Amendment 0002 SF30.pdf
PDF 20 KB Posted
- Attached to
- RECOVERY: Construction Services to Renovate Tenth and Eleventh Floors of the ONeil Federal Building
- Solicitation number
- Not on record
About this file
Amendment 0002 SF30
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 A400-4 - ENLARGED PLANS ELEVATIONS PHASE D.pdf | ||
| Amendment 0002 A400-1 - ENLARGED PLANS ELEVATIONS PHASE A.pdf | ||
| Amendment 0002 A600-1 - DOOR SCHEDULE PHASE A.pdf | ||
| Amendment 0001 GS01P10BZC0022.pdf | ||
| pre-proposaslattendees.pdf | ||
| PreProposalConference.pdf | ||
| FINAL WORKING DOC 041910 - DO NOT DELETE.pdf | ||
| Phase III Complete Spec.pdf | ||
| ONeill SF1442.pdf | ||
| Wage Determination MA100001 4.16.2010.pdf | ||
| RFP 2 AGREEMENT.pdf | ||
| REPSANDCERTS1.doc | DOC document | |
| RFP 2 SOLICITATION.pdf | ||
| Pre Bid.doc | DOC document | |
| Short List Revised.doc | DOC document | |
| Short List.doc | DOC document | |
| ONeil RFP I Amendment 0001.doc | DOC document | |
| O'Neill Phase I RFP Final 030410.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
Deborah Fournier Contracting Officer
15B. Contractor/Offeror 15C. Date Signed 16C. Date Signed
(Signature of person authorized to sign)
16B. United States of America
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
1. Contract ID Code Page of Pages
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1 2
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
0002 05/18/2010 VMA00117
6. Issued By Code 1PC 7. Administered By (If other than Item 6) Code 1PC
GSA/PBS Property Dev. Div. GSA/PBS Property Dev. Div.
T.P. O'Neill Federal Bldg T.P. O'Neill FOB
10 Causeway Street 11 th
Floor 10 Causeway Street 11 th
Floor
Boston, MA 02222-1077 Boston, MA. 02222-1077
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
GS-01P-10-BZ-C-0022
X 9B. Date (See Item 11)
04/21/2010 10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation No. GS-01P-10-BZ-C-0022 for 10th and 11th Floor Renovations, Thomas P O’Neill Federal Building, in Boston MA is hereby amended as follows:
1. Refer to Drawing No. T431.3 and T440.4; Keyed Note 12 and Detail A:
a. Basis of design for the video-conferencing system is changed that manufactured by Polycom to Tandberg for compatibility with existing GSA Tandberg Enterprise VCT system.
b. Keyed Note 12: Delete “POLYCOM VIDEO-CONFERENCING SYSTEM: HDX-7002-XL (CODEC, MIC
ARRAY, CAMERA, CABLES-VERIRY LENGTHS, PEOPLE+CONTENT FEATURE, SECOND MONITOR);
APPROVED EQUAL BY TANDBERG EDGE-95 SERIES.” and add, in replacement thereof, “VIDEO-
CONFERENCING SYSTEM: TANDBERG C40 CODEC, AUDIO-SCIENCE MICROPHONE, AND
PRECISION HD 1080p CAMERA; PROVIDE ALL REQUIRED SIGNAL, CONTROL, AND POWER
CABLING; PROGRAM FULL FUNCTIONALITY WITH AV CONTROL SYSTEM AND TOUCHSCREENS.”
c. Modify Detail A to reflect Tandberg VCT codec and peripheral devices in lieu of that shown/specified.
2. Refer to Drawing No. T410.1, T420.2, T430.3, T431.3, T440.4, T441.4, and T442.4; General Notes:
a. Add to the GENERAL NOTES, the following NOTE 4. or NOTE 5., respectively: “PROVIDE A COMPLETE
AND FULLY FUNCTIONAL AUDIO-VISUAL SYSTEM INCLUDING, BUT NOT LIMITED TO, ALL
EQUIPMENT (UNLESS OTHERWISE NOTED), CABLING, POWER SUPPLIES, AND PROGRAMMING;
PROGRAMMING SHALL BE CUSTOM AND COORDINATED WITH ENGINEER/OWNER PRIOR TO
COMMENCING WORK, SHALL PROVIDE GATEWAY TO ALL CONFIGURED FEATURES OF ALL AV
SYSTEM ENTITIES.”
3. Clarification: Drawing M102.2 – The relief air and outside air louvers are to remain as- is. No work is required on the louvers. All other requirements and keyed notes remain unchanged.
4. Refer to Details 2 and 4 on Drawing No. A501:
Countertop support RAKKS brackets are to be shopped primed and field painted to match the adjacent wall finish.
5. Drawing A600 Series, clarification regarding door hardware per building standards:
Door hardware provided by Contractor, Hardware building standard is Corbin-Russwin (handles cores and closers), Key way 59 A-1 or 59A-2 6 pin Style type “NEWPORT” stainless steel, GC to confirm style type with building manager.
6. Refer to partition type B1 Drawing A001:
In reference to the term “5/8” GWB” the words “TYPE X” shall be added to reference a 1 hour partition assembly.
7. Clarification of 10th & 11th Floor Fan Coil Units:
Provide a 4-row cooling/heating coil unit that meets the specified schedule performance.
8. Refer to Drawing A400.1 and A600 for typical Office Elevations 1, 1A, 2, 3 & 3A at Phases A, B, C & D:
The Attached drawings are the typical demountable wall partition elevations outlining the base bid elevation profile and the Alternate 4 elevation profile as referenced on the plans.
9. Refer to Specifications Section 10615 Demountable Partitions, clarification of Alternate No.4 Demountable partition wiring per the basis of design:
Conventional wiring will include:
-Tile cut out.
- Mounting brackets (factory installed).
- Conventional back box (factory installed).
- ¾” EMT (for power & data) to the top or bottom of the panel (factory installed). EMT will extend 6”-8” above finished ceiling after installed for ceiling fed power or to the bottom of the frame for floor fed power.
- ¾” EMT will be cut 16-24” from its overall height, with the top section removed and secured to the lower portion of the EMT with ties from the factory for ease of install. A coupler will be included and attached onto the top end of the lower EMT to attach the upper EMT on-site. Insert the top section of EMT through holes in Ceiling Track Electrical Spline Plates and couple the 2 sections of EMT together.
- Ceiling Track Electrical Spline Plates with holes for electrical pass-through will ship with each project containing EMT; these spline plates are to be located above all power / EMT locations where lines are to be run into the ceiling.
10. Refer to Drawing A400.4:
Lobby back wall elevation No. 26 was added to drawing.
The Proposal due date is hereby extended from May 24, 2010 to 2:00 p.m. May 27, 2010.