About this file

This document includes an amendment to mechanical drawings and a related federal contract solicitation. The mechanical drawing amendment provides as-built notes and details for the HVAC piping plan of the ground floor at a Community Living Center renovation project located in Jackson, Mississippi. Key details in the drawing include pipe sizes, equipment labels, and revision notes.

The related federal contract solicitation is seeking contractors to renovate the first floor of the same Community Living Center located at the G.V. (Sonny) Montgomery VA Medical Center in Jackson, Mississippi. Services required include furnishing all labor, materials, tools, equipment, transportation and supervision for the renovations. The solicitation provides attachment with instructions, important dates, a statement of work and specifications for the project. The Department of Veterans Affairs Veterans Health Administration VISN 16 is the contracting agency.

View the file

Other files

File Type Posted
Amendment 0004_Addendum No 2 Renovate First Floor CLC Revised.pdf PDF
Amendment 0004_36C25620R0055 0004.pdf PDF
Amendment 0003_Combined QandA Final 7_21_2020.pdf PDF
Amendment 0003_36C25620R0055 0003.pdf PDF
Amendment 0003_90_TE_VACLC_2018-01-12_IFB.pdf PDF
Amendment 0003_44OP-249548 VA-CLS Reno Asbuilt Dwg 12-12-19.pdf PDF
Amendment 0003_VA CLC AS-BUILTS COMBINE.pdf PDF
Amendment 0003_M0603_AS_BUILT.pdf PDF
Amendment 0003_A0101-Model REVISED 11 25 2019.pdf PDF
Amendment 0002_36C25620R0055 0002.pdf PDF
Amendment 0001_EXHIBIT B PERFORMANCE RELEVANCY SURVEY.docx DOCX document
Amendment 0001_EXHIBIT C PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Amendment 0001_CLC Site Visit Sign-in Sheet.pdf PDF
Amendment 0001_36C25620R0055 0001.pdf PDF
P01 - CLC_ENVIRONMENTAL PROTECTION CONSIDERATIONS--2019.pdf PDF
P01-SOW Package_CLC FIRE PROTECTION.pdf PDF
P01-SOW Package_CLC Specification Volume 1 FINAL.pdf PDF
P01-SOW Package_CLC GENERAL.pdf PDF
P01- SOW Package_ CLC ARCHITECTURAL.pdf PDF
Final Statement of Work.pdf PDF
P01-SOW Package_CLC Specification Volume 2 FINAL.pdf PDF
P01- SOW Package_CLC ELECTRICAL.pdf PDF
P01 - CLC ASBESTOS Statement.pdf PDF
P01-SOW Package_CLC PLUMBING.pdf PDF
36C25620R0055.docx DOCX document
P01-SOW Package_CLC MECHANICAL.pdf PDF
P01 - CLC ASBESTOS Specification.pdf PDF
SF24 - BID BOND.pdf PDF
P01 - CLC ASBESTOS Construction Waste Specification.pdf PDF
P01 - SOW Package_CLC Addendum to Specification Vol 1 and 2.pdf PDF
Wage Determination 4_13_2020 Jackson CLC.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T T T T T T

TT

T

TT

T

T

T

T T T T T

T

TTTT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

A B C D E F

H J K M N O P

R S T U V W

FCU-13 FCU-14 FCU-15 FCU-16 FCU-17

FCU-22

FCU-21 FCU-20 FCU-19 FCU-18

FCU-23

VAV-15

VAV-13

VAV-14

VAV-12

FCU-06

FCU-05

FCU-04FCU-01 FCU-02

FCU-03

FCU-07 FCU-08 FCU-09 FCU-10

FCU-11

HWR

HWS

HWR

HWS

FCU-12

VAV-11

VAV-10

VAV-07

VAV-09

VAV-08

VAV-01

VAV-02

VAV-03

VAV-04

VAV-05

VAV-06

VAV-21

VAV-16

VAV-17

VAV-18

V A

V -1

VAV-20

C H

W S

C H

W R

CHWR

CHWS

ERP-2

ERP-1

ERU-1

2 1/2"

2 1/2"

2" 2"

1"

1"

2" 2"

2" 2"

2" 2"

1" 1"

1 1/4" 1 1/4"

EF-1

3/4"

3/4"

3/4" 3/4"

1 1/2"

1 1/2"

3/4"

3/4"

Bedroom

G148

Bedroom

G149

Bedroom

G150

Bedroom

G151

Bedroom

G152 Bedroom

G153

Bedroom

G142 Bedroom

G143

Bedroom

G144

Bedroom

G145 Bedroom

G146

Bedroom, Bariatric

G141

Bath Suite

G154

Bedroom, Bariatric

G161

Soiled Utility

G174

Clean Utility

G173

Bedroom

G172

Bedroom

G171 Bedroom

G170 Bedroom

G169

Bedroom

G168

Bedroom

G166

Bedroom

G165

Bedroom

G164

Bedroom

G163Bedroom

G162

Office

G123

Family Lounge

G107

Medicine Storage

G106

Telecom Closet

G113

Conference

G131

Staff Lounge

G126

Office

G127

Office

G128

Mechanical (E)

G132

Mechanical (E)

G132.1

Concierge Station

G105

Sitting Area

G104

Multi-Purpose Area

G112

Laundry

G109

Storage

G140.2 Storage

G140.1 Elec

G160.2

Storage

G160.4

Shared Office

G129

Toilet

G148.1 Toilet

G149.1

Toilet

G150.1

Toilet

G151.1 Toilet

G152.1 Toilet

G153.1

Toilet

G146.1

Toilet

G145.1 Toilet

G144.1

Toilet

G143.1 Toilet

G142.1 Toilet

G141.1

Toilet

G172.1 Toilet

G171.1

Toilet

G170.1

Toilet

G169.1

Toilet

G168.1

Toilet

G166.1

Toilet

G165.1

Toilet

G164.1

Toilet

G163.1

Toilet

G162

Toilet

G161.1

Corridor

G140

Corridor

G160

Stairs

G167

Stairs

G147

Stairs

G133

Lobby

G103

Oxygen Storage- Empty

G121

Locker Room

G130

Storage/Linen Storage

G110

Kitchen

G111

Office

G124

Closet

G114

Multi-Purpose Area

G102

Storage

G140.3

Toilet

G130.1

STC?

Elec

G120.1

Toilet

G130.2

House Keeping

G122

Corridor

G175

Oxygen Storage - Full

G121.1

Public Toilet

G108

1 3/4" 3/4"

3/4"

3/4"

1" 1"1"

1"3/4"

1 1/4" 1 1/4"

1 1/2" 1 1/2"

2" 2"

2" 2"

M0301

4E

CD CD

1"2"

2"

CD

1"

CD

1"

1"

2"

CD CD

CD

1" 2"

2"

1"

CD

1"

2"

1"

4 4

CD

2"

2"

1"

4 4

CD

1"

CD CD

2"

1"

1"

2"

CD

1"

1 1/2" 1 1/2"

2"

2"

1 1/2" 1 1/2"

1 1/2" 1 1/4" 1 1/4"

1"

3/4"

3/4" 3/4"

1" 1"

1 1/2"

1" CD

FCU-25

1"

1"

F C

U -2

1 1/2" 1 1/2"

1"

C D

2"

2"

2 1/2" 2 1/2"

FCU-24

3/4" 3/4"

1" 1"

3/4" 3/4"

1 1/4"

1 1/4"

3/4" 3/4"

1" 1"1 1/2" 1 1/4"

1 1/4"

1 1/2" 1 1/4"

1" 1"

2" 2"

1 1/4"1 1/4"

1"

3/4"3/4"

1"

3" GR

3"

3/4" 3/4" 3/4" 3/4"

3/4" 3/4"

1" 1"

3/4" 3/4"

3/4" 3/4"

3/4"3/4" 3/4"

3/4"

3/4" 3/4" 3/4" 3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4" 3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"3/4"

3/4" 3/4"

3/4"

3/4"

1"

1"

3/4" 3/4"

3/4" 3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4" 3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4" 1"

1"

3/4" 3/4"

3/4" 3/4" 3/4" 3/4" 3/4"

3/4" 3/4" 3/4" 3/4"

3/4" 3/4" 3/4" 3/4"

3/4"

3/4" 3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

1"

3/4"3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4"3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

1"

1" 3/4"

1" 1"

1 1/4" 1 1/4"

1" 1"

Office

G125

3/4"

HWR

HWS

CHWR

CHWS

3/4"

1" 1"

HWR

HWS

3/4"

3/4"

1"

H W

R H

W S

H W

R H

W S

3/4" 3/4"

CD

CD

2"

2"

EF-2

FCU-27

/4

/4

3/4" CD

5 5

1"

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106GROUND FLOOR - HVAC PIPING PLAN

M0201

MEM CKH

1/8" = 1'-0" 4F

M0201 - HVAC PIPING PLAN - GROUND FLOOR

KEYED NOTES

1. PROVIDE SHUT OFF VALVES AND CAP 1-1/2" HWS/R FOR FUTURE CONNECTIONS.

2. PROVIDE SHUT OFF VALVES AND CAP 1-1/2" CHWS/R FOR FUTURE CONNECTIONS.

3. INSTALL PUMPS INSIDE INSULATED HEATED ENCLOSURE. PROVIDE 4" HOUSEKEEPING PAD,

EXTEND HOUSEKEEPING PAD 6" BEYOND ENCLOSURE. PROVIDE 1" THICK MINIMUM

INSULATED ENCLOSURE, 1.5 KW 120V WALL HEATER. HUBBELL POWER SYSTEMS SINGLE

ALUMINUM HOT BOX OR EQUAL. CONTRACTOR PROVIDE SIZE BASED ON FINAL LAYOUT.

MAINTAIN MINIMUM MANUFACTURER EQUIPMENT MAINTANCE ACCESS.

4. ROUTE 2" CD DN PIPING CHASE TO PIPE BASEMENT.

5. HOT WATER SYSTEM DIFFERENTIAL PRESSURE SENSOR LOCATION.

2 3

2 3

AS BUILT NOTES

1. 3-WAY VALVE

2. DP SENSOR

3. HDP SENSOR

4. FLOW SETTER

5. FLOW SETTER (IN BYPASS)

AS BUILT NOTES

1. 3-WAY VALVE

2. DP SENSOR

3. DP SENSOR

4. FLOW SETTER

5. FLOW SETTER (IN BYPASS)

wade Oval wade Line wade Rectangle wade Rectangle wade Rectangle wade Rectangle wade Oval wade Rectangle wade Rectangle wade Rectangle wade Rectangle wade Line wade Line wade Line wade Line wade Line wade Line wade Line wade Line wade Line wade Line wade Line wade Polygon wade Polygon

File details come from the government source that posted it. Updated .