RFP 2 SOLICITATION.pdf

PDF 59 KB Posted

Attached to
RECOVERY: Construction Services to Renovate Tenth and Eleventh Floors of the ONeil Federal Building
Solicitation number
Not on record
Issued by

About this file

RFP Solicitation

View the file

Other files

File Type Posted
Amendment 0002 A400-4 - ENLARGED PLANS ELEVATIONS PHASE D.pdf PDF
Amendment 0002 SF30.pdf PDF
Amendment 0002 A400-1 - ENLARGED PLANS ELEVATIONS PHASE A.pdf PDF
Amendment 0002 A600-1 - DOOR SCHEDULE PHASE A.pdf PDF
Amendment 0001 GS01P10BZC0022.pdf PDF
pre-proposaslattendees.pdf PDF
PreProposalConference.pdf PDF
FINAL WORKING DOC 041910 - DO NOT DELETE.pdf PDF
Phase III Complete Spec.pdf PDF
ONeill SF1442.pdf PDF
Wage Determination MA100001 4.16.2010.pdf PDF
RFP 2 AGREEMENT.pdf PDF
REPSANDCERTS1.doc DOC document
Pre Bid.doc DOC document
Short List Revised.doc DOC document
Short List.doc DOC document
ONeil RFP I Amendment 0001.doc DOC document
O'Neill Phase I RFP Final 030410.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C201 04.05.10 Page 1 of 17

Construction Contract for 10th and 11th Floor Renovations, Thomas P O’Neill Federal Building, Boston, MA GSA Solicitation No. GS-01P-10-BZ-C-0022

C201 04/10

552.219-71 Notice to Offerors of Subcontracting Plan Requirements. (JUN 05)

The General Services Administration (GSA) is committed to assuring that maximum practicable opportunity is provided to small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns to participate in the performance of this contract consistent with its efficient performance. GSA expects any subcontracting plan submitted pursuant to FAR 52.219-9, Small Business Subcontracting Plan, to reflect this commitment. Consequently, an offeror, other than a small business concern, before being awarded a contract exceeding $500,000 ($1,000,000 for construction), must demonstrate that its subcontracting plan represents a creative and innovative program for involving small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns as subcontractors in the performance of this contract.

Table of Contents

I. General Information

A. The Solicitation and the Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit - Construction H. Receipt of Offers

II. Proposals

A. Contents of Proposal B. Price Proposal C. Technical Proposal D. Other Information to be Submitted with Proposal E. Requirements for Joint Venture Offerors

III. Solicitation Provisions

A. General Provisions B. FAR/GSAR Solicitation Provisions

GSA Solicitation No. GS-01P-10-BZ-C-0022

C201 04.05.10 Page 2 of 17

IV. Buy American and Additional Solicitation Provisions

A. Buy American Act B. Buy American Exceptions C. American Recovery and Reinvestment Act of 2009 D. Additional Provisions

V. Method of Award

A. Evaluation of Offers B. Determination of Responsibility C. Price Realism D. Price Reasonableness E. Unbalanced Prices F. Total Evaluated Price G. Non-Price Factors H. Evaluation of Joint Venture Offerors

C201 04.05.10 Page 3 of 17

I. General Information

I.A. The Solicitation and Contract

I.A.1. This Solicitation is set-aside for Small Disabled Veteran Owned Small Businesses in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

I.A.2. The Solicitation shall not be part of the Contract. An Offeror’s proposal shall not be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

I.A.3. The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer. No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B. List of Solicitation Documents

The Solicitation Documents are comprised of:

I.B.1. The Solicitation

I.B.2. Offeror Representations and Certifications Form (C301)

I.B.3. Other Forms Required For Submission with Proposals

I.B.4. Standard Form (SF) 1442 – Solicitation Offer and Award

I.B.5. The Agreement and all Attachments to the Agreement

I.B.6. [Specifications and Drawings

I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

I.C.1. Contracting Officer

Name: Deborah Fournier Address: Thomas P O’Neill Federal Building, 10 Causeway Street 11th Floor, Boston MA

Telephone: 617-565-5970 Email: Deborah.fournier@gsa.gov

I.C.2. Alternate Point of Contact

Name: Kim Yates Address: Thomas P O’Neill Federal Building, 10 Causeway Street 11th Floor, Boston MA

C201 04.05.10 Page 4 of 17

Telephone: 617-565-6013 Email: Kimberly.yates@gsa.gov

I.D. Pre-Proposal Conference

I.D.1. A pre-proposal conference regarding this Solicitation is scheduled as follows:

Date: April 27, 2010 Time: 10:00 – 12:00

Location: Thomas P O’Neill Federal Building, Boston MA Room 174C

I.D.2. Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer.

I.E. Estimated Price Range

The estimated price range for the Project is between $ 5,000,000 and $ 10,000,000 .

I.F. FAR 52.228-1. Bid Guarantee (SEP 96)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. FAR 52.236-27. Site Visit - Construction (FEB 95)

C201 04.05.10 Page 5 of 17

I.G.1. The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation and are in the attached Agreement. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

I.G.2. Site visit(s) will be held at the following date(s) and time(s):

Date: April 27, 2010 Time: 8:00 – 10:00

For further information, please contact:

Name: Kim Yates Address: Thomas P O’Neill Federal Building, 10 Causeway Street, 11th Floor Boston MA

02222 Telephone: 617-565-6013

Email: Kimberly.yates@gsa.gov

I.H. Receipt of Offers

1. In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 2:00 pm on the following date and at the following address:

Date: May 19, 2010 Address: Thomas P O’Neill Federal Building ATTN: Kim Yates 10 Causeway Street 11th

Floor Boston MA 02222

2. Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.

3. Offers sent by United States Mail shall be deemed timely if delivered to the address of the government installation designated for receipt of offers on or before the date established for receipt of offers.

II. Proposals

II.A. Proposal Contents

Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

II.A.1. Price Proposal

II.A.2. Technical Proposal

II.A.3. Representations and Certifications (C301)

II.A.4. Bid Guarantee, using Standard Form 24

C201 04.05.10 Page 6 of 17

II.A.5. GSA Form 527 – Contractor’s Qualification and Financial Information

II.A.7. Please note the II.A.2, Technical Proposal, was received during the RFP 1 Stage

II.B. Price Proposal

II.B.1. Contents

The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror.

II.B.2. Qualifications, Exclusions and Conditions

If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

II.B.3. Prompt Payment Discount

Indicate in Block 13 of the SF 1442 any offered prompt payment discount. Offerors are cautioned against indicating terms requiring payment of proposed prices sooner than the time required in the Contract, as such terms shall be deemed exceptions to the requirements of the Contract.

II.C. Technical Proposal

The Technical Proposal shall include the information requested below for the non-price factors described in Section V.G.

The Technical proposal was submitted in Phase 1

II.D. Other Information to be Submitted with Proposal

II.D.1. Representations and Certifications

Offerors submitting a proposal in response to this Solicitation shall complete electronic annual representations and certifications at http://orca.bpn.gov in conjunction with required registration in the Central Contractor Registration (CCR) database. Offerors shall also submit with their proposal the Annual Representations and Certifications (FAR 52.204-8) using file C301 attached to this Solicitation.

II.D.2. Qualifications of Offerors

Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract. Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information.

Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.

C201 04.05.10 Page 7 of 17

II.E. Requirements for Joint Venture Offerors

II.E.1. All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.

II.E.2. An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer.

II.E.3. In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.

II.E.4. Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.

III. Solicitation Provisions

III.A. General Provisions

III.A.1. Availability of Funds

ARRA funds will be used.

III.A.2. Requests for Clarification or Interpretation

The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but will not warrant that all such requests will be answered. Prospective Offerors should make such requests not less than 15 calendar days prior to the date set for receipt of offers.

III.A.3. Notice to Small Business Firms

A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (www.sba.gov). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.

III.A.4. Information Concerning the Disclosure of Solicitation Results

This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will made available until after award except as provided by

FAR 15.503.

III.A.5. Affirmative Procurement Program

C201 04.05.10 Page 8 of 17

GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement. Refer to clauses FAR 52.204-4 requiring double sided printing on recycled paper for all reports and FAR 52.223-10 encouraging vendors to practice waste reduction.

III.A.6. Notice Concerning Preparation of Proposals

Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.

III.A.7. Vendor Past Performance System

During contract performance, GSA may use the Vendor Past Performance system (VPP) in evaluating Past Performance. VPP is a system that collects, maintains, and disseminates contractor performance information as required by Federal Acquisition Regulation, Subpart 42.15, to be sent to the Government's Past Performance Information Retrieval System (PPIRS).

The contractor will be required to use VPP when responding to Performance Evaluations.

III.A.8. Safeguarding Documents Designated as Sensitive But Unclassified

Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information set forth in Section III.A. of the Agreement (Administrative Matters) as a condition of receipt of such information.

III.B. FAR/GSAR Solicitation Provisions

III.B.1. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition. (JAN 04)

(a) Definitions. As used in this provision— “Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.

“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

C201 04.05.10 Page 9 of 17

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals.

(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and

(ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show—

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, revision, and withdrawal of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition;

and—

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other

C201 04.05.10 Page 10 of 17 documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—

(1) Mark the title page with the following legend:

This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend:

Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.

C201 04.05.10 Page 11 of 17

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government’s interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government. (f)(4) The Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Therefore, the offeror's initial proposal should contain the offeror's best terms from a price and technical standpoint.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

C201 04.05.10 Page 12 of 17

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

III.B.2. FAR 52.211-1. Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29. (AUG 98)

(a) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to—

GSA Federal Supply Service Specifications Section, Suite 8100 470 East L’Enfant Plaza, SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978

(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.

III.B.3. FAR 52.211-3. Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (JUN 1988)

(Applicable to solicitations that cite specifications not listed in the Index and are not furnished with the solicitation)

(a) The specifications cited in this solicitation may be obtained from: GSA Specifications Unit at (202) 755-0325. MIL Specifications may be obtained by calling (215) 697-2179.

(b) The request should identify the solicitation number and the specification required by date, title, and number as cited in the solicitation.

III.B.4. FAR 52.216-1. Type of Contract. (APR 84)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

III.B.5. FAR 52.222-5. Davis-Bacon Act—Secondary Site of the Work. (JUL 05)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

C201 04.05.10 Page 13 of 17

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

III.B.6. FAR 52.222-23. Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

(Applicable to solicitations resulting in construction contracts in excess of $10,000.)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation for Each Trade

Goals for Female Participation for Each Trade

4 %.

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4.

Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

C201 04.05.10 Page 14 of 17

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is:

Contract is to be performed in Boston MA, USA III.B.7. FAR 52.233-2. Service of Protest (SEP 06)

(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer at the address provided in Paragraph I.D.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

III.B.8. FAR 52.252-1. Solicitation Provisions Incorporated by Reference (FEB 98)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:

http://www.acquisition.gov/comp/far/index.html

NUMBER TITLE DATE

52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions

SEP 07

52.204-5 Women-Owned Business (Other Than Small Business) MAY 99

52.214-34 Submission of Offers in the English Language APR 91

52.215-16 Facilities Capital Cost of Money JUN 03

52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns

JUL 05

52.222-38 Compliance with Veterans’ Employment Reporting Requirements DEC 01

52.223-1 Biobased Product Certification DEC 07

52.223-4 Recovered Material Certification MAY 08

C201 04.05.10 Page 15 of 17

NUMBER TITLE DATE

52.225-13 Restrictions on Certain Foreign Purchases JUN 08

52.236-28 Preparation of Proposals—Construction OCT 97

IV. Buy American and Additional Solicitation Provisions

IV.A. Buy American

52.225-21 Required Use of American Iron, Steel, and Manufactured Goods-Buy American Act— Construction Materials (Mar 2009).

52.2225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods— Buy American Act—Construction Materials (Mar 2009).

IV.B. Buy American Exceptions

For the purpose of determining Buy American requirements set forth in the Buy American Provision of this Solicitation, the following construction materials and components are excepted:

None

IV.C. American Recovery and Reinvestment Act of 2009

IV.C.1. This Contract is funded in whole by the American Recovery and Reinvestment Act of

2009 (ARRA).

IV.C.2. The extent of ARRA coverage is set forth in Paragraph I.F. of the Agreement.

IV.D. Additional Solicitation Provisions

52.219-6 Notice of Total Small Business Set-Aside (Jun 2003) 52.219-8 Utilization of Small Business Concerns (May 2004) 52.219-14 Limitations on Subcontracting (Dec 1996) 52.219-27 Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004)

V. Method of Award

C201 04.05.10 Page 16 of 17

V.A. Evaluation of Offers

The Government will award a contract resulting from this Solicitation to the responsible Offeror whose offer conforming to the Solicitation will be the best value to the Government, Total Evaluated Price and other factors considered. In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers:

Award will be made based on a combination of previously submitted technical factors and price.

Non-Price Factors, when combined, are approximately equal in importance to Total Evaluated Price.

V.B. Determination of Responsibility

In order to be considered responsible, an Offeror must demonstrate that it meets the requirements of FAR 9.104-1. The Contracting Officer's determination of an Offeror's responsibility or non-responsibility may be based upon any information obtained by the Contracting Officer, and is independent of the evaluation of offers set forth herein.

V.C. Price Reasonableness

All offers must include reasonable prices. The Contracting Officer may reject all offers containing prices determined to be unreasonably high or low.

V.D. Unbalanced Prices

All offers must include balanced prices. If this Solicitation requires unit prices, option prices, or bid rates, the Contracting Officer may reject any proposal determined to be unbalanced with respect to such prices or rates. A proposal may be deemed unbalanced if the Base Contract Price, unit prices, option prices or bid rates vary so markedly from either the Government estimate or the range of such prices contained in competing offers as to materially reduce the effectiveness of the Total Evaluated Price formula in determining the potential cost of an offer in comparison to other, balanced, offers.

V.E. Total Evaluated Price

Total Evaluated Price shall be calculated using the prices indicated in the Price Proposal, using the following formula:

[Insert pricing formula, based upon CLIN numbers assigned in Agreement Pricing Form.]

V.F. Non-Price Factors

Submitted During Phase I

V.G. Evaluation of Joint Venture Offerors

C201 04.05.10 Page 17 of 17

In the evaluation of responsibility and non-price factors, information submitted for a party to the joint venture will not be evaluated to the extent that the terms of the joint venture agreement limit such party's performance or financial obligations as a party to the Contract contemplated by this Solicitation.

File details come from the government source that posted it. Updated .