Attachment_01-OneSAF_IDIQ_PWS-Original Solicitation.docx

DOCX document 194 KB Posted

Attached to
One Semi-Automated Forces (OneSAF) Solicitation
Solicitation number
Not on record
Issued by

About this file

This document is a Performance Work Statement (PWS) for the One Semi-Automated Forces (OneSAF) program. The PWS defines the effort required to execute the OneSAF program requirements for development, test, integration, interoperability, support, and delivery of software, data, and documentation products. OneSAF is a software product line that supports modeling and simulation of force modernization and transformation from weapons systems to Brigade and below level combat. Key objectives include maintaining and enhancing the OneSAF software product line, providing capability development and enhancements, executing system engineering and software development processes, and providing customer support and training. The PWS also outlines program management requirements, configuration management, cybersecurity, and transition planning. Deliverables include software releases, technical reports, test plans, and training materials. The PWS will be used as part of a solicitation for an Indefinite Delivery Indefinite Quantity contract to support the OneSAF program.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R yo

Performance Work Statement (PWS) For One Semi-Automated Forces (OneSAF) PRODUCTION AND SUPPORT Indefinite Delivery Indefinite Quantity

23 June 2024 Version 1.2

Prepared by U.S. Army PEO Simulation, Training, and Instrumentation (PEO STRI) 12211 Science Drive Orlando, FL 32826-3276

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

Revision Level
Document Date
Summary of Change
Pages Affected
1.0
25 September 2023
Initial release of Draft RFP
All
1.1
12 February 2024
Update to draft
All
1.2
24 June 2024
Update due to SRB comments
All

Summited by:

Angela Stacy Assistant Program Manager PEO STRI; PM SE; PD CSS

Table of Contents

SCOPE6
Background6
Development Environment7
APPLICABLE DOCUMENTS8
Department of Defense (DoD Guidance)8
Other Government Documents, Drawings, and Publications9
Other OneSAF Products9
REQUIREMENTS15
Program Management15
Contract Management16
Enterprise-wide Contractor Manpower Reporting Application (eCMRA)16
Subcontractor Management16
Financial Management16
Risk Management17
Organizational Process Management17
Government Furnished Property (GFP) Management17
Purchase of Commercial Information Technology (IT) Equipment18
Integrated Product Teams (IPT)18
Post Award Conference (PAC)18
Personnel Requirements18
Key Personnel18
Cyberspace Workforce Management19
Security Clearances19
OneSAF Processes20
Systems Engineering20
Systems Integration21
Software Engineering and Development21
Quality Assurance (QA)22
Configuration Management (CM) and Control23
OneSAF Software Product Line Management and Support23
Test Program24
Maintenance and Problem Ticket Report (PTR) Support24
Co-Developer Support24
Cloud Enabled25
OneSAF Software Product Baseline Reelase23
Tailored OneSAF Software Product Baseline Release23
Capability Development27
Concurrency Capability Development27
Mission Command Adapter (MCA)27
Standard File Format (SFF)27
Environmental Runtime Component (ERC)27
Military Organization and Equipment Representation Currency27
P3I Capability Development27
Bifrost Maintenance28
Customer Support29
Foreign Military Sales (FMS) Support29
OneSAF Help Desk29
Software Distribution30
Training30
OneSAF Development Environment & Facilities30
Government Furnished Information (GFI)31
Government Provided Facility (GPF) Obsolescence/Technology Refresh31
Development Environment Extensions32
Government Provided Facility (GPF) Documentation32
Transition32
Transition-In Plan32
Transition-Out Plan33
Cybersecurity34
OneSAF Application Cybersecurity34
Cybersecurity35
Cybersecurity Personnel35
Security35
Safeguards36
Dissemination Of Export-Controlled Technical Information and Data37
Operations Security (OPSEC)37
Common Access Card (CAC) Protection Policy and Procedures38
Performance or Delivery in a Foreign Country38
Handling or Access to Classified Information38
Army Training Certification Tracking System (ATCTS) Registration38
Antiterrorism (AT Level I) Training39
3.20.6 AT Awareness Training39
OPSEC Training39
Threat Awareness Reporting Program (TARP)39
Cybersecurity/Information Technology (IT) Training39
Cybersecurity/IT Certification40
Controlled Unclassified Information (CUI)40
Travel40
Technical Data, Noncommercial Computer Software and Noncommercial Computer Software Documentation41
Data Handling of Controlled Unclassified Information (CUI)41
Definition41
Safeguarding CUI41
Control Unclassified Information (CUI)41
During Duty Hours42
During Non-Duty Hours42
Transmission of CUI Information42
Termination, Disposal, and Unauthorized Disclosure42
Termination42
Disposal42
Unauthorized Disclosure43
Logistics43
Definitions43
Accountability43
LIST OF ATTACHMENTS44
ACRONYM LIST45

Performance Work Statement For One Semi-Automated Forces (OneSAF)

1. SCOPE

This Performance Work Statement (PWS) defines the effort required for providing the capabilities needed to execute the overarching OneSAF program requirements for development, test, integration, interoperability, support, and delivery of software, data, and documentation products to the Assistant Program Manager OneSAF (APM OneSAF); the U.S. Army Modeling and Simulation (M&S) Communities (Acquisition, Analysis, Experimentation, Intelligence, Test and Evaluation, and Training); and the rest of the OneSAF User Community. The OneSAF User Community includes, without limitation, other U.S. Army Program Executive Offices (PEOs) and Program Managers (PMs), Training and Doctrine Command (TRADOC) Battle Labs, Research Development and Engineering Centers (RDECs) and agencies, other Department of Defense Services and Joint agencies, Government civilian organizations and agencies, academic institutions, foreign countries, and other OneSAF Co-Developers. OneSAF supports modeling and simulation of force modernization and transformation from weapons systems. OneSAF supports the Army goal of cloud and web-based software application development in order to reduce hardware and support costs plus to enable rapid training at both home station and distributed locations.

OneSAF is a software product line consisting of a set of interacting components where multiple components utilize common services to satisfy a diverse set of OneSAF use cases. The OneSAF Product Line Architecture Specification (PLAS) defines the System Compositions, Products, and Components within the OneSAF product line. The PLAS defines and describes the overall architecture that governs the products and components within the OneSAF product line and illustrates how the product line can be used to construct systems that meet the OneSAF requirements.

The OneSAF Production & Support effort consists of conceptual modeling, architectural, engineering, and software support required to enhance the OneSAF product line and correct deficiencies identified by the OneSAF Community. With Government concurrence, the OneSAF effort also includes accepting, modifying, integrating, and testing handover packages and new capabilities in support of the requirements of the OneSAF User Community. The effort also provides life cycle sustainment of annual version releases. This life cycle sustainment involves addressing maintenance updates, Problem Ticket Reports (PTRs), and security patches. The effort also entails on-site and remote support and training for the worldwide OneSAF Community. The effort includes final acceptance and test activities required to deliver the annual and tailored version releases and patches to support OneSAF Community requirements.

1.1. Background

OneSAF was formalized as an acquisition program in April 2000 with its designation as an Acquisition Category (ACAT) III program and delegation of the Milestone Decision Authority (MDA) to Commanding General (CG), Army Materiel Command

(AMC). OneSAF was formally chartered on 01 May 2000 by the Army Acquisition Executive (AAE) to manage all OneSAF efforts. On 16 May 2000, the MDA responsibility was delegated to the Commander STRICOM (subsequently re- designated as PEO STRI). In December 2003, Milestones B/C were approved by the MDA and the program moved forward with development of the Full Operational Capability (FOC) baseline. FOC was met in March 2006 and fielding was initiated in September 2006 with the release of OneSAF Version 1.0. Additional versions continue to be fielded with Pre-Planned Product Improvements (P3I) and Co- Developer handovers integrated into the baseline. OneSAF Version 12.0 was released in April 2023; Version 12.1 is planned for release in April 2024 and Version

12.2 is planned for release in November/December of 2024. OneSAF reached the ACAT II status and is currently in the support phase of the life cycle with ongoing software production and implementation of P3I as approved by the TRADOC Project Office (TPO) OneSAF.

Through these efforts, capability enhancements are continuously being developed and integrated into the baseline, typically resulting in at least an annual version release.

1.2. Development Environment

OneSAF Program has established a development environment that brings together Community/User representatives, Government team members, and Contractor software developers into a single government owned facility. The OneSAF contractor shall provide an integration, development, and test environment accessible by the OneSAF Community of users; OneSAF Government team; and the OneSAF contractor’s Integrated Product Team (IPT) members. This development environment shall provide a working environment for Contractors with access to all network infrastructure and software needed to promote effective software development. Facility operations, such as structural maintenance, physical access to the building shall be provided by the Contractor. The development environment shall be a Common Access Card (CAC)- enabled, protected network-connected environment that provides for development, integration, and testing of the OneSAF software. This environment provides the ability to share information to all authorized Government organizations, users, and developers simultaneously through CAC enabled Government accessible portals. The development environment allows the contribution of ideas, comments, suggestions, as well as exchanging program information, and collaboration in a distributed environment.

Through these efforts, capability enhancements are continuously being developed and integrated into the baseline, typically resulting in at least an annual version release.

OneSAF has been fielded to multiple Army users within the U.S. Army M&S Communities, as well as other DoD agencies and a multitude of industry, Foreign Military Sales (FMS), and academic locations. Concurrent with operations and apply to future task orders such as: P3I enhancements; base program requirements; Co- Developer integrations; FMS cases; UnITE, customer funded efforts; internal enhancements; enterprise efforts; trade studies; AoA; IDE efforts; research; pilots; and user feedback, these needs are continuously addressed to assure maximum utilization of the system throughout the growing User Community.

2. APPLICABLE DOCUMENTS

The following documents (or their most current and approved iteration) form a part of this PWS to the extent specified herein. In the event of a conflict between documents referenced herein, the inconsistency shall be resolved by giving precedence in the following order: (1) the contents of this PWS, the contents of the PWS shall be the governing requirement, (2) all remaining documents unless otherwise stated.

2.1. Department of Defense (DoD Guidance)

The following DoD guidance documents are available on the WWW at URL: https://www.esd.whs.mil/DD/

32CFR, Part 117
National Industrial Security Program Operating

Manual (NISPOM)

DoDD 8140.01
CYBERSPACE WORKFORCE MANAGEMENT
DoDI 8140.02
IDENTIFICATION, TRACKING, AND REPORTING OF CYBERSPACE WORKFORCE REQUIREMENTS
DoD-M 8140.03
CYBERSPACE WORKFORCE QUALIFICATION AND MANAGEMENT PROGRAM
DoDI 5000.02
Operation of the Defense Acquisition System
DoDI 5000.64
Accountability and Management of DoD Equipment and Other Accountable Property
DoDI 8500.01
Cybersecurity
DoDI 8510.01
Risk Management Framework (RMF) for DoD Information

Technology (IT)

DoDI 5200.46
DoD Investigative and Adjudicative Guidance for Issuing Common Access Cards (CAC)
DoDM 5200.48
DoD Instruction Controlled Unclassified Information (CUI)

The following DoD guidance documents are available on the WWW at URL: https://www.acquisition.gov/

DFARS 252.225-7043
Antiterrorism/Force Protection for Defense Contractors

Outside the US

FAR 31.205-46
Travel Costs
FAR 52.216-7
Allowable Cost and Payment

2.2. Other Government Documents, Drawings, and Publications The following are available on the WWW at URL http://csrc.nist.gov/publications/PubsSPs.htmlNIST SP 800-53 Assessing the Security Controls in Federal Information Systems and Organizations

NIST SP 800-171

Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations

The following are available on the WWW at URL https://armypubs.army.mil/ Army Regulation (AR) 25-1 Army Information Technology

AR 25-2
Army Cybersecurity
AR 380-5
Department of the Army Information Security Program
AR 380-10
Foreign Disclosure and Contact with Foreign Representatives
AR 380-49
Industrial Security Program
AR 380-67
Personnel Security Program
AR 381-12
Military Intelligence
AR 525-13
Antiterrorism
AR 530-1
Operations Security (OPSEC)
AR 710–2
Inventory Management
AR 710-4
Property Accountability Policies

The following are provided with the applicable web link: https://assist.dla.mil/online/start/

MIL-STD-961E
Unique Data Item Descriptions (UDIDs)
MIL-STD-963C
Data Item Descriptions (DIDs)

Joint Travel Regulation https://www.travel.dod.mil/Policy-Regulations/

Army Cloud Plan https://api.army.mil/e2/c/downloads/2022/10/14/106b220e/army-cloud-plan- 2022.pdf

2.3. Other OneSAF Products

The following Technical Data Package artifacts shall be provided:

OneSAF v12.0 Accreditation Documentation OneSAF v12.0 application software, documentation, and training materials OneSAF v12.0 RIB Items OneSAF v12.0 Use Cases OneSAF Distribution Agreement (DA) OneSAF Electronic Process Guide (EPG) OneSAF Product Line Requirement Specification (PLRS) OneSAF Product Line Architecture Framework (PLAF) OneSAF Product Line Architecture Specification (PLAS) OneSAF System Integration Plan (SIP), Revision 17 January 2023

The table below contains the potential deliverable items, not all inclusive, that may be identified at the Task Order (TO) level, throughout the life of this contract. Additional deliverable items shall be identified on each individual TO as required per the requirements.

CDRL #

DID

CDRL Title

CDRL Subtitle

Due to Gov Preliminary/ Final

Days for Gov Review
Days to Incorp. Comments

A001

DI-MGMT- 80227

Contractor's Progress, Status and Management Report

CPSMR

SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD. SHALL CONTINUE MONTHLY THROUGH THE

LIFE OF THE CONTRACT.

A002

DI-MISC- 80711A

Scientific and Technical Reports

Process Report

SHALL BE DUE 120 DAYS AFTER PAC. SHALL BE DUE THREE TIMES ANNUALLY THROUGH END

OF CONTRACT.

A003

DI-MGMT- 81334

Contract Work Breakdown Structure

SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD. REVISIONS SHALL CONTINUE AS REQUIRED THROUGH THE LIFE OF THE

CONTRACT.

A004

DI-MGMT- 80259

Physical Inventory Reports

SHALL BE UPDATED AFTER THE FIRST SUBMISSION AS REQUIRED BY INVENTORY CHANGES, SUBMISSIONS REQUIRING APROVAL

SHALL BE PROVIDED FORTY-FIVE (45) DAYS PRIOR TO COMPLETION OF EACH OPTION

YEAR ON AN ANNUAL BASIS.

A005

DI-IPSC- 81429A

SOFTWARE TRANSITION PLAN (STrP)

RAFT SUBMISSION SHALL BE DUE TWELVE (12) MONTHS PRIOR TO THE END OF THE CONTRACT. FINAL SUBMISSION SHALL BE DUE SIX

(6) MONTHS PRIOR TO THE

END OF THE CONTRACT.

A006

Technical Report SHALL BE DUE AS REQUIRED BY THE GOVERNMENT 30 DAYS FOLLOWING COMPLETION OF A SIGNIFICANT EVENT OR DEVELOPMENT, INTEGRATION AND TEST ACTIVITY. TECHNICAL REPORT SHALL BE DUE 90 DAYS PRIOR TO THE END OF THE

A007

DI-SESS- 80639D

Engineering Change Proposal (ECP)

SHALL BE DUE 30 DAYS AFTER IDENTIFYING A CHANGE TO ANY ESTABLISHED

BASELINE.

A008

Integrated Development Environment

UBSEQUENT SUBMISSIONS DUE ANNUALLY FOR THE LENGTH OF

THE CONTRACT. FINAL SUBMISSION SHALL BE DUE 60 DAYS PRIOR TO THE

END OF CONTRACT.

B001

DI-MCCR- 80700

Computer Software Product End Items (CSPEI)

OneSAF and Bifrost/MSSV Software Version Release

SHALL BE DUE FOR EACH RELEASE OF THE SOFTWARE THROUGH THE LIFE OF THE

DELIVERY ORDER.

B002

OneSAF Bifrost/MSSV Product Line Architecture Specification SHALL BE DUE AT EVERY DOMESTIC SOFTWARE RELEASE. REVISIONS AS REQUIRED THROUGH LIFE

OF THE CONTRACT.

B003

OneSAF Bifrost/MSSV Product Line Requirement Specification SHALL BE DUE AT EVERY DOMESTIC SOFTWARE RELEASE. REVISIONS AS REQUIRED THROUGH LIFE

OF THE CONTRACT.

B004

OneSAF Bifrost/MSSV System Integration Plan INITIAL SUBMISSION DUE 30 DAYS AFTER CONTRACT AWARD. SUBSEQUENT SUBMISSIONS SHALL OCCUR ANNUALLY THROUGH THE LIFE OF THE

B005

DI-MGMT- 82000

OneSAF RMF Package

SHALL BE DUE 60 DAYS PRIOR TO A PRODUCT VERSION RELEASE AND 60 DAYS PRIOR TO AN ACCREDIDATION EVENT.

4. REVISIONS AS NEEDED THROUGHOUT CONTRACT

PERIOD OF PERFORMANCE.

B006

DI-IPSC- 80603A

Software Test Plan

SHALL BE DUE 30 DAYS AFTER INITIAL PLANNING CONFERENCE FOR EACH SOFTWARE VERSION RELEASE.

SHALL BE DUE FOR EACH RELEASE OF THE SOFTWARE THROUGH THE LIFE OF THE CONTRACT. GOVERNMENT APPROVAL SHALL BE REQUIRED PRIOR TO THE START OF

ANNUAL RELEASE TESTING.

C001

OneSAF and Bifrost/MSSV Operator Manual REVISIONS AS REQUIRED WITH EACH B001 SOFTWARE DELIVERY AND SHALL INCLUDE UPDATES TO THE

OPERATOR MANUAL

C002

OneSAF and Bifrost/MSSV Maintenance Manual SHALL BE DUE WITH EACH B001 SOFTWARE DELIVERY AND SHALL INCLUDE INCORPORATE UPDATES TO THE MAINTENANCE

MANUAL REVISIONS AS

REQUIRED WITH EACH B001 SOFTWARE DELIVERY

C003

DI-IPSC- 81442A

Software Version Description (SVD)

OneSAF and Bifrost/MSSV Version Description Document SHALL BE DUE WITH EACH B001 SOFTWARE DELIVERY AND SHALL INCLUDE UPDATES TO THE VERSION DESCRIPTION DOCUMENT. REVISIONS AS REQUIRED WITH EACH B001

SOFTWARE DELIVERY.

C004

OneSAF and Bifrost/MSSV User Training Manual SHALL BE DUE 30 DAYS AFTER B001 SOFTWARE DELIVERY AND SHALL INCLUDE UPDATES TO THE TRAINING MATERIALS. REVISIONS AS REQUIRED, 30 DAYS AFTER EACH B001 SOFTWARE DELIVERY. TRAINING MATERIALS FOR TRAINING SESSIONS SHALL BE DELIVERED 15 DAYS PRIOR TO

CONDUCT OF THE TRAINING.

C005

OneSAF and Bifrost/MSSV Developer Training Manual SHALL BE DUE 30 DAYS AFTER B001 SOFTWARE DELIVERY AND SHALL INCLUDE UPDATES TO THE TRAINING MATERIALS REVISIONS AS REQUIRED, 30 DAYS AFTER EACH B001 SOFTWARE DELIVERY. TRAINING MATERIALS FOR TRAINING SESSIONS SHALL BE DELIVERED 15 DAYS PRIOR TO

CONDUCT OF THE TRAINING.

Table 1. Contract Data Requirements List (CDRL) Table

The Government’s potentially essential deliverables are reflected in the table. The Government reserves the ability to change the deliverables, per the unique requirements established for each TO.

3. REQUIREMENTS

The requirements defined herein shall form the basis for all work that shall be performed as part of thisTO and all subsequent TOs the Government shall issue under the OneSAF Production & Support Single Award ID/IQ contract for the design, development, integration, testing, customer support, and sustainment of the OneSAF Product Line.

3.1. Program Management

The Contractor shall provide the overall management and administrative effort necessary to ensure that the requirements in this PWS are accomplished. The OneSAF Production and Support effort shall be performed in the Contractor provided facility. The program management associated with this effort shall include technical and administrative planning, organization, coordination, resource allocation, development environment management/maintenance, and risk management. The Contractor shall plan, implement, and maintain a Life Cycle Cost (LCC) management process to minimize the cost of support. The Contractor shall use LCC to evaluate design and support alternatives and select the resource support requirements. The Contractor shall track program progress utilizing metrics and share the metrics and related data with the Government. The Contractor shall conduct Technical Interchange Meetings (TIMs), create an Integrated Master Schedule (IMS) to include but not limited to Program Management Reviews (PMRs), In Progress Reviews (IPRs), and others as directed by the Government. The Contractor shall post agendas and meeting minutes to the established web portals.

(DI-MGMT-80227) Contractor Progress, Status and Management Report

3.1.1. Contract Management

The Contractor shall plan, budget, schedule, and control resources allocated to meet requirements of the contract. The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The Contractor shall prepare, implement, and utilize the Contract Work Breakdown Structure (CWBS) and performance-based Government PWS to define the work required for the proposed effort. The Contractor shall identify elements of subcontracted work in the extended CWBS and may propose changes to the CWBS to enhance its effectiveness in satisfying program objectives.

(DI-MGMT-81334C) Contract Work Breakdown Structure (CWBS)

3.1.2. Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

The Contractor shall report all Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for PEO STRI (W6ECAA) via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://sam.gov/. Reporting inputs shall be for the labor executed during the Period of Performance (PoP) during each Government fiscal year, which runs October 1 through September 30. While inputs may be reported any time during the fiscal year, all data shall be reported no later than October 31 of each calendar year, beginning with year of award. Contractors may direct questions to the help desk at “http://sam.gov/”.

3.1.3. Subcontractor Management

The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime Contractor shall manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. The Contractor shall integrate subcontractors into program Integrated Product Teams (IPTs) and program management and tracking systems.

3.1.4. Financial Management

The Contractor shall maintain a detailed cost and schedule status of work progress on the contract and procedures for planning work, controlling costs, measuring performance, and generating timely and reliable information. The Contractor shall document and track the expenditure of all appropriated funds associated with the contract against each contract line item and sub-line item. The Contractor shall maintain integrated cost and schedule information on those subcontracts that, based on risk, schedule criticality, or dollar value, have the potential to impede the successful completion of the contract.

3.1.5. Risk Management

The Contractor shall prepare, implement, and maintain a risk management process that addresses the identification, analysis, mitigation planning, mitigation plan implementation, and tracking he uncertainty in the project’s ability to meet cost, schedule and performance objectives. The Contractor shall provide Government insight into the Contractor’s tools, assessment, mitigation, and control techniques. The Contractor shall document risk management as part of the Contractor Progress, Status, and Management Report.

3.1.6. Organizational Process Management

The Contractor shall manage the overarching OneSAF processes and procedures established in the EPG. The Contractor shall recommend changes and improvements where appropriate, aimed at increasing the effectiveness and efficiency in the execution of those processes while maintaining the integrity of the product line. The Contractor shall provide process reports covering topics such as Project Planning, Requirements Management, Requirements Development, Technology Solutions, and Verification. Initial process report topics shall be finalized at the Post Award Conference (PAC) by the Government and Contractor. Topics shall be revised as required throughout the contract PoP.

(DI-MISC-80711A) Scientific and Technical Report (Process Reports)

3.1.7. Government Furnished Property (GFP) Management

The Contractor shall maintain accountability of all major end-items provided by the Government Furnished Property (GFP) or purchased for use under this contract (Contractor-Acquired Property). The Contractor shall maintain and update a property spreadsheet as needed with newly purchased items and remove items that have been properly returned to Government accountability. Inventories shall be conducted by the Contractor and the Government at the beginning of the contract period, once annually thereafter, and once at the conclusion of the contract unless the most recent inventory has been completed within 45 days of the end of the contracted period of performance. The Contractor shall submit the results of the inventory through contracts in accordance with (IAW) Property Accountability Policies ( AR 710-4). The Contractor's property spreadsheet shall be provided to the Government for use during the inventory no later than five (5) business days before the inventory is scheduled to begin. The GFI is identified on Section 4 – List of Attachments, Attachment 18.

(DI-MGMT-80259) Physical Inventories Report

3.1.8. Purchase of Commercial Information Technology (IT) Equipment

The Contractor shall use the Army's Computer Hardware, Enterprise Software Solutions (CHESS) program, under PEO Enterprise Information Systems (EIS), as the mandatory source for commercial IT purchases. CHESS contracts provide IT products and services that comply with Network Enterprise Technology Command (NETCOM), Army and Department of Defense (DoD) policy and standards.

Purchasers of commercial hardware and software must satisfy their IT requirements by utilizing CHESS contracts and DoD Enterprise Software Initiative agreements first, regardless of dollar value. Any purchase made outside of CHESS contracts requires a waiver. A complete list of CHESS contracts and the on-line waiver process can be found at https://chess.army.mil.

3.1.9. Integrated Product Teams (IPT)

The Contractor shall utilize an IPT environment as defined by the OneSAF processes. IPT activities shall include the OneSAF Contractors, users, Co- Developers and Government Agency representatives. Associate Contractor Agreements (ACA) shall be implemented and utilized with all OneSAF Contractors where required (i.e., STE, JLCCTC, LVC-IA, NGC). The Contractor shall support and provide status during the weekly IPTs. The weekly IPT meeting shall provide an overview and status of all activities and a discussion of technical and/or programmatic topics. The Contractor shall participate in Program Management meetings, Government-led meetings, and third party IPT meetings as directed by the Government. The Contractor shall provide minutes and reports for all meetings to the development environment portal as directed by the Government.

3.1.10. Post Award Conference (PAC)

The Contractor shall schedule and conduct a PAC within 30 days after contract award. The conference shall introduce key participants with emphasis on top level management of the program, identify points of contact and discuss both parties’ understanding of the requirements to be performed, agree on metrics that shall be used as management indicators, identify any partnering approach, and other contract issues. The Contractor shall post the conference materials and minutes to the OneSAF development environment within 5 business days after the PAC.

3.1.11. Personnel Requirements

3.1.11.1. Key Personnel

The Contractor shall provide staff to support the OneSAF requirements. The following personnel employed under this contract be subjected to approval by the Contracting Officer and shall be dedicated at 100% to the program throughout the length of the contract. Key personnel identified in the RFP (Section J, Attachment 9) are required to remain in that role for the first year of the contract. The contractor agrees to assign to any effort requiring non-key personnel only personnel who meet or exceed the applicable labor category descriptions. No substitution or addition of personnel shall be made except in accordance with this instruction.

a. Program Manager

b. Lead Software Engineer

c. Lead Systems Engineer

d. Lead Integration and Test

e. Lead Architect

f. Lead Cybersecurity Specialist/Analyst

3.1.11.2. Cyberspace Workforce Management

IAW DoDD 8140.01 Cyberspace Workforce Management, DoDI 8140.02 IDENTIFICATION, TRACKING, AND REPORTING OF CYBERSPACE WORKFORCE REQUIREMENTS, DoD-M 8140.03 CYBERSPACE WORKFORCE QUALIFICATION AND MANAGEMENT PROGRAM, personnel whose required duties include government information assurance/cybersecurity requirements shall have at least one approved security-related certification.

3.1.11.3. Security Clearances

DoD Secret level Personnel Security Clearances (PSC) are required for all personnel working on the program.

3.1.12 Phase In. The Contractor shall provide a transition phase-in strategy with the Contractor’s proposal that addresses all work efforts identified in this PWS. The Contractor shall hire, train and be able to provide services to meet the requirements of the contract no-later-than sixty (60) calendar days after contract award. The Contractor shall perform phase-in activities in conjunction with the previous Contractor and the Government to include the following:

· Transition planning

· Training of personnel

· Property inventory

· Property accountability

· Property transfer

· Data inventory

· Data accountability

· Data transfer

3.2. OneSAF Processes

The Contractor shall execute and maintain the overarching OneSAF processes and procedures established in the EPG. The Contractor shall recommend changes and improvements where appropriate, aimed at increasing the effectiveness and efficiency in the execution of those processes while maintaining the integrity of the product line to include the use of UnITE.

3.3. Systems Engineering

The Contractor shall establish and maintain an effective systems engineering program throughout the requirements, design, testing, and integration processes in order to deliver the OneSAF capabilities in an efficient, effective and innovative, i.e. agile manner. The Contractor shall provide the management and execution of all engineering elements of the contract. The Contractor shall leverage new and evolving technologies and leverage and reuse existing products to the fullest extent practicable with the goal of reducing overall life cycle costs.

The Contractor shall use an open systems approach as the design strategy to:

(1) Choose commercially supported specifications and standards for selected system interfaces (external, internal, functional and physical), products, practices and tools

(2) Integrate cloud-based technology in support of the Army’s goals including data discovery, enrichment, and reuse. The cloud computing capability shall utilize and leverage commercial technology and commodity, non-proprietary components to the maximum extent possible

(3) Build open system architectures as the primary foundation in developing the proposed system and its elements

(4) Identify the means for ensuring conformance to open systems standards and profiles throughout the development process.

The Contractor shall evolve the OneSAF product line architecture over time to address new requirements and to keep pace with the advancing technical environment. Through the system engineering process, the Contractor shall provide updates to the PLAS and Product Line Requirements Specification (PLRS).

(DI-MISC-80711A) Scientific and Technical Report (OneSAF Product Line Architecture Specification) (DI-MISC-80711A) Scientific and Technical Report (OneSAF Product Line Requirement Specification)

3.3.1. Systems Integration

The Contractor shall develop and implement applicable program-level specifications and design documents for the OneSAF Product Line with consideration for critical software items, data rights and interfaces sufficient to support verification & validation, operations, maintenance, and modifications of OneSAF. The Contractor shall provide updates to the System Integration Plan (SIP), including hardware and software development/integration plans, to achieve an optimal system design, production software item, and documentation package.

(DI-MISC-80711A) Scientific and Technical Report (OneSAF System Integration Plan)

3.3.2. Software Engineering and Development

The Contractor shall establish a robust and comprehensive capability to provide conceptual modeling, knowledge acquisition and engineering; requirements analysis, code design, development, and unit test; and software integration and test phases in support of activities across the entire OneSAF Community. For all software development activities, the Contractor shall follow industry-accepted software development best practices that apply Level 3 or greater Capability Maturity Model Integration for Development (CMMI-DEV) equivalent processes and methodologies. Additionally, the contractor shall align to modern software- intensive practices like agile development, DevSecOps, and continuous integration/continuous delivery/deployment (CI/CD), per Army SW Modernization Directives. The Contractor shall develop the system software to meet the incremental baseline requirements for new functionality. The Contractor shall ensure the software design is based upon a common infrastructure and common infrastructure services; that interoperability and security are built-in; and that information made available is trusted and interoperable. The Contractor shall analyze requirements concerning computer resource utilization and allocate computer resources among the software items, continuously monitor the utilization and reallocate or identify the need for additional resources. The Contractor shall conduct testing that demonstrates that the new capabilities, change sets, PTR/DR fixes, and handover packages integrated meet the requirements and their respective Use Cases as provided by the Government.

3.3.3.1. Software Processes

The Contractor shall use an innovative process, i.e. agile software development methodology, where each capability is developed during a series of sprints. The Contractor can propose tailoring as required with Government approval. The build typically consists of the Knowledge Acquisition/Knowledge Engineering (KA/KE) phase followed by subsequent sprints that consist of the Requirement Analysis (RA), Design, Code and Unit Test (CUT), and Software Integration and Test (SWIT) phases. The Contractor shall perform software capability evaluations and stakeholder peer reviews at appropriate phases of the OneSAF development process to ensure that designs are supportable, testable, and conform to the OneSAF architectural specifications.

3.3.3.2. Software Integration

The Contractor shall continuously support the acceptance, modification, integration, and test of internally developed and Co-Developer capabilities daily, in order to deliver the OneSAF software, data, and documentation products. The Contractor shall support complete integration through automation and automated tests and regression testing of the product baseline utilizing supported software configurations and in supported interoperability configurations. The Contractor’s integration and testing processes shall ensure that new capabilities, handover packages, change sets, and PTR/DR fixes are fully implemented and satisfy their requirements and respective Use Cases without impacting existing capability prior to integration into the main OneSAF Software Product Line.

3.3.3. Quality Assurance (QA)

The Contractor shall implement and maintain a QA program using industry- accepted best practices and subject to Government program approval. The Contractor shall establish the QA process with full Government insight. The Contractor shall maintain records of quality conformance and shall make these records available for Government review upon request.

The Contractor shall maintain a structured quality control process on the project that ensures the prompt detection of deficiencies and initiation of necessary corrective actions for any software artifacts or deliverables found non-compliant with this PWS or the Contractor’s internal practices. The Contractor shall introduce appropriate quality controls and establish measurement points that shall provide maximum visibility into new and prior processes to assure contractual requirements are being met. The Contractor shall select the proper methods to analyze these processes to continuously improve the system. Metrics shall be developed to assist management visibility into an adequate process control system. The Contractor shall utilize a discrepancy tracking system with the ability to produce complete permanent records of all discrepancies. The Contractor shall establish a suspense system to ensure timeliness of analysis and corrective action for discrepancies and risk reduction items. The Contractor shall make all data exportable in a readable/manipulatable acceptable format for Government use.

The Government shall monitor the Contractor’s performance under this contract in accordance with the Government’s Quality Assurance Surveillance Plan (QASP).

3.3.4. Configuration Management (CM) and Control

The Contractor shall identify and manage the software product baseline configuration items and adopt and expand the established OneSAF CM process to ensure that the OneSAF product conforms to the product requirements and is identified and documented in sufficient detail to support its life cycle. The Contractor shall follow the established OneSAF processes, contained in the EPG, to maintain system requirements, system configuration information, and all relevant information about the system. The CM process shall address the evolving production configuration and support environments (engineering, implementation, and test) used to generate and test the product line. The Contractor shall exercise the CM control on all configuration baselines. The Contractor shall establish and maintain a program-level Configuration Control Board (CCB) and submit Contractor Change Proposals (CCP) or Engineering Change Proposals (ECP) for any recommended change, deviation, or waiver In Accordance With (IAW) the established CM process for Government concurrence. The Contractor shall maintain the current CM processes, evaluating them and recommending improvements. The Contractor shall document, and the Government shall review all changes to established baselines. The Contractor shall maintain and manage system requirements in a Government approved industry standard application that provides import/export of data in a commercia standard format.

(DI-CMAN-80639C) Engineering Change Proposal

3.4. OneSAF Software Product Line Management and Support

The Contractor shall maintain and enhance the established OneSAF software product line within the OneSAF development environment. The Contractor shall develop, enhance, maintain, and integrate capabilities (developed internally or from external users/customers) and provide version release delivery acceptable to the Community. The Contractor shall maintain, support, develop, and enhance the tools, models, behaviors, compositions, and/or services of the OneSAF Product Line that meet the various System Compositions extracted from the product line for a particular use. The Contractor shall maintain CM over all daily builds as well as all delivered baselines.

The Contractor shall continuously execute the handover acceptance, modification, integration, and test of developed products to include those from Co-Developers across the Modeling and Simulation Communities, in order to deliver the OneSAF software, data, and documentation products. The contractor shall document significant events related to development and/or testing activities.

(DI-MISC-80711A) Technical Report

3.5. Test Program

The Contractor shall develop, implement, manage, and maintain an innovative integrated test program that includes plans and test procedures designed to verify the OneSAF product line (including the various configurations) meets all requirements as well as verify fixes related to integration, issue resolution, new development, or enhanced capability including mission command stimulation. The Contractor shall implement methodologies to automate tests using a well-designed framework to increase both the speed and accuracy of testing by providing a reliable structure that reduces dependence on subject matter experts while offering early baseline health indicators and informative report summaries. The Contractor shall collect metrics indicative of testing trends, performance, and baseline stability throughout and report the result to the Government during the weekly IPT meetings.

3.6. Maintenance and Problem Ticket Report (PTR) Support

The Contractor shall perform recurring PTR resolution in conjunction with a prioritized list as established by the Government PTR review board in order to maintain the quality of the software product baseline.

3.7. Co-Developer Support

The Contractor shall host and participate in Co-Developer interaction and handover meetings with OneSAF users. The Contractor shall work with other Army Contractor partners and users of the OneSAF product line to identify and develop reusable software components that support cross-developer interactions, and service-specific uses of OneSAF. The Contractor shall monitor OneSAF system capabilities that are developed by Co-Developers, and keep the Government informed on the progress of such efforts. The Contractor shall provide the conceptual modeling, architectural, and engineering support required to support the Co-Developer’s OneSAF software product deliveries. The Contractor shall analyze proposed handovers for impact on the OneSAF product line baseline configuration and provide recommendations for inclusion. With Government concurrence, the Contractor shall accept, modify, integrate, and test handover packages, new capabilities, change sets, and PTR/Discrepancy Report (DR) fixes from Co-Developers following established processes. This software shall become part of the formally managed software baseline.

3.8. Cloud Enabled

In support of the Army’s M&S Communities, the Contractor shall execute the systems engineering process and perform requirement analysis, conceptual modeling, engineering design, development, production, test, and integration to incrementally permit OneSAF to be cloud enabled, Common Operating Environment (COE) compliant and optimized for all identified use cases. This capability could provide services for user locations as well as test and development environments and look to reduce OneSAF recurring sustainment cost over time. The Contractor shall ensure that any cloud services are implemented in accordance with Defense Information Systems Agency (DISA) provided Cloud Computing Security Requirements Guidance and IAW established Army objectives, memorandums and directives as outlined in the Army Cloud Plan. The contractor shall migrate OneSAF virtual machines and containers, conduct DevSecOps, and optimize OneSAF deployment in a Government approved or designated cloud by the Army. The contractor shall ensure this aligns to MOSA, microservices-based architecture, digital engineering, and data-centric princples that support tailoring for cloud-enabled technologies.

3.9 OneSAF Software Product Baseline Release

The Contractor shall facilitate the final user acceptance testing to demonstrate that all changes made to the OneSAF Software Product Line Baseline meet the applicable requirements and their respective Use Cases without impacting existing capability. The Contractor shall prepare and deliver one annual version release. The Contractor shall maintain and update OneSAF version deliverable support documentation for each release.

The Contractor shall coordinate with the Government to identify and prioritize test areas, test threads, test scenarios, vignettes; and any other special test needed to evaluate the functionality and stability of the OneSAF software release baseline. The Contractor shall participate in planning conferences with the TPO and M&S Communities to finalize the Release Test Plan. In preparation to the final acceptance, the Contractor shall dry-run all identified threads, vignettes, large scale exercises, and bi-directional interoperability with live Mission Command (MC) devices with user involvement. The Contractor shall collect metrics throughout the dry-runs and report the results back to the Government during the weekly IPT meeting. The Contractor shall ensure that the OneSAF software baseline under test meets the requirements as identified in ORD, PLRS, and P3I lists as well as any specific additional requirements identified in the Release Test Plan prior to the final acceptance test. The Contractor shall capture all data required to measure the capability and stability of the OneSAF baseline and shall support the Government during the final acceptance test. When appropriate, the Contractor shall ensure the developed capability is adequately tested to meet the appropriate live, virtual, constructive, and gaming simulation requirements. The Contractor shall identify and provide all the test requirements needed, including test plans and resources, to assess the newly developed functionality and its impact on the stability of the software product line baseline. The final acceptance test shall be performed by the Government in an operationally relevant environment prior to all annual software product line baseline releases.

The Contractor shall facilitate the final user acceptance testing to demonstrate that all changes made to the OneSAF Software Product Line Baseline meet the applicable requirements and their respective Use Cases without impacting existing capability.

The Contractor shall prepare and deliver one annual version release. The Contractor shall maintain and update OneSAF version deliverable support documentation for each release.

3.10. Tailored OneSAF Software Product Baseline Release

The Contractor shall coordinate with the Government to identify and prioritize test areas, test threads, test scenarios, vignettes; and any other special test needed to evaluate the functionality and stability of the OneSAF software release baseline. The Contractor shall participate in planning conferences with the TPO and M&S Communities to finalize the Release Test Plan. In preparation for the final acceptance, the Contractor shall dry-run all identified threads, vignettes, large scale exercises, and bi-directional interoperability with live Mission Command (MC) devices with user involvement. The Contractor shall collect metrics throughout the dry-runs and report the results back to the Government during the weekly IPT meeting. The Contractor shall ensure that the OneSAF software baseline under test meets the requirements as identified in Operational Requirements Document (ORD), PLRS, and P3I lists as well as any specific additional requirements identified in the Release Test Plan prior to the final acceptance test. The Contractor shall capture all data required to measure the capability and stability of the OneSAF baseline and shall support the Government during the final acceptance test. When appropriate, the Contractor shall ensure the developed capability is adequately tested to meet the appropriate live, virtual, constructive, and gaming simulation requirements. The Contractor shall identify and provide all the test requirements needed, including test plans and resources, to assess the newly developed functionality and its impact on the stability of the software product line baseline. The final acceptance test shall be performed by the Government in an operationally relevant environment prior to all annual software product line baseline releases.

(DI-AVCS-80700) Computer Software Product End Item (OneSAF Software Product Version Release) (DI-MISC-80711A) Scientific and Technical Report (OneSAF Operator Manual) (DI-MISC-80711A) Scientific and Technical Report (OneSAF Maintenance Manual) (DI-IPSC-81442A) Software Version Description Document (VDD) (OneSAF VDD) (DI-IPSC-80603A) Software Test Plan (Product Release Test Plan) (DI-AVCS-80700) Computer Software Product End Item (OneSAF Software Product Version Release) (DI-MISC-80711A) Scientific and Technical Report (OneSAF Operator Manual) (DI-MISC-80711A) Scientific and Technical Report (OneSAF Maintenance Manual) (DI-IPSC-81442A) Software Version Description Document (VDD) (OneSAF VDD) (DI-IPSC-80603A) Software Test Plan (Product Release Test Plan)

3.11 Capability Development

The Contractor shall perform capability development and enhancements/improvements of the OneSAF Software Product Line in order to sustain and evolve current and future M&S Community requirements. Requirements for capability development shall also be derived from the needs of Army PEOs/PMs, other PEO STRI programs, other Government Agencies, Foreign Military Sales, State and local Government agencies, or similar entities. The Contractor shall analyze proposed capabilities for impact to the OneSAF product baseline configuration and work within the IPT to provide recommendation for architectural enhancements, implementation, and integration in order to deliver the product line software that meets the requirements.

3.11.1. Concurrency Capability Development

3.11.1.1. Mission Command Adapter (MCA)

The OneSAF MCA communicates in a bidirectional manner with real world MC systems using the appropriate tactical message traffic. The Contractor shall maintain and develop software capabilities to stimulate the latest Common Operating Environment (COE) software updates for mission command stimulation as directed by the Government for each software product baseline annual release. Be in a supportive role in the development of MCA to connect to Army Tactical devices in the Army designated Cloud (i.e. LT2 IDE).

3.11.1.2. Standard File Format (SFF)

The Contractor shall incorporate the current version of the CCDC-DAC SFF as directed by the Government for each software product baseline annual release.

3.11.1.3. Environmental Runtime Component (ERC)

The Contractor shall incorporate ERC improvements as directed by the Government for each software product baseline annual release.

3.11.1.4. Military Organization and Equipment Representation Currency

The Contractor shall incorporate updates to the modeling and representation of military…