This document package includes earthwork calculations and plans for the Mitchell Point Crossing portion of the Historic Columbia River Highway State Trail project in Oregon. The project requires roadway excavation of approximately 1,360 cubic yards and embankment construction of around 190 cubic yards for the trail segment from station 440+01 to 448+38.87. Additional earthwork is specified for other elements including over 1,500 cubic yards of excavation and 1,655 cubic yards of embankment for the trail from station 454+75.75 to 469+50. Smaller quantities are listed for the entry drive, parking area, gabion berm, and emergency vehicle turnaround. Relevant details on cut volumes, fill volumes, and stationing are provided to support delivery of the required earthwork.
The related federal contract opportunity is solicitation number 69056720B000024 from the Department of Transportation Federal Highway Administration for the Historic Columbia River Highway State Trail, Mitchell Point Crossing project. The opportunity type is noted as a solicitation but no further contract details are included in the provided document package.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR DOT CRGNSA 100(4)
Historic Columbia River Highway State Trail, Mitchell Point Crossing
Earthwork Summary Roadway Excavation
(CUYD)
Embankment Construction
(CUYD)
Trail 440+01 to 448+38.87 919.08 19.22 Trail 454+75.75 to 469+50 1572.48 1655.01 Entry Drive 295+30 to 297+89.22 239.92 21.72 Parking Area and Plaza 805.68 0.37 Gabion Berm 50+00 to 52+25 97.9 171.26 Emergency Vehicle Turnaround 615.41 0
Trail, Entry Drive and Gabion earthwork are provided by end area volumes. Parking area and Emergency Vehicle Turnaround earthwork are based on volumetric computations between the proposed subgrade and existing ground surfaces.
Station Area Volume Calculated Roadway Excavation Volumes
[CYD]
Area Volume
Calculated Embankment Construction
Volumes [CYD] 440+01.00 10.65 0 0.00 0.08 0 0.00 440+25.00 9.28 8.86 8.86 0.06 0.06 0.06 440+50.00 10.79 9.29 9.29 0 0.03 0.03 440+75.00 14.32 11.63 11.63 0 0 0.00 441+00.00 13.24 12.76 12.76 0 0 0.00 441+25.00 8.38 10.01 10.01 0 0 0.00 441+50.00 8.61 7.86 7.87 0 0 0.00 441+75.00 18.67 12.63 12.63 0 0 0.00 442+00.00 24.06 19.78 19.78 0 0 0.00 442+25.00 25.18 22.79 22.80 0 0 0.00 442+50.00 20.13 20.98 20.98 0 0 0.00 442+75.00 13.58 15.61 15.61 0.01 0.01 0.00 443+00.00 17.57 14.42 14.42 0 0.01 0.00
Grand Total: 166.62 166.62 Grand Total: 0.11 0.10
Quantities in CYD
MITCHELL POINT TRAIL EARTHWORK
STATION 440+01 to 448+38.87 (PAGE 1 of 3)
ROADWAY EXCAVATION VOLUMES
EMBANKMENT CONSTRUCTION
VOLUMES
Calculated Roadway
Excavation Volumes
[CYD]
Area Volume
Calculated Embankment Construction
Volumes [CYD]
443+00.00 17.57 0 0 0 0 0 443+25.00 17.21 16.1 16.10 0 0 0.00 443+50.00 17.06 15.86 15.87 0 0 0.00 443+75.00 16.58 15.57 15.57 0.75 0.35 0.35 444+00.00 15.2 14.71 14.71 1.24 0.92 0.92 444+25.00 17.69 15.23 15.23 0.05 0.6 0.60 444+50.00 29.71 21.94 21.94 1.37 0.66 0.66 444+75.00 43.85 34.06 34.06 0 0.63 0.63 445+00.00 29.89 34.14 34.14 0 0 0.00 445+25.00 19.47 22.86 22.85 11.86 5.49 5.49 445+50.00 15.17 16.04 16.04 1.52 6.19 6.19 445+75.00 21.35 16.91 16.91 0 0.7 0.70 446+00.00 53.06 34.45 34.45 0 0 0.00 446+25.00 99.37 70.57 70.57 0 0 0.00 446+50.00 62.84 75.1 75.10 0 0 0.00 446+75.00 48.97 51.76 51.76 0 0 0.00 447+00.00 42.79 42.48 42.48 0 0 0.00
Grand Total: 497.78 497.78 15.54 15.55 Quantities in CYD
MITCHELL POINT TRAIL EARTHWORK
STATION 440+01 to 448+38.87 (PAGE 1 of 3)
ROADWAY EXCAVATION VOLUMES
EMBANKMENT CONSTRUCTION
VOLUMES
Roadway
Excavation Volumes
[CYD]
Area Volume
Calculated Embankment Construction
Volumes
[CYD]
447+00.00 42.79 0 0 0 0 0 447+05.00 43.15 7.96 7.96 0 0 0.00 447+10.00 44.95 8.16 8.16 0 0 0.00 447+15.00 49.49 8.74 8.74 0 0 0.00 447+20.00 20.49 10.25 6.48 0.01 0 0.00 447+25.00 17.52 11.22 3.52 0.01 0 0.00 447+30.00 9.06 10.29 2.46 2.56 0.31 0.24 447+35.00 47.43 9.9 5.23 2.13 0.57 0.43 447+40.00 52 11.02 9.21 0.52 0.33 0.25 447+45.00 54.4 12.21 9.85 0.19 0.08 0.07 447+50.00 49.15 12.41 9.59 0.01 0.02 0.02 447+55.00 43.22 11.62 8.55 0.01 0 0.00 447+60.00 37.68 10.73 7.49 0.01 0 0.00 447+65.00 35.94 9.61 6.82 0.01 0 0.00 447+70.00 34.03 8.59 6.48 0.01 0 0.00 447+75.00 27.11 7.56 5.66 0.01 0 0.00 447+80.00 30.68 7.01 5.35 0.08 0.01 0.01 447+85.00 24 6.76 5.06 0.55 0.06 0.06 447+90.00 45.39 8.43 6.43 0.01 0.05 0.05 447+95.00 55.67 12.28 9.36 0.01 0 0.00 448+00.00 30.06 11.69 7.94 0.03 0 0.00 448+05.00 45.78 9.92 7.02 1.8 0.31 0.17 448+10.00 71.43 12.66 10.85 4.31 1.17 0.57 448+15.00 90.34 16.02 14.98 6.16 1.91 0.97 448+20.00 130 21.41 20.40 0.87 1.15 0.65 448+25.00 171.12 30.45 27.88 0.01 0.11 0.08 448+30.00 187.61 36.82 33.22 0 0 0.00
Grand Total: 323.72 254.68 6.08 3.58
ROADWAY EXCAVATION VOLUMES
EMBANKMENT
CONSTRUCTION VOLUMES
MITCHELL POINT TRAIL EARTHWORK
STATION 440+01 to 448+38.87 (PAGE 3 of 3)
Roadway
Excavation Volumes [CYD]
Area Volume
Calculated Embankment Construction
Volumes
[CYD]
454+82.00 241.67 0 0 0.02 0 0 454+85.00 173.35 24.14 23.06 0.03 0 0.00 454+90.00 95.82 26.53 24.92 0.03 0.01 0.01 454+95.00 46.69 14.67 13.20 0.04 0.01 0.01 455+00.00 16.61 7.18 5.86 0.22 0.02 0.02 455+05.00 10.79 3.61 2.54 0.61 0.13 0.08 455+10.00 18.44 3.62 2.71 0.74 0.28 0.13 455+15.00 10.20 4.51 2.65 0.68 0.34 0.13 455+20.00 9.79 4.65 1.85 0.66 0.33 0.12 455+25.00 12.32 4.87 2.05 0.66 0.31 0.12 455+30.00 15.41 5.62 2.57 0.15 0.16 0.08 455+35.00 6.50 5.08 2.03 0.64 0.15 0.07 455+40.00 4.59 3.92 1.03 0.56 0.27 0.11 455+45.00 4.56 3.76 0.85 0.56 0.25 0.10 455+50.00 0.16 3.37 0.44 0.52 0.25 0.10 455+55.00 7.37 2.88 0.70 0.54 0.32 0.10 455+60.00 6.56 3.17 1.29 0.52 0.38 0.10 455+65.00 7.57 3.64 1.31 0.46 0.34 0.09 455+70.00 16.82 4.52 2.26 0.87 0.35 0.12 455+75.00 11.7 4.74 2.64 1.64 0.78 0.23 455+80.00 7.2 3.73 1.75 1.75 1.4 0.31 455+85.00 5.51 3.06 1.18 5.95 1.78 0.71 455+90.00 5.63 2.79 1.03 7.55 2.31 1.25 455+95.00 5.26 2.59 1.01 10.05 2.84 1.63 456+00.00 5.2 2.39 0.97 9.4 2.93 1.80 456+05.00 4.72 2.58 0.92 6.83 2.46 1.50 456+10.00 4.8 2.93 0.88 4.86 1.78 1.08 456+15.00 4.94 3.05 0.90 5.07 1.53 0.92 456+20.00 5.95 3.04 1.01 4.58 1.39 0.89 456+25.00 9.53 3.38 1.43 3.14 1.02 0.71 456+30.00 8.38 3.72 1.66 3.32 0.83 0.60 456+35.00 10.46 3.93 1.74 0.54 0.48 0.36 456+40.00 16.58 4.66 2.50 0.9 0.3 0.13 456+45.00 21.48 5.6 3.52 0.88 0.39 0.16 456+50.00 25.35 6.46 4.34 0.54 0.22 0.13 456+55.00 23.82 6.72 4.55 0.87 0.24 0.13 456+60.00 20.46 6.28 4.10 0.58 0.27 0.13 456+65.00 28.5 7.1 4.53 0.01 0.11 0.05 456+70.00 38.13 9.22 6.17 0.01 0 0.00 456+75.00 32.6 9.44 6.55 0.22 0.02 0.02 456+80.00 25.11 7.4 5.34 0.1 0.03 0.03 456+85.00 21.34 5.79 4.30 0.67 0.07 0.07 456+90.00 21.89 5.6 4.00 0.05 0.07 0.07 456+95.00 27.52 6.58 4.58 0.01 0.01 0.01 457+00.00 24.13 7.03 4.78 0.01 0 0.00 457+05.00 19.21 6.01 4.01 0.01 0 0.00 457+10.00 17.58 4.97 3.41 1 0.21 0.09 457+15.00 17.51 4.64 3.25 0.68 0.35 0.16 457+20.00 17.98 4.7 3.29 0.5 0.2 0.11 457+25.00 18.02 4.87 3.33 0.07 0.07 0.05 457+30.00 17.51 5.02 3.29 0.01 0.01 0.01 457+35.00 15.92 4.93 3.10 0.01 0 0.00 457+40.00 14.39 4.64 2.81 0.01 0 0.00 457+45.00 13.83 4.31 2.61 0.03 0 0.00 457+50.00 11.84 3.87 2.38 1.62 0.15 0.15 457+55.00 10.83 3.45 2.10 1.63 0.57 0.30 457+60.00 10.04 3.19 1.93 1.82 0.86 0.32 457+65.00 6.64 2.85 1.54 1.04 0.76 0.26 457+70.00 5.91 2.56 1.16 3.56 0.85 0.43 457+75.00 5.45 2.44 1.05 2.11 1.03 0.53 457+80.00 5.17 2.35 0.98 1.61 0.92 0.34 457+85.00 4.91 1.62 0.93 10.53 1.4 1.12 457+90.00 4.96 0.91 0.91 11.62 2.05 2.05 457+95.00 5.37 0.96 0.96 13 2.28 2.28 458+00.00 5.9 1.04 1.04 14.29 2.53 2.53
Grand Total: 328.88 211.78 41.4 25.19
ROADWAY EXCAVATION VOLUMES
EMBANKMENT
CONSTRUCTION VOLUMES
MITCHELL POINT TRAIL EARTHWORK
STATION 454+74.75 to 469+50 (PAGE 1 of 2)
EMBANKMENT
CONSTRUCTION
VOLUMES
Begin Station End Station
Total Calculated Roadway
Excavation Volumes
[CYD]
Total Calculated Embankment Construction
Volumes [CYD]
Station Area Volume
Calculated Roadway
Excavation Volumes
[CYD]
Area Volume
Calculated Embankment Construction
Volumes
[CYD]
Station Area Volume
Calculated Roadway
Excavation Volumes
[CYD]
Area Volume
Calculated Embankment Construction
Volumes
[CYD]
Station Area Volume
Calculated Roadway
Excavation Volumes [CYD]
Area Volume
Calculated Embankment Construction
Volumes
[CYD]
458+00.00 464+00.00 509.59 672.03 458+00.00 5.9 0 0 15.43 0 0.00 458+75.00 0.15 0 0.00 43.29 0 0.00 466+65.00 7 0 0 36.02 0 0 464+00.00 469+50.00 851.11 957.79 458+25.00 5.4 5.23 5.23 23.59 18.07 18.06 459+00.00 0.49 0.3 0.30 27.55 32.79 32.80 466+75.00 0 1.3 1.30 33.58 12.89 12.89
458+50.00 2.99 3.89 3.88 35.54 27.37 27.38 459+25.00 5.75 2.89 2.89 12.67 18.62 18.62 467+00.00 0 0 0.00 40.27 34.19 34.19 458+75.00 0 1.39 1.38 51.03 40.08 40.08 459+50.00 13.62 8.97 8.97 1.84 6.72 6.72 467+25.00 0 0 0.00 31.07 33.03 33.03
Total 10.51 10.5 Total 85.52 85.52 459+75.00 18.63 14.93 14.93 1.49 1.54 1.54 467+50.00 0 0 0.00 29.82 28.19 28.19 460+00.00 9.7 13.12 13.12 2.8 1.99 1.99 467+75.00 0 0 0.00 30.96 28.14 28.14 460+25.00 24.77 15.96 15.96 2.54 2.47 2.47 468+00.00 16.77 7.77 7.76 19.26 23.25 23.25 460+50.00 57.92 38.28 38.28 0.11 1.22 1.23 468+25.00 33.6 23.32 23.32 3.99 10.76 10.76 460+75.00 81.67 64.63 64.63 0 0.05 0.05 468+50.00 41.9 34.96 34.95 1.49 2.54 2.54 461+00.00 80.58 75.12 75.12 1.06 0.49 0.49 468+75.00 72.91 53.15 53.15 0 0.69 0.69 461+25.00 33.37 52.75 52.75 20.76 10.1 10.10 469+00.00 93.61 77.09 77.09 0 0 0.00 461+50.00 71.94 48.75 48.75 1.47 10.29 10.29 469+25.00 89.22 84.64 84.64 0 0 0.00 461+75.00 53.01 57.85 57.85 4.34 2.69 2.69 469+50.00 84.88 80.57 80.60 0 0 0.00 462+00.00 16.4 32.13 32.13 26.1 14.09 14.09 Grand Total: 362.80 362.82 Grand Total: 173.68 173.68 462+25.00 17.2 15.56 15.56 39.82 30.52 30.52 462+50.00 14.64 14.74 14.74 132.38 79.72 79.72 462+75.00 9.37 11.12 11.12 86.25 101.22 101.22 463+00.00 6.37 7.29 7.29 34.89 56.08 56.08 463+25.00 10 7.58 7.58 73.62 50.24 50.24 463+50.00 9.34 8.95 8.95 47.95 56.28 56.28 463+75.00 3.94 6.15 6.15 44.09 42.61 42.61 464+00.00 0.47 2.04 2.04 100.11 66.76 66.76
Grand Total: 499.11 499.09 Grand Total: 586.49 586.51
Last Sheet 464+00 - 469+50 464+25.00 5.99 2.99 2.99 108.16 96.42 96.42 464+50.00 115.93 56.44 56.44 37.31 67.35 67.35 464+75.00 105.13 102.34 102.34 43.43 37.38 37.38 465+00.00 48.38 71.07 71.07 67.58 51.39 51.39 465+25.00 54.99 47.85 47.86 58.82 58.52 58.52 465+50.00 100.48 71.97 71.98 37.97 44.81 44.81 465+75.00 52.14 70.66 70.66 103.67 65.57 65.57 466+00.00 40.03 42.67 42.67 91.32 90.27 90.27 466+25.00 1.84 19.38 19.38 78.2 78.48 78.48 466+50.00 0 0.85 0.85 98.01 81.58 81.58 466+65.00 0 0 0.00 66.06 45.58 45.58
Grand Total: 488.26 488.29 Grand Total: 784.11 784.11
MITCHELL POINT TRAIL EARTHWORK - STATION 454+74.75 to 469+50 (PAGE 2 of 2)
EMBANKMENT CONSTRUCTION
VOLUMES
Trail, STATION 458+00 to STATION 458+75 Trail, STATION 458+75 to STATION 466+65 Trail, STATION 466+65 to STATION 469+50
ROADWAY EXCAVATION VOLUMES ROADWAY EXCAVATION VOLUMES
EMBANKMENT CONSTRUCTION
VOLUMES
ROADWAY EXCAVATION VOLUMES
EMBANKMENT CONSTRUCTION
VOLUMES
ROADWAY EXCAVATION VOLUMES
STATION 458+00 to STATION 464+00
ENTRY DRIVE EARTHWORK - STATION 295+30 to 297+89.22
For Information Only For Information Only
Station Area Volume
Calculated Roadway
Excavation Volumes
[CYD]
Structure Excavation Areas Area Volume
Calculated Embankment Construction
Volumes [CYD]
Structure Backfill Areas
295+30.00 46.45 0.00 0.00 0.00 0.35 0.00 0.00 0 295+35.00 45.24 5.33 8.49 0.00 0.28 0.00 0.06 0 295+40.00 43.64 5.28 8.23 0.00 0.17 0.00 0.04 0 295+45.00 43.02 5.33 8.02 0.00 0.05 0.00 0.02 0 295+50.00 43.04 5.50 7.97 0.00 0.00 0.00 0.00 0 295+55.00 35.35 5.67 7.26 0.00 0.00 0.00 0.00 0 295+60.00 34.68 5.67 6.48 0.00 0.00 0.00 0.00 0 295+65.00 38.7 5.55 6.79 0.00 0.00 0.00 0.00 0 295+70.00 36.98 5.48 7.01 0.00 0.00 0.00 0.00 0 295+75.00 34.63 5.47 6.63 24.62 0.00 0.00 0.00 14.7 295+80.00 30.79 5.31 6.06 48.97 0.00 0.00 0.00 36.57 295+85.00 24.25 4.64 5.10 49.21 0.00 1.45 0.00 48.36 295+90.00 19.36 3.63 4.04 48.29 1.76 3.17 0.16 60.53 295+95.00 14.92 2.73 3.17 31.70 25.45 6.68 2.52 60.51 296+00.00 13.28 2.19 2.61 48.69 39.34 12.77 6.00 99 296+05.00 14.93 2.18 2.61 51.61 18.86 13.63 5.39 99.06 296+10.00 16.95 2.53 2.95 42.64 5.23 8.98 2.23 73.02 296+15.00 19.12 2.92 3.34 53.20 1.27 5.22 0.60 73.07 296+20.00 20.91 3.24 3.71 63.92 0.00 3.30 0.12 73.04 296+25.00 21.21 3.47 3.90 57.03 0.00 1.84 0.00 60.55 296+30.00 20.89 3.48 3.90 59.73 0.00 1.16 0.00 60.52 296+35.00 19.85 3.30 3.77 58.10 0.10 1.31 0.01 60.51 296+40.00 18.98 3.11 3.60 55.82 0.56 1.75 0.06 60.53 296+45.00 18.22 2.97 3.44 51.84 1.35 2.24 0.18 60.51 296+50.00 18.17 2.82 3.37 72.53 2.22 3.09 0.33 85.84 296+55.00 17.06 2.63 3.26 75.62 3.83 4.48 0.56 99.01 296+60.00 17.16 2.63 3.17 67.79 5.82 5.87 0.89 99.01 296+65.00 18.17 2.84 3.27 67.02 2.80 6.14 0.80 98.39 296+70.00 17.83 2.88 3.33 84.22 1.22 5.62 0.37 112.43 296+75.00 16.81 2.72 3.21 83.46 1.21 5.31 0.23 112.43 296+80.00 17.32 2.72 3.16 81.86 2.32 5.16 0.33 112.47 296+85.00 17.86 2.84 3.26 82.28 2.60 5.12 0.46 112.47 296+90.00 20.47 3.17 3.55 93.89 0.67 4.12 0.30 112.47 296+95.00 23.06 3.56 4.03 121.35 0.00 2.49 0.06 126.3 297+00.00 23.98 3.77 4.36 126.24 0.00 1.74 0.00 126.3 297+05.00 24.4 3.94 4.48 126.79 0.00 1.62 0.00 126.3 297+10.00 24.75 4.11 4.55 130.58 0.00 1.36 0.00 128.01 297+15.00 25.33 4.24 4.64 134.02 0.00 1.02 0.00 128.9 297+20.00 26.04 4.27 4.76 131.68 0.00 0.89 0.00 126.74 297+25.00 27.05 4.35 4.92 129.03 0.00 0.87 0.00 126.18 297+30.00 27.55 4.48 5.06 124.60 0.00 0.96 0.00 126.18 297+35.00 28.16 4.60 5.16 121.34 0.00 0.99 0.00 126.88 297+40.00 28.58 4.72 5.25 126.00 0.00 0.87 0.00 129.29 297+45.00 30.69 4.76 5.49 131.10 0.00 0.79 0.00 126.18 297+50.00 29.03 4.68 5.53 101.98 0.00 0.73 0.00 98 297+55.00 28.27 4.55 5.31 79.71 0.00 0.52 0.00 73.06 297+60.00 28.97 4.48 5.30 73.28 0.00 0.23 0.00 60.54 297+65.00 26.19 4.59 5.11 49.07 0.00 0.09 0.00 36.72 297+70.00 23.41 4.78 4.59 34.41 0.00 0.04 0.00 22.14 297+75.00 21.08 4.94 4.12 23.45 0.00 0.00 0.00 14.15 297+80.00 18.67 5.16 3.68 0.00 0.00 0.00 0.00 0 297+85.00 17.3 5.51 3.33 0.00 0.00 0.00 0.00 0 297+89.22 3.22 2.71 1.61 0.00 0.00 0.08 0.00 0
Grand Total: 208.44 239.92 CYD 123.72 21.72 CYD
ROADWAY EXCAVATION VOLUMES EMBANKMENT CONSTRUCTION VOLUMES
PARKING AREA EARTHWORK
Original Surface:
Type:
Design Surface:
Type:
Cut Factor: 1 Fill Factor: 1
Cut: 21753.32 cu ft Fill: 10.1 cu ft Net: 21743.22 cu ft
Cut: 805.68 cu yd Fill: 0.37 cu yd Net: 805.3 cu yd
Mitchell_Point- Hood_River_tin Existing
Parking Area Subgrade
Design
GABION BERM STATION 50+00 to 52+25
Station Roadway
Excavation Area
Roadway Excavation
Volume
Embankment Construction
Area
Embankment Construction
Volume 50+00.00 40.14 0 1.89 0 50+01.00 40.22 1.49 2.00 0.07 50+05.00 40.26 5.96 2.43 0.33 50+10.00 39.48 7.38 2.91 0.49 50+15.00 38.07 7.18 3.19 0.57 50+20.00 37.15 6.96 4.29 0.69 50+25.00 39.50 7.1 5.35 0.89 50+30.00 42.27 7.57 6.06 1.06 50+35.00 42.59 7.86 5.97 1.11 50+40.00 37.10 7.38 5.60 1.07 50+45.00 30.87 6.29 5.02 0.98 50+50.00 24.25 5.1 4.65 0.9 50+55.00 17.69 3.88 4.52 0.85 50+59.72 22.68 3.53 4.30 0.77 50+60.00 22.36 0.23 4.30 0.04 50+61.00 21.52 0.81 4.35 0.16 50+65.00 16.69 2.83 5.35 0.72 50+70.00 12.03 2.66 8.36 1.27 50+75.00 10.27 2.07 12.85 1.96 50+76.17 10.07 0.44 14.06 0.58 50+80.00 9.38 1.38 21.54 2.52 50+85.00 8.35 1.64 33.85 5.13 50+90.00 7.44 1.46 34.50 6.33 50+95.00 6.89 1.33 36.47 6.57 50+95.05 6.88 0.01 36.49 0.06 51+00.00 6.16 1.2 36.04 6.65 51+05.00 4.48 0.99 34.57 6.54 51+08.00 3.97 0.47 35.48 3.89 51+10.00 3.40 0.27 35.92 2.65 51+15.00 2.00 0.5 36.02 6.66 51+16.64 1.55 0.11 36.12 2.19 51+20.00 1.02 0.16 33.94 4.36 51+25.00 0.09 0.1 31.26 6.04 51+30.00 0.00 0.01 33.26 5.97 51+35.00 0.00 0 36.19 6.43 51+38.36 0.00 0 37.90 4.61 51+40.00 0.00 0 38.00 2.31 51+41.23 0.00 0 38.02 1.73 51+45.00 0.00 0 37.77 5.3 51+50.00 0.00 0 36.42 6.87 51+55.00 0.00 0 33.91 6.51 51+60.00 0.00 0 32.55 6.15 51+60.25 0.00 0 32.52 0.3 51+65.00 0.00 0 31.66 5.64 51+70.00 0.00 0 30.02 5.71 51+75.00 0.00 0 27.94 5.37 51+80.00 0.41 0.04 24.83 4.89 51+80.89 0.72 0.02 24.55 0.82 51+84.00 1.73 0.14 23.51 2.76 51+85.00 1.74 0.06 23.71 0.87 51+90.00 1.41 0.29 24.51 4.46 51+95.00 0.98 0.22 25.25 4.61 52+00.00 0.44 0.13 25.00 4.65 52+05.00 0.00 0.04 18.72 4.05 52+10.00 0.00 0 14.04 3.03 52+15.00 0.00 0 9.61 2.19 52+20.00 0.00 0 4.90 1.34 52+23.99 5.07 0.37 1.96 0.51 52+25.00 6.79 0.22 0.88 0.05
97.9 171.26 cuyd cuyd
Grand Total:
EMERGENCY VEHICLE TURNAROUND EARTHWORK
Original Surface:
Type:
Design Surface:
Type:
Cut Factor: 1 Fill Factor: 1
Cut: 16616.19 cu ft Fill: 0.1 cu ft Net: 16616.09 cu ft
Cut: 615.41 cu yd Fill: 0 cu yd Net: 615.41 cu yd
Design
ExistingGround Existing East Turnaround- Subgrade