This document contains the questions and answers from a pre-bid conference for a federal highway administration contract solicitation to repair viaducts in Multnomah Falls, Oregon. The solicitation number is 69056723B000019 and seeks to repair the substructure of east and west viaducts. Questions addressed scheduling and access challenges, clarified required concrete finishes and repair methods, and confirmed quantities and bid due dates. The government declined to add pay items for work access or extend the bid due date. Amendments will address material types for concrete repairs, acceptable screeding methods, and required concrete finish classes and locations.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR FLAP DOT CRGNSA 100(8),
Multnomah Falls Viaducts Repair
# General Technical Question Answer Date
1 X
We are interested in providing a paving quote for HMA paving on the Multnomah Falls
Viaduct Repair Project. I am unable to locate a planholder list on the SAM site. Can you provide one?
If you are signed into SAM.gov with your registered entity and you cannot see the
Interested Vendors List, you will need to be assigned the Contract Opportunities
Administrator role for your entity in
SAM.gov.
See GSAFSD_kb_articles ‐ GSA Federal
Service Desk Service Portal for more information.
If you need additional assistance, you can reach the Federal Service Desk at 866‐606‐
8220.
9/16/2023
2 X
As noted above we request that additional as‐ built documents for these structures be made available for use in providing an offer for this solicitation.
this will be addressed under Amendment
A003 9/21/2023
3 X
Can you confirm that there is no facilitated site visit or on line prebid conferences for this solicitation?
No Government personnel will be available for show‐me tours. See the Project Limits paragraph on Page A‐1 of the Notice to
Bidders.
9/25/2023
4 X
Work access for the repairs to the substructure of the east and west viaducts is going to be challenging and expensive. In order to avoid inadvertently burdening the contractor, can the
Government add a lump sum work access pay item for each viaduct?
The Government does not intend to add these additional pay items to the solicitation. Please bid accordingly.
9/25/2023
5 X
The website link for third party railroad flaggers provided under 107.04 Railroad Protection ‐ c) seems to be broken. Please provide an updated link.
“https://www.up.com/real_estate/third‐ party‐flagging/index.htm”. This website at the bottom of Page E‐17 works for us on
Google Chrome, Microsoft Edge, and
FireFox, so you may want to try cutting and pasting the website address text within the quotations into the URL address bar of your internet browser.
9/29/2023
Check General or Technical
6 X
Section 107 states Do not excavate, remove, damage, alter, or deface paleontological remains, archeological specimens, or any historic Warrenite pavement found within the construction area. However, the section for asphalt concrete placement depicts milling and asphalt placement over existing warrenite asphalt. Please clarify what measures, if any, need to be taken at these locations to provide protection of the existing asphalt.
Performing milling and asphalt placement operations over the existing historic
Warrenite pavement according to the details in the Plans will not excavate, remove, damage, alter, or deface the existing historic Warrenite pavement.
9/29/2023
7 X
What bid item is the protection of existing utilities as shown on sheet I.18 of the drawings to be paid for under?
There is no direct pay item for this work.
See Subsection 109.05.
9/29/2023
8 X
Concrete Overlays for Bridge Decks SCR
569.06(a.) Concrete Repairs. States to comply with requirements of Subsection 552.19 and
552.19A, which means these concrete repairs are measured and paid for under 552.21. In addition, Plan Sheet I.7 Estimate Note (3) for
Repair Concrete (Patching and Cathodic
Protection) states this quantity is “For patching all surfaces except the rail and the top of the deck.” So what material type is used for filling patches?
This will be addressed under Amendment
A005.
9/29/2023
9 X
Concrete Overlays for Bridge Decks SCR
569.06(a) Concrete Repairs, states to comply with requirements of Subsection 552.19 and
552.19A, which means these concrete repairs are measured and paid for under 552.21. In addition, Plan Sheet I.7 Estimate Note (3) for
Repair Concrete (Patching and Cathodic
Protection) states this quantity is “For patching all surfaces except the rail and the top of the deck.” So how are the repair areas on the top of the deck measured and paid?
This will be addressed under Amendment
A005.
9/29/2023
10 X
Specification 569.15(c) Consolidation, states to
“use a self‐propelled finishing machine capable of forward and reverse movement under positive control. Ensure the length of the screed is sufficient to extend at least 6 inches beyond the edge of both end of the section being placed.” In addition, Plan Sheet J.2
Typical Section on the West Viaduct details a roller screed with the note “Contractor to use roller screed for concrete deck strengthening pour”, so is it acceptable to use a roller screed to place the concrete overlays?
This will be addressed under Amendment
A005.
11 X
Specification 569.15(c) Consolidation, states to
“use a self‐propelled finishing machine capable of forward and reverse movement under positive control. Ensure the length of the screed is sufficient to extend at least 6 inches beyond the edge of both end of the section being placed.” In addition, Plan Sheet J.2
Typical Section on the West Viaduct details a roller screed with the note “Contractor to use roller screed for concrete deck strengthening pour”. Note that ornamental rail and curb/wall will not allow the screed to extend 6 inches beyond the placement edge, so we ask that this requirement be eliminated.
This will be addressed under Amendment
A005.
9/29/2023
12 X
SCR 552.16 calls for a Class 2 –rubbed finish for bridge surfaces exposed to view. Plan Sheet I.7 in the General Notes for Concrete Finish: For exposed column and north face of longitudinal restoration provide a Class 4 – sand blasted finish. Please clarify required finish class and locations.
This will be addressed under Amendment
A005.
9/29/2023
13 X
Bid Item A0800 Reinforcing Steel Quantity appears incorrect. We believe quantity to be closer to 10,000lbs. Please verify.
Please submit bids for the quantities shown in the Bid Schedule.
9/29/2023
14 X
Due to the scheduling and logistical considerations necessary to provide the most value to the government, we would request an extension of 2 weeks to the proposal due date.
The Government does not intend to extend the bid opening date for this project.
Please submit bids according to the solicitation documents.