This amendment modifies a solicitation for repair work on two viaducts located along the Historic Columbia River Highway in Oregon. The scope of work includes repairs to the West Viaduct between mileposts 17.36 and 17.78 from October 1, 2024 to May 15, 2025, and repairs to the East Viaduct between mileposts 17.99 and 19.91 from October 1, 2025 to May 15, 2026. The amendment provides revisions to special contract requirements including allowable lane and viaduct closures, with partial closures permitted Monday through Thursday nights and full weekend closures. The work is solicited by the Federal Highway Administration for the Oregon Department of Transportation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 09/06/2023 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056723B000019
9B. DATED (SEE ITEM 11)
09/05/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR FLAP DOT CRGNSA 100(8), Multnomah Falls Viaducts Repair
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 09-06-2023 OR FLAP DOT CRGNSA 100(8) Solicitation No. 69056723B000019 Multnomah Falls Viaducts Repair
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page i, Special Contract Requirements. Adds A/E Stamp.
Page E-55, Subsection 156.04(b)(2), Part-Width Closures on the HCRH. Revises paragraph (a).
ENCLOSURES
Pages:
i E-55
Special Contract Requirements Project: OR FLAP DOT CRGNSA 100(8), Multnomah Falls Viaducts Repair
04/02/21
ATTENTION
The following Special Contract Requirements (SCRs) are only a portion of the specifications for this project. These SCRs amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. The FP-14 is a separately published book. In order to understand the solicitation properly you need to have the FP-14 as well as this packet. Pay particular attention to the provisions of Subsection 104.04 in the FP-14 that explain how each of the many contract documents fit together.
One printed copy of the FP-14 will be distributed to the successful bidder.
To view the FP-14 electronically, go to:
https://highways.dot.gov/federal-lands/specs
A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail report.center@dot.gov, phone 814-239-1160, or fax 814-239-2156.
DIGITALLY SIGNEDDate: 2023.08.27 21:27:54-07'00'
Revised by Amendment A001
E-55 DIVISION 150
Special Contract Requirements Project: OR FLAP DOT CRGNSA 100(8), Multnomah Falls Viaducts Repair
Section 156. — PUBLIC TRAFFIC
01/06/23– FP14
Construction Requirements
156.03 Qualifications. Delete the text of this Subsection and substitute the following:
Provide a traffic control supervisor certified by ODOT.
156.04 Accommodating Traffic During Work. Add the following:
(a) Maintain pedestrian access to the following United States Forest Service trails at all times:
(1) Return Trail #442 at Wahkeena Falls;
(2) Return Trail #442 at Multnomah Falls; and
(3) Gorge Trail #400 at Oneonta Trailhead.
(b) Allowable Closures. Notify the CO and ODOT Region One Public Affairs (Katelyn Jackson (503) 731-8503 Katelyn.jackson@odot.oregon.gov) 7 days prior to any lane or viaduct closures.
(1) HCRH Closures. The following closures are allowed when all materials and equipment are available to perform work within these areas, and all traffic control devices are in place according to the traffic control requirements.
(a) Between October 1, 2024 and May 15, 2025 (dates inclusive), the HCRH may be closed between mile posts 17.36 and 17.78 to perform work on the West Viaduct.
(b) Between October 1, 2025 and May 15, 2026 (dates inclusive), the HCRH may be closed between mile posts 17.99 and 19.91 to perform work on the East Viaduct.
(2) Part-Width Closures on the HCRH. Unless otherwise restricted by Subsection 156.07, part-width closures on the HCRH are allowed as follows when the areas under Subsection 156.04(b)(1) are not closed.
(a) Monday. 7:00 p.m. to midnight.
(a)(b) Monday, Tuesday, Wednesday, and Thursday. Midnight to 9:00 a.m.; and 7:00 p.m. to midnight.
(b)(c) Friday, Saturday, and Sunday. Midnight to 8:00 a.m.; and 9:00 p.m. to midnight.
156.07 Limitations on Construction Operations. Amend as follows:
Delete paragraph (g) and substitute the following:
Revised by Amendment A001