermont Avenue, NW Washington, DC 20420
B. AIHA American Industrial Hygiene Association 2700 Prosperity Avenue, Suite 250 Fairfax, VA 22031 703-849-8888
C. ANSI American National Standards Institute 1430 Broadway New York, NY 10018 212-354-3300
02 82 11 - 10
D. ASTM American Society for Testing and Materials 1916 Race St.
Philadelphia, PA 19103 215-299-5400
E. CFR Code of Federal Regulations Government Printing Office
F. CGA Compressed Gas Association 1235 Jefferson Davis Highway Arlington, VA 22202 703-979-0900
G. CS Commercial Standard of the National Institute of Standards and
Technology (NIST) U. S. Department of Commerce
H. EPA Environmental Protection Agency 401 M St., SW Washington, DC 20460 202-382-3949
I. MIL-STD Military Standards/Standardization Division Office of the Assistant Secretary of Defense
J. NIST National Institute for Standards and Technology
U. S. Department of Commerce Gaithersburg, MD 20234 301-921-1000
K. NEC National Electrical Code (by NFPA)
L. NEMA National Electrical Manufacturer's Association
2101 L Street, N.W.
Washington, DC 20037
M. NFPA National Fire Protection Association
1 Batterymarch Park P.O. Box 9101 Quincy, MA 02269-9101 800-344-3555
N. NIOSH National Institutes for Occupational Safety and Health
4676 Columbia Parkway Cincinnati, OH 45226 513-533-8236
O. OSHA Occupational Safety and Health Administration
U.S. Department of Labor
Washington, DC 20402
02 82 11 - 11
P. UL Underwriters Laboratory 333 Pfingsten Rd.
Northbrook, IL 60062 312-272-8800
1.5 APPLICABLE CODES AND REGULATIONS
1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS
A. All work under this contract shall be done in strict accordance with all applicable Federal, State, and local regulations, standards and codes governing asbestos abatement, and any other trade work done in conjunction with the abatement. All applicable codes, regulations and standards are adopted into this specification and will have the same force and effect as this specification.
B. The most recent edition of any relevant regulation,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .