This document is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) for Solicitation ACQR6101754. The amendment makes five key modifications:
- Revised the anticipated construction start date to within 90 days of contract award, with an estimated contract award date of 30-June-2025. 2. Updated the Wage Determination General Decision Number to CT20250024 Mod 4 dated 04/25/2025. 3. Extended the Proposal Due Date to 09-June-2025. 4. Updated the primary Point of Contact to Contract Specialist Nicole Fellers. 5. Added an alternate Point of Contact, Contracting Officer Shawn Drake. The solicitation is for a project at Naval Submarine Base New London in Groton, CT, involving installation of a Controlled Pure Water (CPW) Evaporator and associated infrastructure work in Building 564. Only pre-approved contractors from MACC ML-C00068 are eligible to bid on this requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_ACQR6101754_R1.pdf | ||
| (E)DBA CT20250024 4.25.25.pdf | ||
| Amendment 00001.pdf | ||
| RFP_ACQR6101754.pdf | ||
| (C)Engineering Calculation.pdf | ||
| (F)UFGS 01 31 23.13 20.pdf | ||
| (A)B564 CPW EVAP Specifications.pdf | ||
| (D)NEPA.pdf | ||
| (E)DBA CT20250024.pdf | ||
| (M)Base Access Pass Request.pdf | ||
| (I)2016-R-0149.pdf | ||
| (L)Base Requirements.pdf | ||
| (O)PriceProposalForm.docx | DOCX document | |
| (B)Drawings.pdf | ||
| (G)CERT-141.pdf | ||
| (H)Guide to Sales and Use Taxes.pdf | ||
| (J)Map to B135.pdf | ||
| (K)Base Map.pdf | ||
| (N)NAVFAC RFI Form.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
00002
Solicitation ACQR6101754 Amendment 00002 incorporates the following:
1. The anticipated start date of April 2026 is hereby revised. The new anticipated start date for construction is within 90-days of contract award. Contract estimated award date is 30-June-2025 (see RFP_ACQR6101754_R1 Highlights)
2. Update Wage Determination General Decision Number: CT20250024 Mod 4 dated 04/25/2025. (See updated Attachment E)
3. The Proposal Due Date is hereby extended to 09-June-2025. (see RFP_ACQR6101754_R1 Highlights)
4. POC is Contract Specialist Nicole Fellers, nicole.l.fellers.civ@us.navy.mil
5. Alternate POC is Contracting Officer Shawn Drake, shawn.a.drake3.civ@us.navy.mil
N A V F A C S Y SC O M MI D -A TLA N TI C
PW D N EW LO N D O N
B O X 4 00 . B LD G 1 3 5
N A V A L S U B MA R I N E B A SE N EW LO N D O N
G R O TO N C T 0 6 34 9-50 26
J
ACQR6101754
ACQR6101754
05/07/2025
03/12/2025