RFP_ACQR6101754_R1.pdf
PDF 191 KB Posted
- Attached to
- B564 INSTALL CWP EVAPORATOR
- Solicitation number
- ACQR6101754
About this file
This is a Request for Proposal (RFP) for a construction task order at Naval Submarine Base New London in Groton, Connecticut. The solicitation (ACQR6101754) is limited to seven pre-qualified contractors from the North Area Multiple Award Construction Contract (MACC) and requires installing a Controlled Pure Water (CPW) Evaporator in Building 564's Enclosed Storage Area. The project scope includes constructing a new mezzanine, installing various mechanical and electrical components, performing demolition work, and completing associated infrastructure modifications.
Key details include a proposal due date of 09 June 2025 at 10:00AM EDT, with proposals to be emailed to specified Navy contacts. The estimated project value is between $500,000 to $1,000,000, with a 270-calendar day completion timeline. Award is anticipated for 30 June 2025, and the evaluation will be based solely on lowest price. Contractors must attend a mandatory site visit on 20 March 2025 and comply with specific base access and identification requirements. The solicitation includes multiple attachments covering specifications, drawings, engineering calculations, and environmental documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (E)DBA CT20250024 4.25.25.pdf | ||
| Amendment 00002.pdf | ||
| Amendment 00001.pdf | ||
| RFP_ACQR6101754.pdf | ||
| (I)2016-R-0149.pdf | ||
| (L)Base Requirements.pdf | ||
| (O)PriceProposalForm.docx | DOCX document | |
| (C)Engineering Calculation.pdf | ||
| (F)UFGS 01 31 23.13 20.pdf | ||
| (B)Drawings.pdf | ||
| (G)CERT-141.pdf | ||
| (H)Guide to Sales and Use Taxes.pdf | ||
| (J)Map to B135.pdf | ||
| (K)Base Map.pdf | ||
| (N)NAVFAC RFI Form.docx | DOCX document | |
| (A)B564 CPW EVAP Specifications.pdf | ||
| (D)NEPA.pdf | ||
| (E)DBA CT20250024.pdf | ||
| (M)Base Access Pass Request.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC
9324 VIRGINIA AVE, BLDG Z-144, ROOM 225
NAVAL STATION NORFOLK, NORFOLK, VA 23511
POC: Philip Cole, 757-341-1970, philip.j.cole@navy.mil
DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE
QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR
FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE
CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW
JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT
PROPOSED TASK ORDER: ACQR6101754 B564 INSTALL CPW EVAPORATOR
DATE OF SOLICITATION: 12 March 2025
NORTH AOR MACC CONTRACT HOLDERS:
N40085-21-D-0052
Benaka Inc.
7 Lawrence Street
New Brunswick, New Jersey 08901
POC: C.N. Manjunath
Phone: (732) 246-7060
Email: benaka@benakainc.com
N40085-21-D-0053
CCI Utility and Construction Services, LLC
111 W. 16th Avenue, Suite 402
Anchorage, AK 99501
POC: Ralph Snow, Jeffrey Eaton, Tim Nichols
Phone: (207) 485-6701
Email: rsnow@cci-alliance.com jeaton@cci-alliance.com const-estimating@bbch-llc.com const-proposals@bbch-llc.com
N40085-21-D-0054
Kunj Construction Corporation
163 B Paris Avenue
Northvale, NJ 07647
POC: Neekunj Bhanderi
Phone: (201) 694-7617
Email: neekunjb@gmail.com
N40085-21-D-0055
Ocean Construction Services
104 Aragona Boulevard, Suite 101
Virginia Beach, VA 23462
POC: Kara Laskowski
Phone: (757) 200-9590
Email: bids@ocsinc.us
N40085-21-D-0056
PEM-Harkins Joint Venture
6161 Busch Boulevard, Suite 255
Columbus, OH 43229
POC: Radagodage Sumanaweera
Phone: (614) 573-7299
Email: tsumanaweera@peminc.biz
N40085-21-D-0057
Tantara Corporation
54 Mason Street
Worcester, MA 01610
POC: Dawn Dearborn
Phone: (508) 752-5599
Email: DDearborn@tantaracorp.com mailto:philip.j.cole@navy.mil mailto:benaka@benakainc.com mailto:rsnow@cci-alliance.com mailto:jeaton@cci-alliance.com mailto:const-estimating@bbch-llc.com mailto:const-proposals@bbch-llc.com mailto:neekunjb@gmail.com mailto:bids@ocsinc.us mailto:tsumanaweera@peminc.biz mailto:DDearborn@tantaracorp.com
N40085-21-D-0066
J&J Contractors, Inc.
101 Billerica Avenue, Building 5, Suite 205
North Billerica, MA 01862
POC: Kamlesh Patel
Phone: (978) 259-2454
Email: kamp@jjcontractor.com
GENERAL REQUIREMENTS
NAVFAC Solicitation No: ACQR6101754
NAVFAC Specification Work Order No: 1824402
Title: B564 Install CPW Evaporator
Location of Work: Naval Submarine Base New London, Groton CT
Description of Work: Base Contract: The scope of this project is to provide and install a new mezzanine, stairs, railings, bollards, Controlled Pure Water (CPW) Evaporator, revetment pan, transfer pump, concrete housekeeping pad, filter, gauges, valves, unions, stainless steel piping, hangers, supports, exhaust stack, roof penetration, flashing, fire protection, electrical, controls, startup, testing, demolition, and all associated work. Seal/firestop new penetrations through walls or ceilings. The CPW Evaporator is Government Furnished Material (GFM). All piping and hardware must adhere to commercial cleanliness procedures per ASME B31.3. Location of work is the Enclosed Storage Area (ESA), Building 564, Naval Submarine Base New London, Groton, CT. (Attachment A-D)
FAR 36.204(e) Disclosure of Magnitude of Construction: $500,000 to $1,000,000.
NAICS Code: 236220
FSC/PSC: C1JZ
Time for completion: All work shall be completed within 270 calendar days after Notice to
Proceed. Construction Notice to Proceed anticipated to start within 90 calendar days from contract effective date. Estimate award date of 30 June 2025.
The price shall be held at least 90 days.
Wage Determination: The following Department of Labor (DOL) General Wage Decisions applies to this Task Order: General Decision Number: CT20250024 Mod 4 dated 04/25/2025
(Attachment E). Should these wage determinations be updated by the DOL prior to award, the most current wage determination will be incorporated at time of award.
Clauses Incorporated by Reference:
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance
Services or Equipment mailto:kamp@jjcontractor.com
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment (NOV 2021)
52.204-26, Covered Telecommunications Equipment or Services-Representation
52.204-27 Prohibition on a Bytedance Covered Application (June 2023)
52.211-15 Defense Priority and Allocation Requirements (APR 2008)
52.222-50 Combating Trafficking in Persons (CTIP)
252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting
(DEVIATION 2024-O0013 REVISION 1)
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements (MAR 2022)
252.204-7020 NIST SP 800-171 DoD Assessment Requirements (JAN 2023)
252.225-7059, Prohibition on Certain Procurements from the Xinjiang Uyghur
Autonomous Region – Representation (Jun 2023)
252.225-7060, Prohibition on Certain Procurements from the Xinjiang Uyghur
Autonomous Region (Jun 2023)
252.225-7966, Prohibition Regarding Russian Fossil Fuel Business Operations –
Representation (MAR 2024)
252.225-7967, Prohibition Regarding Russian Fossil Fuel Business Operations (FEB 2024)
252.232–7006 Wide Area Work Flow Payment Instructions (JAN 2023)
Clauses Incorporated by Full Text:
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 days from date of the award.* The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 Liquidated Damages-Construction (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the
Contractor shall pay liquidated damages to the Government in the amount of $241.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.219-14 LIMITATIONS ON SUBCONTRACTING (FEB 2023) (DEVIATION 2021-
O0008)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry
Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in
19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts
19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American
Industry Classification System (NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:
(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.
(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the
Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause–
__ By the end of the base term of the contract and then by the end of each subsequent option period; or
_X By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
52.228-1 Bid Guarantee (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g.,bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds
(including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.236-15 Schedules for Construction Contracts (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the
Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the
Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting
Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the
Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the
Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the
Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management
System (eCMS) is applicable to this solicitation.
https://www.navfac.navy.mil/products_and_services/ci/about_us/capital_improvements_docume nts.html (Attachment F)
Utilities: The Contractor is responsible for providing all of their own utilities.
https://www.navfac.navy.mil/products_and_services/ci/about_us/capital_improvements_documents.html https://www.navfac.navy.mil/products_and_services/ci/about_us/capital_improvements_documents.html
CT Sales Tax: Contractors can fill out and use CERT-141, Contractor's Exempt Purchase
Certificate, as the Navy is a qualifying Federal agency. This form can be given to subcontractors for use to purchase materials for this specific solicitation/contract number. As a result, Bidder shall NOT include Connecticut Sales and Use Taxes in their Bid Price. Bidder shall, however, include all, if any, APPLICABLE Federal and Local taxes in their bid price. A tax exempt number will not be provided. (Attachments G-I)
SITE VISIT: 20 March 2025 8:45AM EDT at the Naval Submarine Base New London, CT
(Attachments J-M). Visitor requests must be received no later than 10:00AM EDT, 17 March
2025 via e-mail to: robert.l.sosnoski.civ@us.navy.mil and nicole.l.fellers.civ@us.navy.mil.
Contractors who do not currently have a Rapid Gate Pass must submit a one day pass request using Base Access Pass Request Form (Attachment M) no later than 10:00AM
EDT, 17 March 2025 via e-mail to: robert.l.sosnoski.civ@us.navy.mil and nicole.l.fellers.civ@us.navy.mil.
This will be the only Government scheduled site visit. For this visit, all attendees will be required to view a radiation awareness video to gain access to the areas. Please send the attendee names and their company no later than the date assigned above, or access will not be permitted.
Due to the training and safety requirements associated with this space, prompt attendence to the
8:45AM EDT time is imperative. Contractors are urged to pick up their ONE-DAY passes no later than 8:00AM EDT on 20 March 2025, to avoid an potential issues with base access.
1. Location: Meet at Building 135 no later than 8:45AM EDT. Please enter the main parking lot entrance on the west side of the building.
2. Pre-Site Visit Requirements:
a. All visitors must show valid photo identification to enter. Valid ID include: (1) verified driver’s license with a star on it, (2) an unverified driver’s license with a certified copy of birth certificate and social security card, OR (3) unverified driver’s license with valid
U.S. passport. All vehicles must have current registration and insurance.
b. All visitors must be U.S. citizens.
3. Site Visit Restrictions: Electronic devices may be prohibited in the building. There will be no ladders for contractors to use.
4. Badging: You must go to the pass and ID office before entering the base.
Request for Information (RFIs): RFIs must be submitted in writing utilizing the attached RFI form (Attachment N) via email to nicole.l.fellers.civ@us.navy.mil. Multiple RFIs may be submitted in letter format on company letter head, but must contain the same level of detail required on RFI form.
An amendment will be issued with the consolidated RFIs answered. No further questions will be taken after 10:00AM EDT on 03 April 2025.
mailto:ryan.g.hamill2.civ@us.navy.mil mailto:nicole.l.fellers.civ@us.navy.mil mailto:ryan.g.hamill2.civ@us.navy.mil
**Proposal Due Date: 09 June 2025 at 10:00AM EDT
Proposals must be emailed to nicole.l.fellers.civ@us.navy.mil and shawn.a.drake3.civ@us.navy.mil.
EVALUATION FACTORS FOR AWARD:
1. The solicitation requires the evaluation of Price.
2. The proposed Task Order will be awarded to the lowest evaluated price.
PRICE
1. Price Submission:
Offeror shall submit one electronic proposal with the following:
• Price Proposal Form (Attachment O)
• Copy of Representation and Certifications from SAM.gov.
• Bid Bond
• 8 ½ X 11 format
• Times New Roman, 12 point font
• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, TIN, UIE, Cage Code, Point of Contact, Phone Number, and Email Address.
2. Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the basic requirements and any option items.
Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
a. Comparison of proposed prices received in response to the RFP.
b. Comparison of proposed prices with the Independent Government Cost Estimate (IGCE).
c. Comparison of Proposed prices with available historical information.
d. Comparison of market survey results.
EVALUATION
1. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)).
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
2. The process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price.
ATTACHMENTS
ATTACHMENT A – Specifications
ATTACHMENT B – Drawings
ATTACHMENT C – EB Engineering Calculations
ATTACHMENT D – NEPA Environmental Checklist mailto:shawn.a.drake3.civ@us.navy.mil
ATTACHMENT E – Wages CT20250024
ATTACHMENT F – ECMS Contractors Guide, UFGS 01 31 23.13 20
ATTACHMENT G – CERT-141 Tax Form
ATTACHMENT H – Guide to Taxes
ATTACHMENT I – 2016-R-0149 Tax Info
ATTACHMENT J – Map to B135
ATTACHMENT K – Base Map
ATTACHMENT L – General Requirements
ATTACHMENT M – Base Access Pass Request
ATTACHMENT N – NAVFAC RFI Form
ATTACHMENT O – Price Proposal Form