Distribution Installation Summary

This is a project specification document for the City of Lakeland's Lakeland Electric regarding the McIntosh Power Plant Cooling Tower Distribution System Replacement project. The project scope encompasses the complete removal of the existing cooling water distribution system, including header piping, lateral piping, and spray nozzles, with the furnishing and installation of a new distribution system. The work is scheduled to occur during a Spring 2027 outage window from April 30 through May 17, with strict coordination requirements with Lakeland Electric to ensure completion within the established cooling tower availability window and support for scheduled unit startup activities. The contractor must provide all necessary labor, supervision, materials, equipment, and services to complete the replacement work within the specified timeframe.

The document establishes that contractors must demonstrate qualification to perform the work and coordinate closely with the owner throughout the project duration. The compressed schedule during the defined outage period is a critical constraint, as work completion directly impacts the power plant's operational schedule. Specific pricing terms, set-asides, incumbent information, and detailed funding sources are not addressed in this specification document, as it focuses primarily on the technical scope and project execution requirements rather than financial or administrative contract terms.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .