This is a Statement of Work (SOW) for comprehensive quarterly preventive maintenance services for HVAC systems at the Table Mountain Field Site, operated by the Institute for Telecommunication Sciences (ITS) under the National Telecommunications and Information Administration (NTIA), U.S. Department of Commerce.

The contractor shall provide four quarterly service visits annually: two major preventive maintenance visits (during primary heating season in October-December and primary cooling season in April-June) and two minor preventive maintenance visits in intervening quarters. All quarterly visits require filter replacement, blower section inspection and tightening, electrical system inspection and voltage measurement, control system functional testing, and compressor section inspection including refrigerant pressure and temperature measurement, with compressor motor amperage recording. Major PM visits additionally require thorough cleaning of evaporator and condenser coils, condensate drain pan cleaning and line flushing, and furnace section services including burner cleaning, heat exchanger inspection, and flame sensor testing. The contractor must service 21 HVAC units across multiple buildings (I10C, F5, F6, E12B, A4, F2/T22, T2, and B9) including Mitsubishi heat pumps, Armstrong Air condensing units, Concord furnaces, York packaged units, Sun HVAC, Lennox units, Samsung units, and Trane/American Standard equipment. The Table Mountain Field Site is a designated Radio Quiet Zone requiring 48-hour advance coordination with the government's technical point of contact and strict adherence to site-specific procedures prohibiting cellular phones, two-way radios, and RF-emitting devices. The contractor must provide digital Field Service Reports within five business days of each quarterly visit, documenting service dates, technician names, completed task checklists, all recorded measurements, system operational status, and deficiency descriptions with corrective action recommendations. The period of performance begins at contract award and does not exceed five years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Table Mountain HVAC Services

U.S. Department of Commerce National Telecommunications and Information Administration

Institute for Telecommunication Sciences

1. BACKGROUND

The Institute for Telecommunication Sciences (ITS) provides research and development support for the National Telecommunications and Information Administration (NTIA) by performing basic research in radio science that provides the technical foundation for NTIA’s policy development and spectrum management activities, as well as solving telecommunications challenges for other Federal agencies, state and local Governments, private corporations and associations, and international organizations.

Additionally, ITS addresses emerging telecommunications, information technology, and security challenges and contributes to the creation of telecommunications standards that support the full and fair competitiveness of the U.S. communications and information technology business sectors.

2. OBJECTIVE

The Institute for Telecommunication Sciences (ITS) requires comprehensive, quarterly preventive maintenance services for the Heating, Ventilation, and Air Conditioning (HVAC) systems located at the Table Mountain Field Site. This site includes a designated Radio Quiet Zone, which requires special operational considerations. The objective of this contract is to ensure all specified HVAC equipment is maintained in optimal working condition, minimizing downtime, ensuring personnel comfort, and protecting critical government equipment and scientific operations. This work shall be performed as part of the facility's regular Operations and Maintenance (O&M) activities.

3. SCOPE OF WORK

The contractor shall provide all necessary management, supervision, labor, materials, tools, and equipment to perform quarterly preventive maintenance, inspections, and minor repairs for the HVAC systems listed in Section 4.0 of this SOW.

The service schedule shall consist of four (4) quarterly visits per year, defined as follows:

• Two (2) Major Preventive Maintenance (PM) Visits: One visit shall occur during the primary heating season (typically Oct-Dec) and one during the primary cooling season (typically Apr- Jun). These visits include comprehensive inspection and cleaning tasks.

• Two (2) Minor Preventive Maintenance (PM) Visits: These visits shall occur in the intervening quarters and will consist of inspections and operational checks.

4. SPECIFIC TASKS

The contractor shall perform the following tasks for each unit listed in Section 4.0 during the scheduled service visits.

4.1 Tasks for All Quarterly Visits (Major and Minor PMs)

• Filters: Replace all disposable filters with new filters of the same size and MERV rating. Clean all washable filters.

• Blower Section:

• Inspect and tighten all mounting bolts and fan guard bolts.

• Verify the blower wheel spins freely and is free of obstruction or excessive debris.

• Measure and record blower motor voltage and amperage draw; compare to nameplate ratings.

• Electrical Systems:

• Visually inspect all electrical connections, contactors, and relays. Tighten connections as needed.

• Measure and record primary system voltages and compare to nameplate data.

• Controls:

• Inspect all control and communication wiring connections.

• Functionally test all operational and safety controls (e.g., high/low-pressure switches, temperature sensors).

• Compressor Section:

• Visually inspect for signs of refrigerant or oil leaks.

• Check that compressor mounts are secure.

• Verify capillary tubes and refrigerant lines are secure and not rubbing against other components.

• Measure and record refrigerant pressures and operating temperatures to verify proper charge levels.

• Measure and record compressor motor amperage draw and compare to nameplate ratings.

4.2 Tasks for Major PM Visits ONLY (Twice Annually)

• Evaporator and Condenser Coils: Thoroughly clean all evaporator and condenser coils.

• Condensate System: Clean condensate drain pan and flush drain lines to ensure proper drainage.

• Furnace Section (if applicable):

• Clean burners and blowout the furnace section.

• Inspect the heat exchanger for any signs of wear, cracks, or fatigue.

• Clean the flame sensor and test the ignition sequence.

5. EQUIPMENT TO BE SERVICED

The contractor shall service the following equipment. Note: The contractor is responsible for verifying all model and serial numbers on-site during the first service visit.

Building Manufacturer Equipment Description Model Number Serial Number

I10C Mitsubishi Split-System Heat Pump PUZ-A18NKA7 22U26628B

I10C Mitsubishi Split-System Heat Pump PUZ-A18NKA7 22U26634B

I10C Armstrong Air Condensing Unit 4SCU13LE160P-5 1615D22174

I10C Armstrong Air Condensing Unit 4SCU13LE160P-5 1615E20719

I10C Armstrong Air Condensing Unit 4SCU13LE148P-5 1615F20616

I10C Armstrong Air Condensing Unit 4SCU13LE148P-5 1615E26563

I10C Concord Furnace EC1P60DG-1 6015A19544

I10C Concord Furnace EC1P60DG-1 6015A19536

I10C Concord Furnace EC1P48CG-1 6015F05529

Building Manufacturer Equipment Description Model Number Serial Number

I10C Concord Furnace EC1P48CG-1 6015F05528

F5 York Packaged Unit H1DA036S06A EEEAM207008

F5 Armstrong Air Furnace 1G9S100C16MP11A W1E1058459

F6 Sun HVAC N/A No data plate visible No data plate visible

E12B Lennox Condensing Unit HS6-653V3FW 673

E12B Lennox Air Handler ES2-1203DM 1478017

A4 Mitsubishi Split-System Heat Pump MXZ-SM36NAMHZ (To be verified)

A4 Mitsubishi Indoor Unit MSZ-GL06NA (To be verified)

F2/T22 Samsung Condensing Unit AC036BNTDCH/AA 0WLRPAGW900031H

F2/T22 Samsung Indoor Unit AR18CSDABWKXCV 0YOYOAFW400251X

F2/T22 Samsung Indoor Unit AR18CSDABWKNCV 0KN6PDBW600224Z

F2/T22 Samsung Condensing Unit AJ048BXJ5CH/AA BM1MP3CW800292B

F2/T22 Samsung Condensing Unit AC036BXADCH/AA BLT8P3CWA00218J

F2/T22 Samsung Indoor Unit AR15CSFCMWKN (To be verified)

F2/T22 Samsung Indoor Unit AR24CSFCMWKN (To be verified)

T2 Lennox Heat Pump EL17XP1-030-230A01 5823H09374

T2 Lennox Air Handler CBA38MV-030-230-6-02 1623E19232

B9 Trane / Am. Std. Air Handler 4TXCC005DS3HCAA (To be verified)

B9 Trane / Am. Std. Condensing Unit 4TTA4036A3000AA 20374RBY3F

6. SPECIAL CONSIDERATIONS: RADIO QUIET ZONE

The Table Mountain Field Site is a designated Radio Quiet Zone. The contractor shall coordinate all site visits with the government's technical point of contact (TPOC) at least 48 hours in advance. The use of cellular phones, two-way radios, and other radio-frequency (RF) emitting devices is strictly controlled.

The contractor must adhere to all site-specific procedures to prevent interference with scientific instruments.

7. DELIVERABLES

Following each quarterly service visit, the contractor shall provide a digital Field Service Report to the

TPOC within five (5) business days. The report shall detail, at a minimum:

• Date and time of service.

• Technician(s) name(s).

• A checklist of all tasks performed for each piece of equipment.

• All recorded measurements (voltages, amperages, temperatures, pressures).

• A summary of the system's operational status.

• A detailed description of any deficiencies found and recommendations for corrective action (e.g., repairs beyond the scope of this SOW).

8. PERIOD OF PERFORMANCE

Service starts at the time of the award and does not exceed five years after the award.

STATEMENT OF WORK
1. BACKGROUND
2. OBJECTIVE
3. SCOPE OF WORK
4. SPECIFIC TASKS
4.1 Tasks for All Quarterly Visits (Major and Minor PMs)
4.2 Tasks for Major PM Visits ONLY (Twice Annually)
5. EQUIPMENT TO BE SERVICED
6. SPECIAL CONSIDERATIONS: RADIO QUIET ZONE
The Table Mountain Field Site is a designated Radio Quiet Zone. The contractor shall coordinate all site visits with the government's technical point of contact (TPOC) at least 48 hours in advance. The use of cellular phones, two-way radios, and othe...
7. DELIVERABLES
Following each quarterly service visit, the contractor shall provide a digital Field Service Report to the TPOC within five (5) business days. The report shall detail, at a minimum:
• Date and time of service.
• Technician(s) name(s).
• A checklist of all tasks performed for each piece of equipment.
• All recorded measurements (voltages, amperages, temperatures, pressures).
• A summary of the system's operational status.
• A detailed description of any deficiencies found and recommendations for corrective action (e.g., repairs beyond the scope of this SOW).
8. PERIOD OF PERFORMANCE