About this file

This is a technical drawing file (AutoCAD format) related to the McIntosh Power Plant Cooling Tower Distribution System Replacement project for Lakeland Electric, a municipal utility owned by the City of Lakeland, Florida. The drawing file, titled "Orifice_Installation.dwg," provides technical specifications and installation details for the orifice components that will be part of the new cooling water distribution system. The project involves the complete replacement of the existing header piping, lateral piping, and spray nozzles at the McIntosh Power Plant cooling tower. The work is scheduled to be performed during a Spring 2027 outage window from April 30 to May 17, with contractors required to complete all labor, materials, equipment, and services within this established cooling tower availability period to support scheduled unit startup activities. Contractors must coordinate closely with Lakeland Electric throughout the project to meet the strict timeline requirements.

The technical drawing file serves as a critical component of the project documentation, detailing the specifications and installation procedures for the orifice elements of the distribution system. Qualified contractors responding to this opportunity must demonstrate the ability to work efficiently within the compressed 17-day outage window and possess expertise in power plant cooling system installations. The coordination requirements emphasize the critical nature of the work and the operational constraints imposed by the power plant's maintenance schedule.

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .