About this file
This document contains a bid sheet template for construction task order proposals under an Indefinite Delivery Indefinite Quantity (IDIQ) contract opportunity with the General Services Administration (GSA) Region 1. The bid sheet requests pricing for various construction divisions and general requirements for a building project in Boston, Massachusetts. It also requests pricing for management costs, overhead and profit, bonds and insurance. The related federal contract opportunity is a small business set-aside IDIQ for construction services in GSA Region 1 covering Connecticut, Massachusetts, Rhode Island, Maine, New Hampshire and Vermont. The period of performance is one base year plus four option years, with an anticipated award date in September 2023 and estimated total value between $100-125 million comprised of multiple awards. Task orders are expected to range from $250,000 to the annual prospectus limit.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DELIVERY ORDER BID SHEET
IDIQ CITY Boston STATE MA
C O
S T
O F
P R
IC
IN
G
D
AT
A R
E
FE
R E
N C
E
(Company)
BUILDING
PROJECT NAME: COMPLETION IN WEEKS
ESTIMATED COSTS
A. DIVISIONAL COSTS
DIVISION NUMBER DIVISION TITLES Included AMOUNTS $ TOTALS
Construction Subgroup ($ - ) 2 Existing Conditions (Including Demo) $ 3 Concrete (footings,coring,cutting) ($ - ) 4 Interior Construction (Framing/GWB) $ 5 Metals (beams) ($ - ) 6 Woods Plastics Composites(Millwork,Casework) $ 7 Thermal and Moisture Protection ($ - ) 8 Openings (doorways,windows) $ 9 Finishes (Paint) $ 10 Hardware ($ - ) 11 Flooring (VCT,CPT) $ 12 Furnishings/Equipment $ 13 Special Construction (ballistic assy. ,etc.) ($ - ) 14 Conveying Equipment $ 15 Specialties (Epoxy, Specialty Flooring etc..) ($ - ) 16 Glass/ Glazing $ 17 Acoustical Ceiling System ($ - ) 18 reserved for future ($ - )
Services Subgroup ($ - ) 19 reserved for future ($ - ) 20 Plumbing General ($ - ) 21 Plumbing Fixtures $ 22 Fire Suppression $ 23 HVAC General $ 24 HVAC Equipment $ 25 Integrated Building Automation Control (BAS) ($ - ) 26 Electrical General 27 Electrical Fixtures $ 28 Electronic Safety and Security ($ - ) 29 Communications (Tel/Data)
Site and Infrastructure Subgroup ($ - ) 30 reserved for future ($ - ) 31 Earthwork 32 Exterior Improvements ($ - )
DIVISIONS 2-32 SUBTOTAL ($ - )
General Requirements Subgroup #VALUE!
(general requirements priced as percentage of divisions 2-32) Percent Div 2-32 subtotal
1 General Requirements ( breakdown required) % #VALUE!
TOTAL COSTS A #VALUE!
B. ALTERNATES or OPTION COSTS (Attach estimate) AMOUNTS $ 2 ($ - ) 3 ($ - ) 4 ($ - )
TOTAL COSTS B ($ - )
C. NON DIVISIONAL DIRECT COSTS (list)
DO NOT list Divisional costs, or include lump-sum subcontractor costs that belong in Divisional costs. All Division costs (regardless of whether the work is performed by the prime contractor or by a subcontractor) shall be broken out by Division in Section A. This section is reserved for specialty costs or fees, not fitting into any specific Division.
AMOUNTS $
1 Example - Off Hours Labor Differential ($ - ) 2 ($ - ) 3 ($ - ) 4 ($ - )
TOTAL COSTS C ($ - )
D. MANAGEMENT COSTS Rate Hours AMOUNTS 1 Project Manager ($ - ) 2 Superintendent ($ - )
TOTAL COSTS D ($ - )
TOTAL BASE BID(A-B-C-D) #VALUE!
E. Overhead and Profit TITLES SubTotal Percent Amount
1 Overhead Percentage #VALUE! 10% #VALUE!
2 Profit Percentage (added to base with overhead) #VALUE! 10% #VALUE!
Total Cost E #VALUE!
TOTAL COST A-B-C-D-E #VALUE!
IDIQ CONTRACTOR FIRM NAME- ADDRESS E Bond % #VALUE! #VALUE!
F Insurance Included in Overhead
G TOTAL COST TO GOVERNMENT #VALUE!
PREPARED BY (Signature and Title) Date APPROVED BY (Signature and Title) Date
GENERAL SERVICES ADMINISTRATION
File details come from the government source that posted it. Updated .