This is Addendum No. 2 to the Contract Documents for the Large Onsite Septic System (L.O.S.S.) project at the Newport Municipal Airport in Klamath County, Oregon. The addendum modifies the original Invitation to Bid issued on October 29, 2025, and provides clarifications or amendments to the contract requirements, technical specifications, or bidding procedures. Bids remain due on November 19, 2025, at 2:00 p.m. local time. The project encompasses comprehensive infrastructure improvements including septic tanks, dose tanks, grease tanks, drain fields, pump stations, filters, utility connections, and electrical system upgrades across multiple airport areas including the FBO, FedEx, Coast Guard, and Final Treatment Area. The contract duration is 111 calendar days from the Notice to Proceed, with potential liquidated damages assessed at $250 per day for project delays. Contractors must be registered with the Construction Contractors Board, perform at least 25% of the work with their own organization, and maintain a qualified superintendent throughout the project.

The engineer's estimated cost opinion ranges between $600,000 and $700,000, with project funding sourced from local municipal infrastructure improvement budgets. Payment is structured in three phases: 40% upon system component order confirmation, 50% upon satisfactory installation and testing, and 10% upon project closeout. Bidders must submit a bid bond, non-collusion affidavit, first-tier subcontractor disclosures, and performance bonds. Contractors must comply with prevailing wage rates and Oregon state and local regulations. The contract does not include specific set-aside designations for disadvantaged enterprises and is open to all qualified contractors. The project involves 35 drawing sheets detailing electrical, construction, and septic system components, requiring demonstrated technical proficiency in septic system installation, electrical work, underground utilities, and integration with existing airport infrastructure. No incumbent vendors are specifically identified for this procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NPT015, Large Onsite Septic System 1 Addendum No. 2

ADDENDUM NO. 2 Date: November 14, 2025 to the Contract Documents dated October 2025 for the Construction of

LARGE ONSITE SEPTIC SYSTEM (L.O.S.S)

TO ALL PLANHOLDERS AND/OR PROSPECTIVE BIDDERS:

The following changes, additions, and/or deletions are hereby made as part of the Contract Documents for the construction of "Large Onsite Septic System (L.O.S.S)" dated October 2025, as fully and completely as if the same were fully set forth therein. All other conditions of the original Contract Documents shall remain the same.

SECTION I – BIDDING INFORMATION

Invitation To Bid

Page 1, Project description above the Engineer’s Cost Opinion

Add the following to the end of paragraph 1: “Construction is planned for 2027. Notice to proceed is anticipated to occur approximately 12 months after contract award.”

Page 2, Qualifications of Bidders

Revise callout from Addendum #1 reading:

“Bidder shall have a Sewage Disposal Service License from the Oregon Department of Environmental Quality, and at least one member, employee or subcontractor of the licensed business must be a certified installer.” To read “Bidder or any of their subcontractors shall have a Sewage Disposal Service License from the Oregon Department of Environmental Quality, and at least one member or employee of the licensed business must be a certified installer.”

SECTION VII – DRAWINGS

Sheet No. 2

Base Bid Schedule

Revise Base Bid Schedule title to read: “Base Bid Schedule – Construction Year 2027”

Additive Bid A Schedule

Revise Additive Bid A Schedule title to read: “Additive Bid A Schedule – Construction Year 2027”

Additive Bid B Schedule

Revise Additive Bid B Schedule title to read: “Additive Bid B Schedule – Construction Year 2027”

Sheet No. 3

Construction Schedule Notes

Add Note No. 3 to read: “Construction is anticipated to begin in 2027. The Owner shall have the final authority regarding start date of construction.”

NPT015, Large Onsite Septic System 2 Addendum No. 2

Sheet No. 4

Subsurface Drip System Notes

Add Note No. 8 to read: “Rototilling or non-vibratory plow shall not be used for drip line installation. Vibratory plow or approximately 1-inch trencher may be used. Soil structure must be maintained, except the minimum needed for insertion of the flexible drip tubing.”

SUPPLEMENTAL INFORMATION

A copy of the Pre-Bid Attendance List is attached for reference.

A copy of the Pre-Bid Meeting Minutes is attached for reference.

All Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 in the Proposal, or by submitting the Addendum with the bid package. Proposals submitted without Addendum acknowledgement, or without this Addendum, will be considered non-responsive.

Geoff W. Vaughn, P.E.

Precision Approach Engineering, Inc.

p:\n\npt015-loss\0700bld\0710bidding\addenda\addendum no 2\npt015-addendum no2 to contract documents.docx