25-0801-4001.pdf

PDF 1 MB Posted

Attached to
McIntosh Power Plant Cooling Tower Distribution System Replacement
Solicitation number
2026-RFP-120
Issued by
Polk County, Florida

About this file

This is a specification document for the City of Lakeland, Florida, through its municipal utility Lakeland Electric, detailing the replacement of the cooling water distribution system at McIntosh Power Plant. The project involves the removal of existing header piping, lateral piping, and spray nozzles, with the furnishing and installation of a complete new distribution system. The work is scheduled to occur during a Spring 2027 outage period from April 30 through May 17, 2027. Contractors must coordinate closely with Lakeland Electric and complete all work within the established cooling tower availability window to support scheduled unit startup activities. The specification document establishes the technical requirements, standards, and performance expectations for the complete replacement of the distribution system components.

The document specifies that contractors must provide all labor, supervision, materials, equipment, and services necessary for project completion. Qualified contractors are required to demonstrate capability in coordinating with the utility's operational schedule and meeting strict completion deadlines within the cooling tower availability window. The specification establishes performance standards and technical requirements for the new distribution system to ensure compatibility with existing plant infrastructure and operational requirements at McIntosh Power Plant.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .