Amendment 0001 GS01P10BZC0022.pdf

PDF 20 KB Posted

Attached to
RECOVERY: Construction Services to Renovate Tenth and Eleventh Floors of the ONeil Federal Building
Solicitation number
Not on record
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Amendment 0002 A400-4 - ENLARGED PLANS ELEVATIONS PHASE D.pdf PDF
Amendment 0002 SF30.pdf PDF
Amendment 0002 A400-1 - ENLARGED PLANS ELEVATIONS PHASE A.pdf PDF
Amendment 0002 A600-1 - DOOR SCHEDULE PHASE A.pdf PDF
pre-proposaslattendees.pdf PDF
PreProposalConference.pdf PDF
FINAL WORKING DOC 041910 - DO NOT DELETE.pdf PDF
Phase III Complete Spec.pdf PDF
ONeill SF1442.pdf PDF
Wage Determination MA100001 4.16.2010.pdf PDF
RFP 2 AGREEMENT.pdf PDF
REPSANDCERTS1.doc DOC document
RFP 2 SOLICITATION.pdf PDF
Pre Bid.doc DOC document
Short List Revised.doc DOC document
Short List.doc DOC document
ONeil RFP I Amendment 0001.doc DOC document
O'Neill Phase I RFP Final 030410.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print) Deborah Fournier Contracting Officer

15B. Contractor/Offeror 15C. Date Signed 16C. Date Signed

(Signature of person authorized to sign)

16B. United States of America

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

1. Contract ID Code Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

0001 05/05/2010 VMA00117

6. Issued By Code 1PC 7. Administered By (If other than Item 6) Code 1PC GSA/PBS Property Dev. Div. GSA/PBS Property Dev. Div.

T.P. O'Neill Federal Bldg T.P. O'Neill FOB 10 Causeway Street 11th Floor 10 Causeway Street 11th Floor Boston, MA 02222-1077 Boston, MA. 02222-1077

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

GS-01P-10-BZ-C-0022

X 9B. Date (See Item 11) 04/21/2010 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b) C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation No. GS-01P-10-BZ-C-0022 for 10th and 11th Floor Renovations, Thomas P O’Neill Federal Building, in Boston MA is hereby amended as follows:

1. On page 6 of the Solicitation, Section II.C, change the reference to Section V.G. to Section V.F.

2. On page 7 of the Solicitation, Paragraph III.A.1, add: “ARRA funds are available.”

3. On page 16 of the Solicitation, paragraph V.A. delete the sentence “Award will be made based on a combination of previously submitted technical factors and price.” and replace with ”Award will be made to the responsive offeror who submits the proposal which will provide the best value to the government in terms of technical qualifications and price.”

4. On page 16 of the Solicitation, delete the phrase in brackets and replace with “The total evaluated price of the offer will be the total evaluated price of the Base Contract, all alternates, and all options.

5. On page 18 of the Agreement delete III.A.15 in its entirety.

6. On pages 28-29 of the Agreement, delete the second printing of FAR 52.225-22.

7. On page 5 of the Solicitation, Paragraph I.H. change the due date to May 24, 2010.

8. Change any and all references to the period of performance to 584 calendar days from receipt of the NTP.

9. The original documents and specifications are being modified as follows:

A. Drawing A100.2 and A400.2 - Revise Office 1128: Delete partition type D (Demountable partition and glazing) and construct partition type B. Install wire security mesh with sound attenuation batts within gwb partitions throughout extent of office 1128.

B. Drawing A001 - Revise General Note 7 to read:

Contractor shall layout using colored tape on concrete locations of all interior partitions and work stations prior to the start of framing, consult Architect with any questions or field discrepancies prior to commencing work. Layout to be approved by GSA.

C. Specification 08800 Clarification - Liquid Crystal Privacy Glass: Also known as Switch Glass or Switchable Privacy Glass will be used on all interior demountable partition assemblies located at most office walls as outlined on drawing A001 partition type C and D

Variable Tint Glazing: is an automated low voltage exterior window tinting system outlined in the specifications as options 4, 5 & 6 and the electrical power plans at phases A-D.

In section E, Item 1 the term “Switchable Privacy Glass” shall be replaced with the term “Variable Tint Glass”.

D. Drawing E101.1 - Add a 30A, 240V, NEMA L15-30, receptacle in the “TELE” room. Provide 4- #10AWG in ¾” EMT from this receptacle to panel PL10-3A, circuits 57,59.

E. Drawing E600.1 - Add a 30A, 2P circuit breaker in panel PL10-3A, circuits 57,59. Label the description for this circuit breaker TELE RM.

F. Drawing ED100.1 - Add General Note 14: Existing circuits, receptacles, switches, and lighting in the “TEL.” room shall remain.

G. Drawing E101.2 - Add a 30A, 240V, NEMA L15-30, receptacle in the “TELE” room. Provide 4- #10AWG in ¾” EMT from this receptacle to panel PL11-2A, circuits 35,37.

H. Drawing E600.2 - Add a 30A, 2P circuit breaker in panel PL11-2A, circuits 35,37. Label the description for this circuit breaker TELE RM.

I. Drawing ED100.2 - Add General Note 14: Existing circuits, receptacles, switches, and lighting in the “TEL.” room adjacent to the existing electrical room and the stairs shall remain.

J. Drawing ED100.3 -Add General Note 14: Existing circuits, receptacles, switches, and lighting in the “TEL.” room adjacent to the existing electrical room and the stairs shall remain.

K. Drawing E101.4 -Add a 30A, 240V, NEMA L15-30, receptacle in the “TELE” room. Provide 4- #10AWG in ¾” EMT from this receptacle to panel PL11-1, circuits 59,61.

L. Drawing E600.4 - Add a 30A, 2P circuit breaker in panel PL11-1, circuits 59,61. Label the description for this circuit breaker TELE RM.

M. Drawing ED100.4 - Add General Note 14: Existing circuits, receptacles, switches, and lighting in the “TEL.” room adjacent to the existing elevators and the Women’s restroom corridor shall remain.

N. Drawings T400.1, 2, 3 & 4 - Add the following note.

7. Wiring and wall mounted equipment that is no longer used in telephone rooms will be removed. Contractor to coordinate between GSA, FAS network services, OCIO IT, and Facility Management.