This document outlines a federal contract opportunity to renovate the first floor of a Community Living Center at the G.V. (Sonny) Montgomery VA Medical Center in Jackson, Mississippi. The contractor will be responsible for furnishing all labor, materials, tools, equipment, transportation, and supervision to complete the renovation. The renovation area contains asbestos floor tiles and mastic that must be removed per the included asbestos specification and applicable regulations. Due to the age of the facility, the contractor should also be aware of potential asbestos in other hidden locations that may be uncovered. Any additional asbestos work would require a contract modification and approval before proceeding. The response deadline is not provided. The Department of Veterans Affairs Veterans Health Administration VISN 16 is the contracting agency.

View the file

Other files

File Type Posted
Amendment 0004_Addendum No 2 Renovate First Floor CLC Revised.pdf PDF
Amendment 0004_36C25620R0055 0004.pdf PDF
Amendment 0003_Combined QandA Final 7_21_2020.pdf PDF
Amendment 0003_36C25620R0055 0003.pdf PDF
Amendment 0003_90_TE_VACLC_2018-01-12_IFB.pdf PDF
Amendment 0003_44OP-249548 VA-CLS Reno Asbuilt Dwg 12-12-19.pdf PDF
Amendment 0003_VA CLC AS-BUILTS COMBINE.pdf PDF
Amendment 0003_M0201_AS_BUILT.pdf PDF
Amendment 0003_M0603_AS_BUILT.pdf PDF
Amendment 0003_A0101-Model REVISED 11 25 2019.pdf PDF
Amendment 0002_36C25620R0055 0002.pdf PDF
Amendment 0001_EXHIBIT B PERFORMANCE RELEVANCY SURVEY.docx DOCX document
Amendment 0001_EXHIBIT C PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Amendment 0001_CLC Site Visit Sign-in Sheet.pdf PDF
Amendment 0001_36C25620R0055 0001.pdf PDF
P01 - CLC_ENVIRONMENTAL PROTECTION CONSIDERATIONS--2019.pdf PDF
P01-SOW Package_CLC FIRE PROTECTION.pdf PDF
P01-SOW Package_CLC Specification Volume 1 FINAL.pdf PDF
P01-SOW Package_CLC GENERAL.pdf PDF
P01- SOW Package_ CLC ARCHITECTURAL.pdf PDF
Final Statement of Work.pdf PDF
P01-SOW Package_CLC Specification Volume 2 FINAL.pdf PDF
P01- SOW Package_CLC ELECTRICAL.pdf PDF
P01-SOW Package_CLC PLUMBING.pdf PDF
36C25620R0055.docx DOCX document
P01-SOW Package_CLC MECHANICAL.pdf PDF
P01 - CLC ASBESTOS Specification.pdf PDF
SF24 - BID BOND.pdf PDF
P01 - CLC ASBESTOS Construction Waste Specification.pdf PDF
P01 - SOW Package_CLC Addendum to Specification Vol 1 and 2.pdf PDF
Wage Determination 4_13_2020 Jackson CLC.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS WARNING STATEMENT FOR RENOVATE FIRST FLOOR OF

COMMUNITY LIVING CENTER

Prospective contractors shall be aware there is asbestos containing vinyl composite tile and/or asbestos mastic underneath the sheet flooring in ALL areas of the potential construction area. Also, all vinyl composite floor tiles exposed or covered by other flooring are asbestos containing. More than one layer of asbestos flooring may be present in some area. Removal of this flooring IS a part of this Contract. Removal shall be completed in accordance with the Asbestos Specification included in the bid package and in accordance with applicable OSHA, EPA, and Mississippi Department of Environmental Quality protocols

Due to the age of the facility, Contractor shall also be aware of the potential for the existence of asbestos containing materials other than those noted above. The facility has completed an asbestos assessment to EPA AHERA Standards and determined that

ALL exposed surfaces and insulation OTHER than the floor tiles noted above are non-asbestos.

However, the Assessment did not look behind walls or above plaster or suspended ceilings. Therefore, contractor will use caution especially when breaching walls, hard ceilings, sealed chases, or other “hidden” areas which are not surveyed during an

AHERA Assessment. Any asbestos related work EXCEPT as identified in the initial project documents (floor tile and mastic) will be handled as a change order(s) to the existing contract or separate contract and the cost of such work is NOT to be included in the initial contract bid price. Disturbance or removal of any additional asbestos containing material shall also be in accordance with the Asbestos Specification and

Contractor shall not proceed until the proper Contract modification is in place and he or she has been advised to proceed by the VA.

Any release of asbestos outside a properly controlled (“regulated”) asbestos abatement area (as proscribed by applicable regulations) shall cause contractor to immediately stop work and contact the Facility Management Office at ext. 51329 or