P01 - CLC_ENVIRONMENTAL PROTECTION CONSIDERATIONS--2019.pdf

PDF 12 KB Posted

Attached to
Y1DZ--"Renovate 1st Floor Community Living Center" at G. V. (Sonny) Montgomery VAMC in Jackson, MS.
Solicitation number
36C25620R0055
Issued by

About this file

This document outlines environmental protection considerations and requirements for a federal contract to renovate the first floor of a community living center at a Veterans Affairs medical center in Jackson, Mississippi. The contractor will be responsible for obtaining any required environmental permits and ensuring work complies with EPA, state, and local regulations regarding waste disposal, pollution prevention, spill containment and reporting. The possibility of encountering asbestos materials exists due to the age of the facility, and the contractor must notify the contracting officer if asbestos is encountered and follow all applicable safety standards. The contractor must also adhere to the medical center's environmental management program and divert debris from disposal when possible through reuse and recycling.

View the file

Other files

File Type Posted
Amendment 0004_Addendum No 2 Renovate First Floor CLC Revised.pdf PDF
Amendment 0004_36C25620R0055 0004.pdf PDF
Amendment 0003_Combined QandA Final 7_21_2020.pdf PDF
Amendment 0003_36C25620R0055 0003.pdf PDF
Amendment 0003_90_TE_VACLC_2018-01-12_IFB.pdf PDF
Amendment 0003_44OP-249548 VA-CLS Reno Asbuilt Dwg 12-12-19.pdf PDF
Amendment 0003_VA CLC AS-BUILTS COMBINE.pdf PDF
Amendment 0003_M0201_AS_BUILT.pdf PDF
Amendment 0003_M0603_AS_BUILT.pdf PDF
Amendment 0003_A0101-Model REVISED 11 25 2019.pdf PDF
Amendment 0002_36C25620R0055 0002.pdf PDF
Amendment 0001_EXHIBIT B PERFORMANCE RELEVANCY SURVEY.docx DOCX document
Amendment 0001_EXHIBIT C PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Amendment 0001_CLC Site Visit Sign-in Sheet.pdf PDF
Amendment 0001_36C25620R0055 0001.pdf PDF
P01-SOW Package_CLC FIRE PROTECTION.pdf PDF
P01-SOW Package_CLC Specification Volume 1 FINAL.pdf PDF
P01-SOW Package_CLC GENERAL.pdf PDF
P01- SOW Package_ CLC ARCHITECTURAL.pdf PDF
Final Statement of Work.pdf PDF
P01-SOW Package_CLC Specification Volume 2 FINAL.pdf PDF
P01- SOW Package_CLC ELECTRICAL.pdf PDF
P01 - CLC ASBESTOS Statement.pdf PDF
P01-SOW Package_CLC PLUMBING.pdf PDF
36C25620R0055.docx DOCX document
P01-SOW Package_CLC MECHANICAL.pdf PDF
P01 - CLC ASBESTOS Specification.pdf PDF
SF24 - BID BOND.pdf PDF
P01 - CLC ASBESTOS Construction Waste Specification.pdf PDF
P01 - SOW Package_CLC Addendum to Specification Vol 1 and 2.pdf PDF
Wage Determination 4_13_2020 Jackson CLC.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENVIRONMENTAL PROTECTION CONSIDERATIONS

Medical Center and Contractors working on Medical Center property are subject to both federal and state environmental protection laws and regulations including those of the U.S. Environmental Protection Agency and the Mississippi Department of Environmental Quality (Mississippi DEQ). Medical Center and Contractors must also follow the Sewer Use Ordinance for the City of Jackson, Mississippi.

Contractor responsible for obtaining, paying for, and abiding by the terms of any environment permits, notifications, etc. required to complete the work.

Contractor must take appropriate precautions to avoid pollution from entering storm drains or open waterways.

Contractor will take all appropriate precautions to avoid spills. Contractor is responsible for immediate containment and clean-up of all spills or other release caused by his or her operations. Contractor will notify appropriate authorities of a spill when current regulations require that such authorities be notified.

Contractor will immediately notify the COTR of any spill that requires outside notification; enters the sanitary sewer, storm drains, or open waterways; or put VA staff, patients, or the general public at risk.

To the maximum extent possible, debris and other wastes from the job must be diverted to reuse and/or recycling rather than disposal in accordance with the Construction Waste Specification. Reuse must be in accordance the terms of the Contract and only with the clearance of the COR and Contracting Officer.

Recycling does not have to be performed when its cost exceeds 110% of the cost of disposal, violates other safety or environmental laws, or suitable recyclers cannot be located.

Dispose of all debris in accordance with all applicable laws and regulations including Mississippi Department of Environmental Quality (DEQ) and Environmental Protection Agency (EPA), etc. If disposal or recycling requires a bill of lading or manifest, Contractor must provide copies to the Medical Center.

Electronics which are not recycled must be taken off Medical Center property for disposal.

Due to the age of the Medical Center, the possibility of asbestos containing materials does exist. In performing the work, if any contractor employee encounters what is believed to be Asbestos Containing Materials, they are to immediately stop and notify their supervisor and the COTR overseeing the job if asbestos materials are encountered. Unless specified directly otherwise in the Contract, removal of discovered asbestos is handled as change order or separate contract. The Medical Center has an asbestos assessment which can be viewed by contacting the Safety Section at ext. 51528, ext. 51329, or ext. 53881.

If working in a known asbestos area, all applicable OSHA, EPA, and Mississippi DEQ regulations shall be followed.

The Medical Center has environmental management system in place known as the Green Environmental Management System. The program is under the direction of Scott Berry, GEMS Coordinator. Mr.

Berry can be contacted at 601-364-1528 (ext. 51528 from a hospital phone).

An excellent but dated resource for Contractors regarding applicable environmental regulations is the MYER Guide published by the U.S. EPA (EPA Publication 305-B-04-003) and available online at http://www.epa.gov/compliance/resources/publications/assistance/sectors/constructmyer PLEASE NOTE that this guide is ONLY a reference and its use is NOT mandatory.

http://www.epa.gov/compliance/resources/publications/assistance/sectors/constructmyer