About this file

SF1442 and Price List

View the file

Other files

File Type Posted
Amendment 0002 A400-4 - ENLARGED PLANS ELEVATIONS PHASE D.pdf PDF
Amendment 0002 SF30.pdf PDF
Amendment 0002 A400-1 - ENLARGED PLANS ELEVATIONS PHASE A.pdf PDF
Amendment 0002 A600-1 - DOOR SCHEDULE PHASE A.pdf PDF
Amendment 0001 GS01P10BZC0022.pdf PDF
pre-proposaslattendees.pdf PDF
PreProposalConference.pdf PDF
FINAL WORKING DOC 041910 - DO NOT DELETE.pdf PDF
Phase III Complete Spec.pdf PDF
Wage Determination MA100001 4.16.2010.pdf PDF
RFP 2 AGREEMENT.pdf PDF
REPSANDCERTS1.doc DOC document
RFP 2 SOLICITATION.pdf PDF
Pre Bid.doc DOC document
Short List Revised.doc DOC document
Short List.doc DOC document
ONeil RFP I Amendment 0001.doc DOC document
O'Neill Phase I RFP Final 030410.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GS-01P-09-BZ-C-0022 1

1. Solicitation No. 2. Type of Solicitation 3. Date Issued Page of Pages SOLICITATION, OFFER, AND AWARD GS-01P-10-BZ-C-0022 Sealed Bid (IFB) April 21, 2010 1 of 3

(Construction, Alteration, or Repair) X Negotiated (RFP) IMPORTANT – The “offer” section on the reverse must be fully completed by offeror.

4. Contract No. 5. Requisition/Purchase Request No. 6. Project No.

VMA0011

7. Issued By Code 1PC 8. Address Offer to Code 1PC GSA/ Design and Construction Division(1PC) Same Address as Block 7 T.P. O'Neill Federal Building Attn:

10 Causeway St,11th Floor Boston, MA 02222-1077

A. Name B. Telephone No. (Include area code) (No Collect Calls)

Deborah Fournier/Kim Yates (617) 565-5970/6013 9. For Information Call:

SOLICITATION

NOTE: In sealed bid solicitation “offer” and “offeror” mean “bid” and “bidder”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: (Title, Identifying No., Date)

Project Title: 10th and 11th Floor Renovations, Thomas P O’Neill Federal Building, Boston MA

Project No.: VMA0011

Project Location: Boston, Massachusetts

The magnitude of construction is between $5,000,000 and $10,000,000. The NAICS code is 236220. Size Standard is $33.5M.

Drawings and Specifications will be posted to https://www.fbo.gov/

11. The Contractor shall begin performance within 14 calendar days and complete it within ndar days after receiving the award, X notice to proceed. This performance period is X mandatory negotiable. ( See Section 00800, FAR Clause 52.211-10)

12A. The Contractor must furnish any required performance and payment bonds? 12B. Calendar Days (If “YES”, indicate within how many calendar days after award in item 12B.)

X Yes No

13. Additional Solicitation Requirements:

A. Sealed offers in original and 3 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM (hour) local time May 24, 2010 If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is Is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 Standard Form 1442 (REV. 4-85) Prescribed by GSA FAR (48 CFR) 53.236-1 (e)

GS-01P-09-BZ-C-0022 2

OFFER (Must be fully completed by offeror)

15. Telephone No. (Include are code)

14. Name and Address of Offeror (Include ZIP Code)

Code Facility Code

16. Remittance Address (Include on it different than Item 14)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this is accepted by the Government in writing within 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum.

AMOUNTS

See attached Section B, Schedule of Offers.

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendment to the solicitation - give number and data of each)

AMENDMENT

No.

DATE

20A NAME,TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print) 20B. SIGNATURE 20c. OFFER DATE

AWARD (to be completed by Government)

21. ITEM(S) ACCEPTED

22. Amount

23. Accounting and Appropriation Data

25. Other Than full and open competition pursuant to 24. Submit Invoices to Address shown in Item 26

(4 copies unless otherwise specified)

10 U.S.C. 2304(c) ( ) 41 U.S.C 253 (c) ( )

26. Administered by Payment will be made by GSA/ Design and Construction Branch, 1PC T.P. O'Neill Federal Building 10 Causeway Street, 11th Floor Boston, MA 02222-1077

General Services Administration Finance Division, (7BCPC) P.O. Box 17181, Room 5A-30 Fort Worth, TX 76102-0181

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return 3 copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work, requisition stated in this contract. The rights and obligation s of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and(c) the clauses, representations certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. Name and Title of Contractor or Person authorized

31A. Name of Contracting Officer (Type or Print) Deborah A. Fournier Contracting Officer

30C. Date 31B. United States of America 31C. Award Date 30b. Signature

By

STANDARD FORM 1442 BACK (REV. 4-85)

GS-01P-09-BZ-C-0022 3

SECTION B

SCHEDULE OF OFFERS:

(All offeror's are required to provide prices as follows) Tenth and Eleventh Floor Buildout for Permanent Relocation of PBS

Thomas P. O’Neill Federal Building, Boston MA Please note that Alternates 2 and 3 are not used)

ITEM SUPPLIES/SERVICES QTY. UNIT UNIT PRICE AMOUNT

Base Offer RECOVERY, The base offer includes the Entire Project as described in the Bidding Documents. (Please note this is a phased project and each phase shall be constructed separately and sequentially.)

LS

Alternate 1 RECOVERY, Provide porcelain floor tile at 11th floor Elevator Lobby Room 1101, including Toilet Room vestibules, up to Toilet Room doors, as shown on drawings A101.4 and A101.4.1 and Specification 09340.

Alternate 4 RECOVERY, Construct Type ‘C’ partitions as demountable partitions in lieu of gwb and stud partitions. Specification Section 10615, Demountable Partitions and Drawings A001, A100.1, A100.2, A100.3, A100.4.

LF

Alternate 5 RECOVERY, Provide woven vinyl fabric tile flooring throughout project tenant areas on 10th and 11th floors in lieu of carpet tile. See Specification 09682 and drawings A101.1, A101.2, A101.3 and A101.4.

Option 1 RECOVERY, Remove existing and provide new water saving water closets, lavatories, counters, toilet accessories, hands-free faucets and devices, and associated hardware, traps, supply valves and stems, and wax seals;

ceramic tile at walls and floors, sanitary base and trim pieces, and new toilet partitions in Mens and Womens Toilet Rooms on 11th Floor, as shown in Drawings for Phase IIID, D100.4, A100.4, A100.4.1, A400.4, E100.4, PD100.4 and P100.4 and specified in Sections 10160, 10810, 15052, 15061, 15082, 15110, 15140, 15150 and 15410.

GS-01P-09-BZ-C-0022 4

Option 2 new water saving water closets, lavatories, counters, toilet accessories, hands-free faucets and devices, and associated hardware, traps, supply valves and stems, and wax seals;

ceramic tile at walls and floors, sanitary base and trim pieces, and new toilet partitions in Mens and Womens Toilet Rooms on 10th Floor, refer to Drawings, D100.4, A100.4, A100.4.1, A400.4, E100.4 PD100.4 and P100.4 and specified in Sections 10160, 10810, 15052, 15061, 15082, 15110, 15140, 15150 and 15410.

Option 3 new water saving water closets, lavatories, counters, toilet accessories, hands-free faucets and devices, and associated hardware, traps, supply valves and stems, and wax seals;

ceramic tile at walls and floors, sanitary base and trim pieces, and new toilet partitions in Mens and Womens Toilet Rooms on 9th Floor, refer to Drawings, D100.4, A100.4, A100.4.1, A400.4, E100.4, PD100.4 and P100.4 and as specified in Sections 10160, 10810, 15052, 15061, 15082, 15110, 15140, 15150 and 15410.

Option 4 RECOVERY, Provide variable tint interior glazing at all exterior windows within RC Office 1152, approximately 150 sf. (Exterior windows are approximately 4’-0” high.) as referenced on Drawings, A100.4, A100.4.1, E101. and as specified in Sections 08800.

Option 5 glazing at all exterior windows within tenant areas on Eleventh Floor, except elevator lobby, approximately 3,100 sf. (Exterior windows are approximately 4’-0” high.) reference Drawings, A100.2, A100.3 and A 100.4, E100,2, E100.3, E100.4. and as specified in Sections 08800.

Option 6 glazing at all exterior windows within tenant areas on Tenth Floor, approximately 1,035 sf.

(Exterior windows are approximately 4’-0” high.) reference Drawings, A100.1, E100.1 and as specified in Sections 08800.

GS-01P-09-BZ-C-0022 5

Option 7 RECOVERY, Provide porcelain floor tile at 10th floor Elevator Lobby, including Toilet Room vestibules, up to Toilet Room doors, in accordance with Specification 09340 and drawings A101.4 and A101.4.1.

Option 8 RECOVERY, Provide porcelain floor tile at 9th floor Elevator Lobby, including Toilet Room vestibules, up to Toilet Room doors, in accordance with Specification 09340 and drawings A101.4 and A101.4.1.