The document is an Evaluation Criteria template for a government procurement process, likely applicable to multiple jurisdictions and contract opportunities. The template provides a standardized 50/50 point allocation between technical proposal (50 points) and cost (50 points), with technical points subdivided across four key areas: project understanding and capability (25 points), experience of key staff and project team (15 points), professional references (5 points), and firm representation projects and depth (5 points). The evaluation framework allows agencies flexibility in weighting specific technical criteria while maintaining a consistent overall scoring approach.

The template serves as a flexible evaluation instrument that can be customized for different procurement scenarios, enabling systematic and objective assessment of vendor proposals. By providing a structured point distribution, the template helps procurement teams consistently evaluate complex technical submissions and cost proposals, ensuring a comprehensive and balanced review process that considers both qualitative and financial factors. The document does not specify a particular contract or jurisdiction but appears designed as a reusable framework for government procurement evaluations across various service and product acquisitions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION CRITERIA – EXAMPLE

Instructions: The standard point distribution is 50 points for technical proposal package content and 50 points for cost. How the technical points are distributed is entirely up to you. It is recommended to place a higher point value on items that are more meaningful or substantive. If you are proposing a deviation from the 50/50-point distribution, please include a description of why the deviation is necessary below the table.

Item #
Evaluation Criteria Description
Points

Technical Points

1
Project understanding, approach, and capability
25
2
Experience of key staff and project team proposed.

· Project Management

· Technical expertise

· Organizational structure and capacity

· Key personnel qualifications

3
Professional References
5
4
Firm representation projects and depth
5

Cost Points

5
Price

Total

If applicable, describe why a deviation from the 50/50-point distribution is being requested: