(O)PriceProposalForm.docx

DOCX document 21 KB Posted

Attached to
B564 INSTALL CWP EVAPORATOR
Solicitation number
ACQR6101754
Issued by

About this file

This is a Price Proposal Form for a naval construction project at Naval Submarine Base New London in Groton, CT. The solicitation (ACQR6101754) is limited to specific contractors listed under MACC ML-C00068, including Benaka Inc., CCI Utility and Construction Services, and others. The project involves installing a Controlled Pure Water (CPW) Evaporator in Building 564's Enclosed Storage Area, which includes comprehensive installation work such as a new mezzanine, stairs, railings, bollards, transfer pump, piping, electrical systems, and associated demolition. The contract has a 270-day duration with liquidated damages of $241 per day, and requires the contractor to provide all necessary labor, materials, and equipment to complete the specialized infrastructure upgrade.

View the file

Other files

File Type Posted
RFP_ACQR6101754_R1.pdf PDF
(E)DBA CT20250024 4.25.25.pdf PDF
Amendment 00002.pdf PDF
Amendment 00001.pdf PDF
RFP_ACQR6101754.pdf PDF
(C)Engineering Calculation.pdf PDF
(F)UFGS 01 31 23.13 20.pdf PDF
(I)2016-R-0149.pdf PDF
(L)Base Requirements.pdf PDF
(B)Drawings.pdf PDF
(G)CERT-141.pdf PDF
(H)Guide to Sales and Use Taxes.pdf PDF
(J)Map to B135.pdf PDF
(K)Base Map.pdf PDF
(N)NAVFAC RFI Form.docx DOCX document
(A)B564 CPW EVAP Specifications.pdf PDF
(D)NEPA.pdf PDF
(E)DBA CT20250024.pdf PDF
(M)Base Access Pass Request.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM

ACQR 6101754

PROJECT TITLE: B564 INSTALL CPW EVAPORATOR

LOCATION: NAVAL SUBMARINE BASE NEW LONDON, GROTON, CT

The term “Offeror” has the same definition as used within this contract.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN 0001 - The Contractor shall provide all labor, materials, and equipment to provide and install a new mezzanine, stairs, railings, bollards, Controlled Pure Water (CPW) Evaporator, revetment plan, transfer pump, concrete housekeeping pad, filter, gauges, valves, unions, stainless steel piping, hangers, supports, exhaust stack, roof penetration, flashing, fire protection, electrical, controls, startup, testing, demolition, and all associated work. Location of work is the Enclosed Storage Area (ESA), Building 564, Naval Submarine Base New London, Groton CT.

DURATION:270 DAYS
LIQUIDATED DAMAGES:$241.00 PER DAY

PRICE FOR CLIN 0001 $______________ ______

TOTAL PRICE (SUM OF CLINs): $______________ ______

Offeror: __________________________________________

Name: __________________________________________

Signed: __________________________________________

Date: __________________________________________

File details come from the government source that posted it. Updated .