Oldhouse Final Plans Part 6.pdf

PDF 29 MB Posted

Attached to
Addendum #2 Oldhouse Branch Refuse Pile
Solicitation number
ARFQ 0313 DEP1700000053 3
Issued by
Nitro City, West Virginia

About this file

This is a final construction plan document for what appears to be a remediation or infrastructure project involving site preparation and temporary water management systems. The document contains detailed survey coordinates and station locations for existing site features including buildings, walls, conveyors, metal debris, and utility pole structures. The project includes specifications for temporary erosion and sediment control measures, specifically rock check dams with sumps, temporary culvert trenches, temporary pipe inlets, and check dams with sediment sumps. Multiple detail sheets are referenced to provide comprehensive construction guidance for these temporary water management features, with specific coordinate data and offset measurements provided to establish precise locations across the project site.

The document serves as a technical reference for contractors executing site work, with detailed coordinate systems using both station and offset measurements to define locations relative to site features. No specific pricing information, contract terms, response dates, or award information is contained within this plan document. The focus is entirely on the physical layout and construction specifications necessary for implementing temporary sediment and erosion control measures during what may be a demolition, remediation, or construction project.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E 1,772,500 E 1,773,000

E 1,772,000

E 1,772,500 E 1,773,000E 1,772,000

N 254,500

N 255,000

N 254,500

N 255,000

EXISTING BUILDING

STATION=5+28.85

OFFSET=200.15R

NORTHING=254490.71

EASTING=1772577.40

EXISTING WALL

STATION=5+66.84

OFFSET=145.40R

NORTHING=254434.14

EASTING=1772463.60

EXISTING CONVEYOR

STATION=5+42.30

OFFSET=202.33R

NORTHING=254494.41

EASTING=1772478.09

EXISTING BUILDING

STATION=0+31.89

OFFSET=23.52L

NORTHING=253851.61

EASTING=1772511.91

EXISTING METAL DEBRIS

STATION=5+45.29

OFFSET=97.21R

NORTHING=254390.32

EASTING=1772493.04

UTILITY POLE STRUCTURE (RUINS)

STATION=5+28.85

OFFSET=63.04R

NORTHING=254360.35

EASTING=1772524.19

E 1,772,000 E 1,772,500

E 1,771,500

E 1,772,000 E 1,772,500E 1,771,500

N 254,000

N 254,500

N 254,000

N 254,500

E 1,771,000

E 1,771,000

N 253,500 N 253,500

E 1,772,500 E 1,773,000

E 1,772,000

E 1,772,500 E 1,773,000E 1,772,000

N 254,500

N 255,000

N 254,500

N 255,000

DETAIL (2)

DETAIL (4)

DETAIL (5)

DETAIL (1)

DETAIL (6)

DETAIL (3)

ROCK CHECK DAM WITH SUMP

DETAIL (2)

DETAIL (1) - CONTINUED

TEMPORARY CULVERT TRENCH

DETAIL (1)

TEMPORARY PIPE INLET CHECK DAM WITH SEDIMENT SUMP

DETAIL (1) - CONTINUED

TEMPORARY CULVERT PROFILE

File details come from the government source that posted it. Updated .