OCTA_IFB_5-4261_DBE_Goal_Weighting.pdf

PDF 55 KB Posted

Attached to
Bus Hoist Replacement at Anaheim Bus Base
Solicitation number
5-4261
Issued by
Orange County, California

About this file

This is a Disadvantaged Business Enterprise (DBE) Goal Weighting document for the Orange County Transportation Authority (OCTA) related to IFB 5-4261, a bus hoist replacement project at the Anaheim Bus Base located at 1717 E. Via Burton Avenue, Anaheim, California. The project involves removing and replacing an existing bus lift, control console, and accessories in the Steam Clean area while protecting surrounding infrastructure, utilities, and systems. The work scope includes obtaining necessary licenses, adhering to OCTA Level 3 Health, Safety and Environmental Specifications, and protecting adjacent building components and drainage systems. The project is valued at $400,000.00 and is scheduled for completion within 240 calendar days.

The DBE goal for this project is set at 6%. The document provides detailed breakdowns of contract work items with corresponding NAICS codes and DBE goal weightings across multiple work categories, including General Conditions (Bonds & Insurance, Mobilization, Equipment, and Fencing at $14,400.00); Bus Lift Replacement at Anaheim Bus Base in Steam Clean Area ($339,018.00); Electrical Work Material and Labor ($6,415.00); Concrete Work Material and Labor ($10,455.00); Health Safety Personnel on site ($14,400.00); and Material, Labor and Equipment ($15,312.00). The total DBE goal weighting amounts to $400,000.00, with work distributed across multiple specialty trade contractors, equipment suppliers, and service providers including site preparation contractors, electrical contractors, concrete specialists, and various merchant wholesalers.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name:

Project Number:

Project Value:

Administrative Management and General Management Consulting Services 20% $2,880.00 Direct Property and Casualty Insurance Carriers 20% $2,880.00 Insurance Agencies and Brokerages 20% $2,880.00 All Other Specialty Trade Contractors 30% $4,320.00 Site Preparation Contractors 10% $1,440.00

100% $14,400.00

Site Preparation Contractors 75% $11,484.00 Other Building Equipment Contractors 25% $3,828.00

100% $15,312.00

Other Building Equipment Contractors 75% $254,263.50 General Freight Trucking, Local 1.5% $5,085.27 General Freight Trucking, Long-Distance, Truckload 1.5% $5,085.27 All Other Specialty Trade Contractors 5% $16,950.90 Other Commercial and Industrial Machinery and Equipment Rental and Leasing 2% $6,780.36

Motor Vehicle Supplies and New Parts Merchant Wholesalers 15% $50,852.70 100% $339,018.00

Electrical Contractors and Other Wiring Installation Contractors 80% $5,132.00 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers 20% $1,283.00

100% $6,415.00

Poured Concrete Foundation and Structure Contractors 80% $8,364.00 Ready-Mix Concrete Manufacturing 10% $1,045.50 Brick, Stone, and Related Construction Material Merchant Wholesalers 10% $1,045.50

100% $10,455.00

Other Scientific and Technical Consulting Services 100% $14,400.00 100% $14,400.00

238910 238290

NAICS Total

541611 524126

238990

238290 484110 484121 238990

238110 327320

532490

423120

238210

DBE Goal Weighting

$14,400

$10,455

$6,415

$339,018

$15,312

$14,400

Health Safety Personnel on site

Concrete work Material, Labor and Equipment

Electrical Work Material and Labor

Bus Lift Replacement at Anaheim Bus Base in Steam Clean Area

IFB 5-4261

$400,000.00

Install new Bus Lift and Control Console

Remove and dispose existing Lift off-site

General Conditions (Bonds & Insurance) Mobilization Equipment Fencing

$400,000.00 Work Item/NAICS Total Project Value

524210

238910

NAICS Total

NAICS Total

NAICS Total

NAICS Total

NAICS Total

$400,000.00

423320

541690

423610

08_15_2025 (1)

File details come from the government source that posted it. Updated .