(N)NAVFAC RFI Form.docx
DOCX document 25 KB Posted
- Attached to
- B564 INSTALL CWP EVAPORATOR
- Solicitation number
- ACQR6101754
About this file
This document is a Request for Information (RFI) form from the Naval Facilities Engineering Command (NAVFAC) related to a specific contract opportunity for installing a Controlled Pure Water (CPW) Evaporator at Naval Submarine Base New London in Groton, CT. The solicitation (ACQR6101754) is limited to pre-qualified contractors from the MACC ML-C00068 list, which includes seven specific companies such as Benaka Inc., CCI Utility and Construction Services, and Ocean Construction Services.
The project requires comprehensive installation services including a new mezzanine, stairs, railings, bollards, transfer pump, concrete housekeeping pad, piping, supports, exhaust stack, roof penetration, fire protection, electrical systems, and associated work within Building 564's Enclosed Storage Area. The RFI form provides a standardized mechanism for contractors to request additional information, with a clear disclaimer that the form does not authorize proceeding with work and that any changed conditions must be reported to the Contracting Officer within 20 calendar days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_ACQR6101754_R1.pdf | ||
| (E)DBA CT20250024 4.25.25.pdf | ||
| Amendment 00002.pdf | ||
| Amendment 00001.pdf | ||
| RFP_ACQR6101754.pdf | ||
| (C)Engineering Calculation.pdf | ||
| (F)UFGS 01 31 23.13 20.pdf | ||
| (I)2016-R-0149.pdf | ||
| (L)Base Requirements.pdf | ||
| (O)PriceProposalForm.docx | DOCX document | |
| (B)Drawings.pdf | ||
| (G)CERT-141.pdf | ||
| (H)Guide to Sales and Use Taxes.pdf | ||
| (J)Map to B135.pdf | ||
| (K)Base Map.pdf | ||
| (A)B564 CPW EVAP Specifications.pdf | ||
| (D)NEPA.pdf | ||
| (E)DBA CT20250024.pdf | ||
| (M)Base Access Pass Request.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
| REQUEST FOR INFORMATION |
| RFI NUMBER: |
CONTRACT TITLE:
PRIME CONTRACTOR:
SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S):
DETAIL(S):
SPECIFICATION:
CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: |_| DECREASE: |_| NONE: |_|
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date Response Required By: Date: Signature:
From:
To: Field Office Name Code
RECOMMENDATION:
Date: Signature:
From: Field Office Name To: Prime Contractor
REPLY:
Date: Signature:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC |_| PL/DM |_| ET |_| A/E |_| PC # via AROICC/CONTRACT OFFICER