This document is a U.S. DOT Crossing Inventory Form used to report details on highway-rail grade crossings, pathway grade crossings, and grade-separated crossings. It provides location and classification information including the primary operating railroad, state, county, city, street name, highway type, latitude and longitude, train counts and speeds, track and signal details, and contact information. Highway or pathway traffic control device information includes signage, markings, and active warning devices as well as highway characteristics covering traffic lanes, surface material, and average daily traffic. The related federal contract opportunity is for repair work on the Multnomah Falls Viaducts in Oregon and was solicited by the Federal Highway Administration Department of Transportation.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U. S. DOT CROSSING INVENTORY FORM

DEPARTMENT OF TRANSPORTATION

FEDERAL RAILROAD ADMINISTRATION OMB No. 2130-0017

Instructions for the initial reporting of the following types of new or previously unreported crossings: For public highway-rail grade crossings, complete the entire inventory Form. For private highway-rail grade crossings, complete the Header, Parts I and II, and the Submission Information section. For public pathway grade crossings (including pedestrian station grade crossings), complete the Header, Parts I and II, and the Submission Information section. For Private pathway grade crossings, complete the Header, Parts I and II, and the Submission Information section. For grade-separated highway-rail or pathway crossings (including pedestrian station crossings), complete the Header, Part I, and the Submission Information section. For changes to existing data, complete the Header, Part I Items 1-3, and the Submission Information section, in addition to the updated data fields. Note: For private crossings only, Part I Item 20 and Part III Item 2.K. are required unless otherwise noted. An asterisk * denotes an optional field.

A. Revision Date

(MM/DD/YYYY)

B. Reporting Agency C. Reason for Update (Select only one) D. DOT Crossing Inventory Number Railroad Transit Change in

Data New Crossing

Closed No Train Traffic

Quiet Zone Update

State Other Re-Open Date Change Only

Change in Primary Operating RR

Admin.

Correction

Part I: Location and Classification Information

1. Primary Operating Railroad

2. State

3. County

4. City / Municipality In Near __________________________

5. Street/Road Name & Block Number (Street/Road Name) |* (Block Number)

6. Highway Type & No.

7. Do Other Railroads Operate a Separate Track at Crossing? Yes No

If Yes, Specify RR

8. Do Other Railroads Operate Over Your Track at Crossing? Yes No If Yes, Specify RR

9. Railroad Division or Region

None _______________________

10. Railroad Subdivision or District

None _______________________

11. Branch or Line Name

None _______________________

12. RR Milepost (prefix) | (nnnn.nnn) | (suffix)

13. Line Segment

14. Nearest RR Timetable Station *

15. Parent RR (if applicable)

N/A _____________________________

16. Crossing Owner (if applicable)

N/A _________________________________

17. Crossing Type

Public Private

18. Crossing Purpose Highway Pathway, Ped.

Station, Ped.

19. Crossing Position At Grade RR Under RR Over

20. Public Access (if Private Crossing) Yes No

21. Type of Train Freight Intercity Passenger Commuter

Transit Shared Use Transit Tourist/Other

22. Average Passenger Train Count Per Day Less Than One Per Day Number Per Day_____

23. Type of Land Use Open Space Farm Residential Commercial Industrial Institutional Recreational RR Yard

24. Is there an Adjacent Crossing with a Separate Number?

Yes No If Yes, Provide Crossing Number __________________

25. Quiet Zone (FRA provided)

No 24 Hr Partial Chicago Excused Date Established _________________

26. HSR Corridor ID

__________________ N/A

27. Latitude in decimal degrees

(WGS84 std: nn.nnnnnnn)

28. Longitude in decimal degrees

(WGS84 std: -nnn.nnnnnnn)

29. Lat/Long Source

Actual Estimated 30.A. Railroad Use * 31.A. State Use *

30.B. Railroad Use * 31.B. State Use *

30.C. Railroad Use * 31.C. State Use *

30.D. Railroad Use * 31.D. State Use *

32.A. Narrative (Railroad Use) * 32.B. Narrative (State Use) *

33. Emergency Notification Telephone No. (posted)

34. Railroad Contact (Telephone No.)

35. State Contact (Telephone No.)

Part II: Railroad Information

1. Estimated Number of Daily Train Movements 1.A. Total Day Thru Trains (6 AM to 6 PM)

1.B. Total Night Thru Trains (6 PM to 6 AM)

1.C. Total Switching Trains

1.D. Total Transit Trains

1.E. Check if Less Than One Movement Per Day How many trains per week? ______

2. Year of Train Count Data (YYYY)

3. Speed of Train at Crossing 3.A. Maximum Timetable Speed (mph) __________ 3.B. Typical Speed Range Over Crossing (mph) From __________ to __________

4. Type and Count of Tracks

Main __________ Siding __________ Yard __________ Transit __________ Industry __________

5. Train Detection (Main Track only) Constant Warning Time Motion Detection AFO PTC DC Other None

6. Is Track Signaled?

Yes No

7.A. Event Recorder Yes No

7.B. Remote Health Monitoring Yes No

FORM FRA F 6180.71 (Rev. 08/03/2016) OMB approval expires 11/30/2022 Page 1 OF 2

11 05 2018

809191C

Union Pacific Railroad Company [UP] OREGON MULTNOMAH

TROUTDALE

Pedestrian

✘ CO

Pacific Northwest Portland Sub 0029.672

✘ UP

✘ 45.5780370 -122.1172260 ✘

State Phone# updated - date updated: 2022-10-20

2A-029.60-BE

800-848-8715 402-544-3721 541-250-6788

13 12 0 0

2016 25 50

1 0 0 0 0

FORM FRA F 6180.71 (Rev. 08/03/2016) OMB approval expires 11/30/2022 Page 2 OF 2

U. S. DOT CROSSING INVENTORY FORM

A. Revision Date (MM/DD/YYYY) PAGE 2 D. Crossing Inventory Number (7 char.)

Part III: Highway or Pathway Traffic Control Device Information

1. Are there Signs or Signals?

Yes No

2. Types of Passive Traffic Control Devices associated with the Crossing

2.A. Crossbuck Assemblies (count)

2.B. STOP Signs (R1-1) (count)

2.C. YIELD Signs (R1-2) (count)

2.D. Advance Warning Signs (Check all that apply; include count) None W10-1 ________ W10-3 ________ W10-11 __________ W10-2 ________ W10-4 ________ W10-12 __________

2.E. Low Ground Clearance Sign (W10-5) Yes (count_______) No

2.F. Pavement Markings 2.G. Channelization Devices/Medians

2.H. EXEMPT Sign (R15-3) Yes No

2.I. ENS Sign (I-13) Displayed Yes No

Stop Lines RR Xing Symbols

Dynamic Envelope None

All Approaches One Approach

Median None

2.J. Other MUTCD Signs Yes No 2.K. Private Crossing Signs (if private)

Yes No

2.L. LED Enhanced Signs (List types)

Specify Type _______________ Specify Type _______________ Specify Type _______________

Count __________ Count __________ Count __________

3. Types of Train Activated Warning Devices at the Grade Crossing (specify count of each device for all that apply) 3.A. Gate Arms (count)

Roadway _____ Pedestrian _____

3.B. Gate Configuration 3.C. Cantilevered (or Bridged) Flashing Light Structures (count)

3.D. Mast Mounted Flashing Lights (count of masts) _________

3.E. Total Count of Flashing Light Pairs

2 Quad 3 Quad 4 Quad

Full (Barrier) Resistance Median Gates

Over Traffic Lane _____

Not Over Traffic Lane _____

Incandescent

LED

Incandescent Back Lights Included

LED

Side Lights Included

3.F. Installation Date of Current Active Warning Devices: (MM/YYYY) ______/___________ Not Required

3.G. Wayside Horn 3.H. Highway Traffic Signals Controlling Crossing Yes No

3.I. Bells (count)

Yes No

Installed on (MM/YYYY) ______/__________

3.J. Non-Train Active Warning Flagging/Flagman Manually Operated Signals Watchman Floodlighting None

3.K. Other Flashing Lights or Warning Devices Count ___________ Specify type ______________________

4.A. Does nearby Hwy Intersection have Traffic Signals?

Yes No

4.B. Hwy Traffic Signal Interconnection Not Interconnected For Traffic Signals For Warning Signs

4.C. Hwy Traffic Signal Preemption 5. Highway Traffic Pre-Signals Yes No

6. Highway Monitoring Devices (Check all that apply) Yes - Photo/Video Recording Yes – Vehicle Presence Detection None

Simultaneous Advance

Storage Distance * ____________ Stop Line Distance * ____________

Part IV: Physical Characteristics

1. Traffic Lanes Crossing Railroad One-way Traffic

Two-way Traffic Number of Lanes _______ Divided Traffic

2. Is Roadway/Pathway Paved?

Yes No

3. Does Track Run Down a Street?

Yes No

4. Is Crossing Illuminated? (Street lights within approx. 50 feet from nearest rail) Yes No

5. Crossing Surface (on Main Track, multiple types allowed) Installation Date * (MM/YYYY) _______/__________ Width * ______________ Length * _______________ 1 Timber 2 Asphalt 3 Asphalt and Timber 4 Concrete 5 Concrete and Rubber 6 Rubber 7 Metal 8 Unconsolidated 9 Composite 10 Other (specify) ________________________________________________________

6. Intersecting Roadway within 500 feet?

Yes No If Yes, Approximate Distance (feet) _________________

7. Smallest Crossing Angle

0° – 29° 30° – 59° 60° - 90°

8. Is Commercial Power Available? *

Yes No

Part V: Public Highway Information

1. Highway System

(01) Interstate Highway System

(02) Other Nat Hwy System (NHS)

(03) Federal AID, Not NHS

(08) Non-Federal Aid

2. Functional Classification of Road at Crossing

(0) Rural (1) Urban

(1) Interstate (5) Major Collector

(2) Other Freeways and Expressways

(3) Other Principal Arterial (6) Minor Collector

(4) Minor Arterial (7) Local

3. Is Crossing on State Highway System?

Yes No

4. Highway Speed Limit

___________ MPH

Posted Statutory

5. Linear Referencing System (LRS Route ID) *

6. LRS Milepost *

7. Annual Average Daily Traffic (AADT) Year _______ AADT _____________

8. Estimated Percent Trucks

9. Regularly Used by School Buses?

Yes No Average Number per Day ___________

10. Emergency Services Route Yes No

Submission Information - This information is used for administrative purposes and is not available on the public website.

Submitted by __________________________________ Organization _______________________________________ Phone _______________ Date _____________ Public reporting burden for this information collection is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. According to the Paperwork Reduction Act of 1995, a federal agency may not conduct or sponsor, and a person is not required to, nor shall a person be subject to a penalty for failure to comply with, a collection of information unless it displays a currently valid OMB control number. The valid OMB control number for information collection is 2130-0017. Send comments regarding this burden estimate or any other aspect of this collection, including for reducing this burden to: Information Collection Officer, Federal Railroad Administration, 1200 New Jersey Ave. SE, MS-25 Washington, DC 20590.

11/05/2018 809191C

✘ 0 0

✘ ✘ 0

0 ✘✘ ✘

1970 1 ✘ 0

File details come from the government source that posted it. Updated .