PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 6p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- C ov er
.d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
COVER SHEET
PRECISION APPROACH ENGINEERING, INC.
OCT 2025
EMS
JAW
GWV
AS SHOWN
NPT015
o
NORTH
0 0.5 1
SCALE IN MILES
Y A Q U I N A B A Y
P A
C I
F I
C
O
E
A N
NEWPORT
MUNICIPAL
AIRPORT
NEWPORT
NEWPORT MUNICIPAL AIRPORT
INDEX TO DRAWINGSVICINITY MAP
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
Sheet List TableSheet Number Sheet Title
1 COVER SHEET
2 LEGEND AND BID SCHEDULE
3 GENERAL NOTES
4 CONSTRUCTION NOTES
5 SITE PLAN
6 BID SCHEDULE LIMITS
7 CONSTRUCTION SAFETY AND PHASING PLAN - CRITICAL AREAS
8 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 1
9 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 2
10 CONSTRUCTION SAFETY AND PHASING PLAN - PHASE 3
11 CONSTRUCTION SAFETY AND PHASING PLAN - NOTES AND DETAILS
12 EROSION AND SEDIMENT CONTROL PLAN
13 EROSION AND SEDIMENT CONTROL NOTES
14 EROSION AND SEDIMENT CONTROL DETAILS
15 LAYOUT PLAN
16 ELECTRICAL PLAN
17 ELECTRIC PANEL DETAILS
18 SCHEMATIC DIAGRAM
19 FINAL TREATMENT PLAN
20 FBO AND FED-EX - SITE PLAN
21 COAST GUARD - SITE PLAN (ADDITIVE BID)
22 FBO HANGAR - TANK DETAIL
23 FEDEX TANK DETAIL
24 COAST GUARD - TANK DETAIL 1
25 COAST GUARD - TANK DETAIL 2
26 COMINGLE TANK DETAIL
27 RECIRCULATION TANK DETAIL
28 DOSING TANK DETAIL
29 DRIP DETAILS
30 INFLUENT FILTER DETAIL
31 INFLUENT FILTER DETAILS
32 TRACER WIRE AND PIPE FITTING DETAILS
33 TRENCH DETAILS
34 BORING AND PAVEMENT DETAILS
35 PARTS LIST
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
BASE BID SCHEDULELEGEND
ELECTRICAL LEGEND
NEWEXISTING
POH
P
CIVIL SYMBOLS LEGEND
EXISTING NEW
T
G
W W
SS SS
SD SD
SDSD
PROPERTY LINE
EDGE OF PAVEMENT
EDGE OF GRAVEL
CONTOUR
DITCH FLOW LINE
FENCE
STORM DRAIN
UNDER DRAIN
CULVERT
SANITARY SEWER
WATER
GAS
TELEPHONE
IRRIGATION
SLOPE SYMBOL
CATCH BASIN
STORM DRAIN MANHOLE
CLEANOUT
CULVERT END STRUCTURE
SURFACE FLOW DIRECTION
SANITARY MANHOLE
FIRE HYDRANT
WATER METER
WATER VAULT
WATER VALVE
IRRIGATION VALVE
TIE DOWN
SIGN
SURVEY CONTROL POINT
SURVEY FOUND MONUMENT
BRASS CAP
BENCHMARK
AIRPORT BEACON
ABANDONED FEATURE LINE
DEMO FEATURE LINE
DEMO FEATURE LINE
SS
HANDHOLE
POWER VAULT
DUCT MARKER
JUNCTION CAN
ELECTRICAL RISER
RUNWAY EDGE LIGHT AND THRESHOLD LIGHT
C = CLEAR
R = RED
G = GREEN
Y = YELLOW
O = OPAQUE
ABANDONED LIGHT
RUNWAY LIGHT IN PAVEMENT (FLUSH MOUNT)
REIL (RUNWAY END IDENTIFIER LIGHT)
PAPI (PRECISION APPROACH PATH INDICATOR)
TAXIWAY LIGHT (BLUE LENS)
TAXIWAY LIGHT IN PAVEMENT (FLUSH MOUNT)
RETROREFLECTIVE MARKER
POWER CIRCUIT / OVERHEAD
POWER UNDERGROUND
POWER POLE
GUY WIRE
GUIDANCE SIGN
SS
JJ
IRR
UD
AVIATION LEGEND
FUTUREEXISTING
OBJECT FREE AREA (OFA)
OBSTACLE FREE ZONE (OFZ)
OFZ-OFA
RUNWAY OBJECT FREE AREA
RUNWAY OBSTACLE FREE ZONE
RUNWAY PROTECTION ZONE
RUNWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
TAXILANE OBJECT FREE AREA
TAXIWAY SAFETY AREA
H
A
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 6p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- C ov er
.d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
LEGEND AND BID SCHEDULE
PRECISION APPROACH ENGINEERING, INC.
OCT 2025
EMS
JAW
GWV
ADDITIVE BID A SCHEDULE
ADDITIVE BID B SCHEDULE
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
1 C-102 TEMPORARY EROSION CONTROL LS 1
2 C-102 INSTALLATION AND REMOVAL OF SILT FENCE LF 350
3 C-105 MOBILIZATION LS 1
4 E-960 ABANDON SEPTIC TANKS LS 1
5 E-960 FBO SEPTIC IMPROVEMENTS LS 1
6 E-960 FEDEX SEPTIC IMPROVEMENTS LS 1
7 E-960 FINAL TREATMENT IMPROVEMENTS LS 1
8 E-960 SEPTIC TRENCH, PAVED LF 120
9 E-960 SEPTIC TRENCH, NON-PAVED LF 2,540
10 E-960 2-INCH PVC - SEPTIC LF 2,660
11 E-960 PAVEMENT REMOVAL & REPAIR SY 100
12 T-901 HYDROSEEDING Per 1,000 SF 66
13 L-108 NO. 2 AL XHHW-2 WIRE LF 1,350
14 L-108 NO. 6 AL XHHW-2 EGC WIRE LF 450
15 L-109 MISCELLANEOUS ELECTRICAL IMPROVEMENTS - FBO SEPTIC LS 1
16 L-109 MISCELLANEOUS ELECTRICAL IMPROVEMENTS - FEDEX SEPTIC LS 1
17 L-109 MISCELLANEOUS ELECTRICAL IMPROVEMENTS - FINAL TREATMENT LS 1
18 L-109 NEW ELECTRICAL METER AND SERVICE LS 1
19 L-110 ELECTRICAL TRENCH, NON-PAVED LF 316
20 L-110 2-INCH PVC ELECTRICAL CONDUIT LF 316
21 E-130 2-INCH PVC - CROSS DIRECTIONAL BORE LF 1,440
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
A-1 C-105 MOBILIZATION LS 1
A-2 E-960 ABANDON SEPTIC TANKS LS 1
A-3 E-960 COAST GUARD SEPTIC IMPROVEMENTS LS 1
A-4 E-960 SEPTIC TRENCH, NON-PAVED LF 190
A-5 E-960 2-INCH PVC - SEPTIC LF 190
A-6 E-960 PAVEMENT REMOVAL & REPAIR SY 85
A-7 T-901 HYDROSEEDING Per 1,000 SF 2
A-8 L-109 MISCELLANEOUS ELECTRICAL IMPROVEMENTS - COAST GUARD SEPTIC LS 1
BID ITEM SPEC. DESCRIPTION UNIT QUANTITY CONSTRUCTION
QUANTITY
B-1 C-105 MOBILIZATION LS 1
B-2 E-960 SEPTIC TRENCH, NON-PAVED LF 825
B-3 E-960 2-INCH PVC - SEPTIC LF 825
B-4 T-901 HYDROSEEDING Per 1,000 SF 5
AutoCAD SHX Text 101.8
AutoCAD SHX Text W
AutoCAD SHX Text
HH
AutoCAD SHX Text P
AutoCAD SHX Text
DM
AutoCAD SHX Text E
AutoCAD SHX Text
HH
AutoCAD SHX Text P
AutoCAD SHX Text
DM
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
DIGITALLY SIGNED
1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL CONTRACT
PROVISIONS, AND TECHNICAL SPECIFICATIONS OF THE CONTRACT DOCUMENT FOR
REQUIREMENTS RELATING TO CONSTRUCTION SAFETY, LAYOUT WORK, QUALITY
CONTROL TESTING AND OTHER CONTRACT PROVISIONS.
2. THE CONTRACTOR, ENGINEER, OWNER, AND OTHER INVITED REPRESENTATIVES OR
GUESTS WILL CONDUCT A PRE-CONSTRUCTION MEETING PRIOR TO BEGINNING
CONSTRUCTION IN ORDER TO DISCUSS PROJECT SCHEDULE, CONSTRUCTION
REQUIREMENTS, AIRFIELD IMPACTS, AND OTHER AGENDA ITEMS RELATED TO THE
PROJECT.
3. THE CONTRACTOR SHALL OBTAIN AND THE OWNER WILL PAY FOR ANY PERMITS
NECESSARY TO COMPLETE THIS PROJECT.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT ALL UTILITIES
DURING THIS PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING THE
UTILITY NOTIFICATION CENTER TO LOCATE PUBLIC UTILITIES AND FOR ANY ADDITIONAL
UTILITY LOCATES INCLUDING HIRING A PRIVATE LOCATE SERVICE IF REQUIRED. ANY
UTILITIES DAMAGED IN CONJUNCTION WITH THE CONSTRUCTION ACTIVITIES SHALL BE
REPLACED AND/OR REPAIRED BY THE CONTRACTOR AS APPROVED BY THE OWNER.
5. ALL STAGING AREAS AND HAUL ROUTES, INCLUDING PUBLIC ROADS USED FOR
ACCESS, SHALL BE MAINTAINED DURING CONSTRUCTION AND SHALL BE RESTORED TO
ORIGINAL OR BETTER CONDITION AT THE COMPLETION OF PROJECT WORK.
1. THE CONTRACTOR SHALL PREPARE AND SUBMIT A "CONSTRUCTION SCHEDULE" TO THE
ENGINEER AND OWNER FOR REVIEW A MINIMUM OF 10 DAYS PRIOR TO STARTING
CONSTRUCTION OR PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, WHICHEVER
OCCURS EARLIER. THE SCHEDULE MUST BE ACCEPTABLE TO THE ENGINEER AND
OWNER PRIOR TO BEGINNING WORK.
2. THE CONSTRUCTION SCHEDULE SHALL BE REVISED ANY TIME AN ELEMENT OF WORK
DOES NOT COINCIDE WITH THE INITIAL TIME LINE PRESENTED OR IF REQUESTED BY THE
ENGINEER OR OWNER.
1. THE CONTRACTOR, ENGINEER, RPR, OWNER, OWNER'S REPRESENTATIVE AND OTHER
INVITED REPRESENTATIVES OR GUESTS WILL CONDUCT A WEEKLY CONSTRUCTION
MEETING IN ORDER TO DISCUSS ACTIVITIES ON THE PROJECT. THE MEETING SHALL BE
USED TO DISCUSS CONSTRUCTION ISSUES, PROJECT SCHEDULE, AIRCRAFT AND
CONSTRUCTION SAFETY, AND OTHER AGENDA ITEMS RELATED TO THE PROJECT.
SPECIFIC ACTIVITIES ANTICIPATED FOR THE FOLLOWING WEEK SHALL BE DISCUSSED, AND
A TWO WEEK SCHEDULE LOOK AHEAD SHALL BE PROVIDED BY THE CONTRACTOR AND
DISCUSSED. THE CONTRACTOR SHALL PREPARE AND PROVIDE THE TWO WEEK LOOK
AHEAD SCHEDULE TO THE RPR A MINIMUM OF 24 HRS PRIOR TO THE WEEKLY MEETING.
1. THE CONTRACTOR SHALL HAVE A FULL TIME SUPERINTENDENT ON THE PROJECT SITE
ANY TIME WORK IS BEING ACCOMPLISHED ON THE AIRPORT. THIS INCLUDES WORK
BEING PERFORMED BY SUBCONTRACTORS OR SERVICE PROVIDERS UNLESS
OTHERWISE APPROVED BY THE OWNER.
2. THE CONTRACTOR SHALL ASSIGN ONE PERSON TO BE THE SAFETY OFFICER DURING
THE PROJECT. THE SAFETY OFFICER SHALL BE ONSITE AT ALL TIMES WHEN WORK IS
OCCURRING IN THE AIR OPERATIONS AREA (AOA) WHEN THE AIRPORT IS OPEN UNLESS
OTHERWISE APPROVED BY THE OWNER. THE SAFETY OFFICER SHALL BE RESPONSIBLE
FOR THE EDUCATION AND TRAINING OF ALL PERSONNEL WHO WILL ACCESS AIRPORT
PROPERTY. THE OFFICER SHALL MAINTAIN RECORDS INDICATING THAT PERSONNEL
HAVE BEEN TRAINED AND ARE FAMILIAR WITH SAFETY RULES AND REGULATIONS
RELATED TO OPERATIONS AT THE AIRPORT DURING CONSTRUCTION. PERSONNEL WHO
VIOLATE SAFETY REQUIREMENTS MAY BE REMOVED FROM THE PROJECT AT THE
DISCRETION OF THE OWNER. THE SAFETY OFFICER SHALL ALSO BE RESPONSIBLE FOR
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT.
3. THE CONTRACTOR'S SUPERINTENDENT AND SAFETY OFFICER SHALL ATTEND ALL
WEEKLY CONSTRUCTION MEETINGS.
CONTRACTOR'S SUPERINTENDENT AND SAFETY OFFICER
WEEKLY CONSTRUCTION MEETING
GENERAL NOTES CONSTRUCTION SCHEDULE
1. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE
OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR
952-001-0001 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY
CALLING THE CENTER AT (800)332-2344.
CALL 811 BEFORE YOU DIG
2. INSTALLER SHALL REQUEST AN UTILITY LOCATES BY A QUALIFIED SERVICE FOR ALL
POTENTIAL UNDERGROUND UTILITIES BEFORE EXCAVATION WORK COMMENCES.
3. ALL WORK AND MATERIAL SHALL CONFORM WITH OAR 340 DIV. 71 & 73 APPROVED
DESIGN PERMIT, AND APPROPRIATE LAWS. PERMITS RELATING (BUT NOT LIMITED TO)
PLUMBING, ELECTRICAL, AND GRADING MUST BE COORDINATED WITH THE ON-SITE
SYSTEM INSTALLER AND DESIGNER.
4. MINOR MODIFICATIONS TO ACCOMMODATE STUMPS, BOULDERS OR OTHER
UNFORESEEN OBSTACLES MAY BE NEEDED. MAJOR MODIFICATION CAN BE
PERFORMED WITHOUT RE-DESIGN AND REGULATORY APPROVAL.
5. IF THE INSTALLATION CONTRACTOR (INSTALLER) NOTES ANY CONFLICTS WITH
APPLICABLE STATE AND/OR LOCAL LAWS, RULES OR REQUIREMENTS, THEY SHALL
REQUEST A CLARIFICATION BEFORE ORDERING OR INSTALLING AFFECTED MATERIALS
OR WORK. THIS MAY INCLUDE AND IS NOT LIMITED TO SUCH FACTORS AS: LAND-USE
REGULATIONS, GRADING ORDINANCES, EROSION CONTROL DISTRICTS, HAULING
LIMITS. NO REIMBURSEMENT TO THE CONTRACTOR WILL BE PROVIDED FOR
UNAUTHORIZED WORK.
6. INSTALLER IS TO OBTAIN COPIES OF ALL NECESSARY PERMITS, AUTHORIZATIONS,
LICENSES ETC. PRIOR TO INITIATING CONSTRUCTION, INCLUDING THAT SPECIALTY
DESIGN WORK DESIGNATED TO A SUBCONTRACTOR WHICH IS DIRECTLY OR
INDIRECTLY RELATED TO THE SYSTEM CONSTRUCTION, DESIGN, DELIVERY, OR
INSTALLATION.
7. IF APPLICABLE, INSTALLER SHALL MAINTAIN ANY AND ALL SURVEY MONUMENTS,
WHICH ARE AFFECTED BY WORK AND ACTIVITIES, RELATED TO THE PROJECT.
MONUMENTS, IF DAMAGED BY THE INSTALLER, SHALL BE RESET BY A LICENSED
SURVEYOR AT THE INSTALLER'S EXPENSE.
8. ALL MATERIALS AND EQUIPMENT SHALL BE OF THE TYPE, MODEL AND BRAND LISTED
FOR THE MANUFACTURERS SPECIFIED, UNLESS OTHERWISE AUTHORIZED BY THE
SYSTEM DESIGNER. SUBSTITUTION OF MATERIALS AND EQUIPMENT SHALL RECEIVE
PRE-AUTHORIZATION AND THE CONTRACTOR/INSTALLER WILL BE RESPONSIBLE FOR
PROVIDING PERFORMANCE AND OPERATING DATA
9. EXCEPT AS SPECIFICALLY SET FORTH BY THE LAWS AND COURTS OF THE STATE OF
OREGON, THERE IS NO WARRANTY EXPRESSED OR IMPLIED, INCLUDING THE
WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE FOR THE EQUIPMENT AND
MATERIALS SPECIFIED IN THE APPROVED PLANS. THE PURCHASER OR OWNER MAY
HAVE CERTAIN RIGHTS AND RESPONSIBILITIES OF WARRANTY DIRECTLY WITH THE
MANUFACTURER OF THE INDIVIDUAL COMPONENTS.
10.INSTALLER SHALL PREPARE, MAINTAIN AND PROVIDE, AT COMPLETION OF THE
PROJECT, DRAWINGS DETAILING THE CONSTRUCTION “AS-BUILT” AND SHALL PROVIDE
THE OWNER & DESIGNER WITH THE MANUFACTURER'S CURRENT SPECIFICATION AND
OPERATING DATA ON ALL EQUIPMENT INSTALLED PRIOR TO FINAL PAYMENT TO THE
INSTALLER.
11.THE CONTRACTOR SHALL PROVIDE MANUFACTURER'S SHOP DRAWINGS AND
ENGINEERING CALCULATION SUBMITTALS FOR ALL PUMPS, TANKS & DRIPFIELD PARTS
FOR DESIGNER REVIEW.
GENERAL STANDARDS
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 6p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Si te Pl an .d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
GENERAL NOTES
PRECISION APPROACH ENGINEERING, INC.
OCT 2025
EMS
JAW
GWV
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
1. AIR-LOCK HOLE: INSTALL A 5/32” DIAMETER HOLE IN DISCHARGE PIPE BELOW OFF LEVEL
AND BELOW CHECK LEVEL.
2. DISCONNECT: PROVIDE A QUICK DISCONNECT OF NON-CORROSIVE MATERIAL WITHIN 12” OF
RISER TOP. POSITION TO ALLOW FOR REMOVAL OF PUMP AND PUMP SCREEN FOR ANNUAL
MAINTENANCE.
3. DISCONNECT: PROVIDE A QUICK DISCONNECT OF NON-CORROSIVE MATERIAL WITHIN 12” OF
RISER TOP. POSITION TO ALLOW FOR REMOVAL OF PUMP FOR ANNUAL MAINTENANCE.
4. ISOLATE VALVE: PROVIDE A GATE OR BALL VALVE WITHIN 12” OF RISER TOP, ON DISCHARGE
SIDE OF DISCONNECT. POSITION TO ALLOW FOR REMOVAL OF PUMP FOR ANNUAL
MAINTENANCE.
5. CHECK VALVE: PROVIDE CHECK VALVE BEFORE THE DISCONNECT AND ISOLATE VALVE IN
THE PUMP CHAMBER DISCHARGE ASSEMBLY.
6. CHECK VALVE: PROVIDE CHECK VALVE BEFORE THE DISCONNECT AND ISOLATE VALVE IN
THE DOSING TANK DISCHARGE ASSEMBLY.
7. ANTI-SIPHON: PROVIDE ANTI-SIPHON BEFORE THE DISCONNECT AND ISOLATE VALVE IN THE
PUMP CHAMBER DISCHARGE ASSEMBLY.
8. ANTI-SIPHON: PROVIDE ANTI-SIPHON BEFORE THE DISCONNECT AND ISOLATE VALVE.
9. DOSE/CYCLE: DESIGN ON/OFF SETTINGS TO DELIVER A MAXIMUM OF 10 % OF DAILY FLOW
TO DRIPFIELD DURING ONE CYCLE. TEST PRIOR TO CALLING FOR INSPECTION.
10.FLUSH TRANSPORT PIPE AND CHECK FOR EQUAL DISTRIBUTION FROM SPLITTERS, VALVES,
AND/OR DISTRIBUTION BOX.
11. VAULT LIFTING DEVICE: PROVIDE NON-CORROSIVE, NON-BIODEGRADABLE LIFTING DEVICES
CONNECTED TO PUMP TO REMOVE IT FOR SERVICE. SECURE DEVICE TO PREVENT
INTERFERENCE WITH PUMP AND CONTROLS.
12.FLOAT AND CONTROLS ASSEMBLY: FLOAT CONTROLS MUST BE CONNECTED TO A
SEPARATE STAND PIPE, NOT DISCHARGE LINE, WHICH IS SERVICEABLE AND ACCESSIBLE.
13.PUMP SCREEN: PROVIDE A CORROSION-RESISTANT SCREEN WITH MINIMUM TWO SQ. FT.
SURFACE AREA, WITH MAXIMUM 1/8” OPENINGS, SURROUNDING PUMP EXTENDING ABOVE
MAXIMUM PUMP LEVEL.
14.PUMP PULL ROPE: PROVIDE NON-CORROSIVE, NON-BIODEGRADABLE LIFTING DEVICE
CONNECTED TO PUMPS TO REMOVE THEM FOR SERVICE. SECURE DEVICE TO PREVENT
INTERFERENCE WITH PUMPS AND CONTROLS.
1. THE ELECTRICIAN SHALL LABEL THE CONTROL PANEL OR ELECTRICAL PANEL WITH HIS
BUSINESS NAME & THE PERMIT NUMBER AND DATE OF INSTALLATION.
2. CONTROL PANEL SHALL BE INSTALLED PER MANUFACTURER WRITTEN INSTRUCTIONS;
ALARM SHALL BE AUDIBLE FROM THE LIVING/WORKING SPACE. PUMP AND ALARM MUST BE
ON SEPARATE CIRCUITS.
3. THE CONTROL PANEL FOR ALL PUMPS MUST HAVE THE CAPABILITY TO RECORD THE
NUMBER OF ALARMS, PUMP EVENTS AND OVERRIDE EVENTS, IF APPLICABLE.
4. USE A PADLOCK OR OTHER LOCKING DEVICE TO PREVENT UNAUTHORIZED ACCESS TO THE
CONTROL PANEL. PANEL TO BE INSTALLED INSIDE ADJACENT TURF-SHED SHELTER AS
SHOWN ON THE PLANS.
5. PANEL SHALL BE INSTALLED WITH NEMA 4X RATING. PANEL ENCLOSURE SHALL MEET NEMA
4X REQUIREMENTS.
6. PANEL SHALL BE INSTALLED WITHIN 50’ OF TANK AND PREFERABLY WITHIN SIGHT OF TANK.
1. SEAL ALL JOINTS AND SEAMS WITH MANUFACTURER-APPROVED SEALANTS. PROVIDE
MATERIAL SUBMITTAL, AND ALL MEANS AND METHODS FOR TANK AND ACCESSORY
TESTING
2. ODOR PROOF; SEAL RISER LID TO CONTACT WITH CLOSED CELL PLASTIC FOAM SHEET, OR
SINGLE-SIDE ADHESIVE NEOPRENE FOAM TAPE.
3. GREASE INTERCEPTOR TANK (G1) MUST BE TRAFFIC RATED.
4. GREASE INTERCEPTOR (G1) MUST BE FITTED WITH MANHOLE COVERS IN FRAMES SET IN
PAVEMENT ABOVE THE TANK RISERS.
5. RISERS: TANKS MUST BE EQUIPPED WITH ONE PIECE WATERTIGHT RISERS, WITH MINIMUM
30” INSIDE DIAMETER, WITH TANK ACCESS BROUGHT TO 3” ABOVE FINISH GRADE. JOINTS
MUST BE SEALED INTERIOR AND EXTERIOR, AND PRESSURE TESTED PER PLANS. (SEE
ATTACHED "TANK INSPECTION AND TESTING" NOTES)
6. RISER: TANK MUST BE EQUIPPED WITH A WATERTIGHT RISER, WITH MINIMUM 18” INSIDE
DIAMETER, WITH TANK ACCESS BROUGHT TO OR ABOVE FINISH GRADE. RISER MUST BE
FIBERGLASS BONDED TO TANK ADAPTER W/ ADHESIVE.
7. KNOCKOUTS: PERFORATIONS AND UNUSED KNOCKOUTS MUST BE GROUTED OR
OTHERWISE SEALED.
8. WATERTIGHT: AFTER INSTALLATION, TANK MUST BE SUBJECT TO 24 HOUR TEST FOR
WATERTIGHTNESS. FILL TO A MAXIMUM 2” INTO RISER. MARK WATER LEVEL, TIME AND
DATE. THERE MAY BE NO MORE THAN 1 GALLON LEAKAGE OVER 24 HOUR PERIOD.
9. THE ABOVE SPECIFICATIONS ARE IN ADDITION TO AND DO NOT REPLACE THE
MANUFACTURER’S WRITTEN INSTALLATION AND TESTING PROCEDURE REQUIREMENTS.
10. ANTI-BUOYANCY: PROVIDE FOR ANTI-BUOYANCY, PER MANUFACTURER’S INSTALLATION
INSTRUCTIONS. PROVIDE COPY OF INSTRUCTIONS TO PERMITTING AUTHORITY. (FRP
TANKS ONLY)
11.HOSE BIBS TO BE INSTALLED WITHIN 100’ OF ANY TANK FITTED WITH AN EFFLUENT FILTER
OR PUMP SYSTEM.
TANK (S) CONTROL PANEL (S)
PIPE (S)
1. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE NEC AND OESC
WITH REQUIRED PERMITS AND INSPECTIONS.
2. ALL WIRING FOR PUMPS AND CONTROLS SHALL BE XHHW-2 UNLESS OTHERWISE
APPROVED BY ENGINEER
3. ALL INDOOR CONDUIT SHALL BE EMT WITH COMPRESSION FITTINGS; OUTDOOR AND BURIED
CONDUIT SHALL BE PVC.
4. ELECTRICAL BRANCH CIRCUIT TO EACH PUMP CONTROL SHALL BE 240V 30A SINGLE-PHASE.
WIRE SHALL BE (4) #10 CU XHHW-2.
5. INSTALL 30A 2-POLE BREAKER IN EXISTING ELECTRICAL PANELS AS DESIGNATED BY
OWNER. REARRANGE AND RELOCATE EXISTING BREAKERS AS NEEDED TO ACCOMMODATE
NEW 2-POLE BREAKER. BREAKER TO MATCH EXISTING IN PANEL.
6. WHERE THERE IS INADEQUATE AVAILABLE SPACE FOR A NEW 2-POLE BREAKER, INSTALL
SUFFICIENT NEW TANDEM BREAKERS TO REPLACE EXISTING SINGLE-POLE BREAKERS AND
RECONFIGURE CIRCUITS TO FREE UP THE REQUIRED SPACE.
7. RUN BRANCH CIRCUIT FROM ELECTRICAL PANEL TO PUMP CONTROL PANEL. TERMINATE AT
CONTROL PANEL AS REQUIRED BY MANUFACTURER.
8. PROVIDE WIRING FROM CONTROL PANEL TO PUMPS AS REQUIRED BY MANUFACTURER.
PUMPS ARE 3/4HP, 230VAC SINGLE-PHASE, 7A.
9. USE WIRING #12AWG OR LARGER FOR PUMPS, #14AWG OR LARGER FOR CONTROL
DEVICES.
10.PROVIDE WIRING FROM CONTROL PANEL TO FLOATS AS REQUIRED BY CONTROL PANEL
MANUFACTURER.
11. AT FINAL TREATMENT SYSTEM, PROVIDE TWO STEEL POSTS, EMBEDDED IN CONCRETE
FOOTINGS, WITH UNISTRUT SPANNING BETWEEN THEM TO SUPPORT PUMP CONTROL
ENCLOSURE.
12.USE FLEXIBLE WATERPROOF CONDUIT WHERE REQUIRED TO ACCOMMODATE EXPANSION
AND TO ALLOW FOR REMOVAL AND INSTALLATION OF EQUIPMENT.
ELECTRICAL COMPONENTS
1. ABANDON TANK: EXISTING SEPTIC TANKS MUST BE PUMPED, CRUSHED, AND BACK
FILLED WITH ROCK IN ACCORDANCE WITH COUNTY AND STATE OF OREGON
REQUIREMENTS. SUBMIT CERTIFICATE OF ABANDONMENT AND PUMP RECEIPT.
2. SETBACKS: MAINTAIN REQUIRED SETBACKS
3. INITIAL AND RESERVE DRAINFIELD AREAS AND SYSTEM COMPONENTS TO BE
PROTECTED WITH CONSTRUCTION FENCING, BOLLARDS, OR OTHER DEVICES
BEFORE, DURING, AND AFTER SEPTIC SYSTEM INSTALLATION.
OTHER
1. ALL PVC PIPE AND FITTINGS SHALL BE PVC SCHEDULE 40 TYPE 1 RATED FOR
PRESSURE APPLICATIONS. ALL GLUED JOINTS SHALL BE CLEANED AND PRIMED
WITH PURPLE (DYED) PVC PRIMER PRIOR TO BEING GLUED.
2. ALL CUTTING OF PVC PIPE, FLEXIBLE PVC AND DRIPPER TUBING SHALL BE
ACCOMPLISHED WITH PIPE CUTTERS APPROVED BY MANUFACTURER. NO SAWING
OF PVC, PVC FLEXIBLE OR DRIPPER TUBING ALLOWED.
3. NO WET WEATHER INSTALLATION IS PERMITTED.
4. NO ACTIVITY ON DRIP FIELD AREA OTHER THAN MINIMUM REQUIRED TO INSTALL
SYSTEM. DO NOT PARK EQUIPMENT, DRIVE LARGE EQUIPMENT OVER, OR STORE
MATERIALS ON DRIP FIELD SITE.
5. HORIZONTAL SPACING BETWEEN DRIPPER LINES AND THE INSTALLATION DEPTH
SHALL BE AS SPECIFIED IN APPROVED DESIGN.
6. AN AIR RELEASE VALVE SHALL BE PLACED AT THE HIGHEST POINT IN THE RETURN
LINE OF EACH ZONE.
7. DRIP FIELD SUPPLY AND RETURN LINES TO BE INSTALLED PER PLAN DEPTH TO
PREVENT FREEZING.
8. REMOVE ALL EXISTING UNDERGROUND UTILITIES AND REROUTE AROUND DRIP
FIELD AREA.
SUBSURFACE DRIP SYSTEM
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 6p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Si te Pl an .d w g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
CONSTRUCTION NOTES
PRECISION APPROACH ENGINEERING, INC.
OCT 2025
EMS
JAW
GWV
13.WIRING OF PUMPS AND CONTROLS SHALL BE PERFORMED BY A LICENSED ELECTRICIAN
UNDER THE AUSPICES OF AN ELECTRICAL PERMIT SECURED FROM THE LOCAL
JURISDICTION.
14.FOR DETAILS OF ELECTRICAL SYSTEM, PUMP CONTROLS, FLOATS, AND THE LEVEL OF THE
FLOAT SETTINGS SEE THE SYSTEM DESIGNER.
15.SPLICING OF WIRES AT THE SPLICE BOX INSIDE THE TANK RISERS SHALL BE DONE USING
THE HEAT SHRINK CONNECTORS PROVIDED BY THE MANUFACTURER OR WITH AN
APPROVED WATERTIGHT ELECTRICAL CONNECTOR NUT.
16.WIRING FROM THE SPLICE BOX TO THE SOURCE OR THE CONTROL PANEL SHALL BE
PROTECTED IN UL APPROVED PVC CONDUIT, CONSTRUCTED WATERTIGHT.
17.PUMP LINE VOLTAGE SHALL HAVE WATER PROOF INSULATION SUCH AS XHHW-2 WIRE FOR
ALL CONNECTIONS SHALL BE 14 GAUGE WIRE OR LARGER.
18.“SEAL OFFS” SHALL BE INSTALLED BETWEEN THE SPLICE BOX AND THE POWER SOURCE OR
CONTROL PANEL, EITHER IN THE HORIZONTAL JUST OUTSIDE THE RISER OR IN THE
VERTICAL JUST BELOW THE CONTROL PANEL OR PER CONNECTION. “SEAL OFFS” SHALL BE
INSTALLED PER MANUFACTURERS WRITTEN RECOMMENDATIONS AND SHALL BE EQUAL TO
OR BETTER THAN THE FOLLOWING: APPLETON EYF SEAL OFF BOX WITH PVC TERMINAL
ADAPTERS (THREADED), KILLARK SEALING COMPOUND, KILLARK PACKING FIBER.
19.WIRING SHALL BE COLOR CODED OR NUMBERED AND THE SCHEDULE WRITTEN INSIDE THE
CONTROL PANEL OR ON THE WIRING DIAGRAM.
20.UPON COMPLETION, THE APPARATUS SHALL BE TESTED FOR OPERATION AND
CORRECTNESS. AVAILABLE VOLTAGE, PUMP RUN VOLTAGE AND PUMP RUN AMPERAGE
SHALL BE MEASURED AND RECORDED INSIDE THE CONTROL PANEL.
21.THE WIRING DIAGRAM SHALL BE RETAINED ON SITE (PREFERABLY IN CONTROL PANEL
ENCLOSURE) AND ANY AS-BUILT NOTES OR COMMENTS ENTERED, INITIALED, AND DATED.
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
SD
SD
SD
S
D
SD
SD
SD
SD
W
T
T
TAXIWAY A
TA
XI
W
AY
C
TW
B
T/ W
D
TAXIW
AY E
HIGHWAY 101
PAPI
PAPI
FIRE STATION
WIND CONE
AIRPORT TERMINAL
BUILDING FBO
UNITED STATES
COAST GUARD STATION
RUNWAY 2-20
RUNWAY 16-34
TAXIWAY E
LOCALIZER
VORTAC
ELECTRICAL EQUIPMENT
BUILDING (EEB)
GLIDE SLOPE ANTENNA
TW
C
AWOS
CONTRACTOR
STAGING AREA
CONTRACTOR'S
HAUL ROUTE
ACCESS GATE, COORDINATE
ACCESS WITH RPR PRIOR TO
CONSTRUCTION
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W
W
W
W
W
W
P
SS
SS
SS
NEW SEPTIC
SEWER SYSTEM
NEW TANK
FARM AREA
NEW GEOFLOW
DRIPFIELD
FEDEX
digsafelyoregon.com
CALL 48 HOURS BEFORE YOU DIG
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 6p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Si te Pl an .d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
SITE PLAN
PRECISION APPROACH ENGINEERING, INC.
OCT 2025
EMS
JAW
GWV
SCALE IN FEET
250 500
N O
R T H
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
LOCALIZER
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
SD
SD
SD
SD
SD
W
T
T
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSS
SSSSSSSSSS
SSSSSSSS
SS
SSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W
W
W
W
SS
SS
P
P
P
PP
P
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
N O
R
TH
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 7p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Bi d- Sc h.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
BID SCHEDULE LIMITS
PRECISION APPROACH ENGINEERING, INC.
OCT 2025
EMS
JAW
GWV
PIPE/CONDUIT INSTALLATION (BASE BID)
FBO AREA (BASE BID), SEE NOTE 1
FEDEX AREA (BASE BID), SEE NOTE 2
FINAL TREATMENT AREA (BASE BID), SEE NOTE 3
COAST GUARD AREA (ADDITIVE BID A), SEE NOTE 4
PIPE INSTALLATION (ADDITIVE BID A)
PIPE INSTALLATION (ADDITIVE BID B)
LEGEND
SCALE IN FEET
8040 160
1. ALL WORK WITHIN FBO AREA SHALL BE PAID UNDER THE FOLLOWING ITEMS: FBO SEPTIC
IMPROVEMENTS, PAVEMENT REMOVAL AND REPAIR, MISCELLANEOUS ELECTRICAL
IMPROVEMENTS - FBO, AND HYDROSEEDING.
2. ALL WORK WITHIN FEDEX AREA SHALL BE PAID UNDER THE FOLLOWING BID ITEMS: FEDEX
SEPTIC IMPROVEMENTS, PAVEMENT REMOVAL AND REPAIR, MISCELLANEOUS ELECTRICAL
IMPROVEMENTS - FEDEX, AND HYDROSEEDING.
3. ALL WORK WITHIN FINAL TREATMENT AREA SHALL BE PAID UNDER THE FOLLOWING BID ITEMS:
FINAL TREATMENT IMPROVEMENTS, MISCELLANEOUS ELECTRICAL IMPROVEMENTS - FINAL
TREATMENT, AND HYDROSEEDING.
4. ALL WORK WITHIN COAST GUARD AREA SHALL BE PAID UNDER THE FOLLOWING ITEMS: COAST
GUARD SEPTIC IMPROVEMENTS, PAVEMENT REMOVAL AND REPAIR, MISCELLANEOUS
ELECTRICAL IMPROVEMENTS - COAST GUARD SEPTIC, AND HYDROSEEDING.
NOTES
FBO BUILDING
FEDEX
BUILDING
COAST GUARD BUILDING
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text D
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
VASI LIGHTS
AutoCAD SHX Text
ACCESS RAMP
AutoCAD SHX Text
ADA RAMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
W
T
T
0'
0'
300'
RUNWAY 16-34 RUNWAY
OBJECT FREE AREA (ROFA)
RUNWAY 16-34 RUNWAY
SAFETY AREA (RSA)
0'
0'
300'
TAXIWAY SAFETY AREA (TSA),
TYPICAL ALL TAXIWAYS
79'
RUNWAY 16-34
RUNWAY 2-20
0'
0'
TAXIWAY A
TAXIWAY E
TAXIW
AY E
TA
XI
W
AY
C
TA
XI
W
AY
D
TWY A TAXIWAY B
N O
R T H
0 100 200 400
SCALE IN FEET
RSA TO STRUCTURAL EDGE
OF PAVEMENT (SEOP)
ROFA TO STRUCTURAL EDGE
OF PAVEMENT (SEOP)
PAVEMENT WIDTH
RSA WIDTH
ROFA WIDTH
STRUCTURAL EDGE OF PAVEMENT
DEFINED BY OUTSIDE OF EDGE STRIPE
OR EDGE OF PAVEMENT
CRITICAL AREA DETAIL 1
7NTS
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 7p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- C rit ic al Ar ea .d w g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
CONSTRUCTION SAFETY AND PHASING
PLAN - CRITICAL AREAS
PRECISION APPROACH ENGINEERING, INC.
AIG NO. 3-41-0040-0XX-20XX
OCT 2025
EMS
JAW
GWV
NOTES
1. ACRONYMS:
RSA RUNWAY SAFETY AREA
ROFA RUNWAY OBJECT FREE AREA
TSA TAXIWAY/TAXILANE SAFETY AREA
TOFA TAXIWAY/TAXILANE OBJECT FREE AREA
SEOP STRUCTURAL EDGE OF PAVEMENT
2. SEE CRITICAL AREA DETAIL FOR DEFINITION OF WIDTHS1
CRITICAL AREA DIMENSIONS TABLE
LENGTH BEYOND RUNWAY END
AREAS PAVEMENT
WIDTH
RSA/TSA
WIDTH
RSA/TSA
TO SEOP
OFA/TOFA
WIDTH
OFA/TOFA
TO SEOP OFZ WIDTH OFZ TO
SEOP RSA OFA OFZ
RWY 16-34 100' 150' 25' 500' 200' 400' 150' 300' 300' 200'
RWY 2-20 720 150' 45' 500' 220' 400' 170' 300' 300' 200'
TAXIWAY A 35' 79' 22' 131' 48'
TAXIWAY B 600 79' 14.5' 131' 40.5
TAXIWAY C 35' - 50' 79' 14.5'-22' 131' 40.5'-48'
TAXIWAY D 35' 79' 22' 131' 48'
TAXIWAY E 50' 79' 14.5' 131' 40.5'
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
LOCALIZER
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
T
SECURITY FENCE, TYP
UNITED STATES
COAST GUARD
PAPI
LOCALIZER
REIL
SECURITY FENCE
AUTOMATED VEHICLE GATE
CONTRACTOR'S ACCESS
TERMINAL BUILDING (FBO)
RUNWAY 16-34
TAXIWAY E
T/ W
D
HIGHWAY 101
TAXIW
AY E
84TH ST
CONTRACTOR'S STAGING AREA
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
P
P
P
SS
SS
SS
SS
SS
SS
GENERAL AVIATION APRON
PHASE 1 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· DRIP FIELD INSTALLATION
· TANK FARM INSTALLATION
· FORCE MAIN INSTALLATION
· DRY LINE INSTALLATION
· ELECTRICAL IMPROVEMENTS
SEE NOTE 3 AND 4
FEDEX
RUNWAY 2-20
TAXIWAY A
BASE BID
ADDITIVE BID B
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 7p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Ph as in g.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
CONSTRUCTION SAFETY AND
PHASING PLAN - PHASE 1
PRECISION APPROACH ENGINEERING, INC.
AIG NO. 3-41-0040-0XX-20XX
OCT 2025
EMS
JAW
GWV
LANCE VANDERBECK OFFICE: (541) 867-7422
CELL: (541) 530-1364
24-HOUR EMERGENCY CONTACT
N O
R
TH
SCALE IN FEET
150 300
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT, UNLESS OTHERWISE NOTED.
PHASE
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 2, SHEET 11
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
ALLOWABLE DAILY WORK
PERIOD, (LOCAL TIME),
SEE NOTE A
WORK ELEMENTS TO COINCIDE WITH AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. IF THE CONTRACTOR FAILS TO COMPLETE THE PHASE WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
NONE
NONE
NONE
07:00-19:00
07:00-19:00
07:00-19:00
30 LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN
GENERAL NOTE 7, SHEET 11
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN
GENERAL NOTE 7, SHEET 11
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 11, FOR
ADDITIONAL REQUIREMENTS.
2. IF NECESSARY, CONTRACTOR TO PLACE LOW PROFILE BARRICADES
AND/OR CONES AT TRAFFIC ACCESS POINTS AND PROVIDE OTHER
TRAFFIC DELINEATION AS DIRECTED BY THE ENGINEER.
3. CONTRACTOR ACCESS TO WORK AREA REQUIRES CROSSING
ACTIVE TAXILANES. CONTRACTOR MUST HAVE APPROVAL FROM THE
OWNER PRIOR TO ANY VEHICLES ENTERING ACTIVE AREAS.
4. PERSONNEL OR VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS
MUST HAVE A WORKING TWO-WAY RADIO, BE UNDER THE DIRECTION
OF CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A
VEHICLE WITH A RADIO.
5. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT
DEBRIS (FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED
ONTO ACTIVE AREAS SHALL BE REMOVED IMMEDIATELY BY THE
CONTRACTOR.
6. WHEN THE CONTRACTOR AND/OR ANY OF ITS SUBCONTRACTORS,
SUPPLIERS, OR AGENTS ARE ON AN TAXILANE, EVEN IF
TEMPORARILY CLOSED, THEY SHALL YIELD RIGHT OF WAY TO
AIRCRAFT AT ALL TIMES. ANY PERSON OR VEHICLE TRANSITING THE
TAXILANE SHALL YIELD BY STOPPING IN PLACE AND WAITING FOR
THE AIRCRAFT TO PASS OR MAKE ITS INTENTIONS KNOWN PRIOR TO
PROCEEDING.
NOTES
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
LOCALIZER
AutoCAD SHX Text D
AutoCAD SHX Text
VASI LIGHTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
T
SECURITY FENCE, TYP
UNITED STATES
COAST GUARD
PAPI
LOCALIZER
REIL
SECURITY FENCE
AUTOMATED VEHICLE GATE
CONTRACTOR'S ACCESS
TERMINAL BUILDING (FBO)
RUNWAY 16-34
TAXIWAY E
T/ W
D
HIGHWAY 101
TAXIW
AY E
84TH ST
CONTRACTOR'S STAGING AREA
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W
W
W
W
W
W
SS
P
P
P
SS
SS
SS
SS
SS
SS
GENERAL AVIATION APRON
PHASE 2 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· FORCE MAIN INSTALLATION
· DRY LINE INSTALLATION
· TANK INSTALLATION (ADDITIVE)
· ELECTRICAL IMPROVEMENTS (ADDITIVE)
SEE NOTE 3 AND 4
FEDEX
RUNWAY 2-20
TAXIWAY A
BASE BID
ADDITIVE BID A
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 7p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Ph as in g.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
CONSTRUCTION SAFETY AND
PHASING PLAN - PHASE 2
PRECISION APPROACH ENGINEERING, INC.
AIG NO. 3-41-0040-0XX-20XX
OCT 2025
EMS
JAW
GWV
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT, UNLESS OTHERWISE NOTED.
PHASE
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 2, SHEET 11
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
ALLOWABLE DAILY WORK
PERIOD, (LOCAL TIME),
SEE NOTE A
WORK ELEMENTS TO COINCIDE WITH AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. IF THE CONTRACTOR FAILS TO COMPLETE THE PHASE WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
NONE
NONE
NONE
07:00-19:00
07:00-19:00
07:00-19:00
30 LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN
GENERAL NOTE 7, SHEET 11
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN
GENERAL NOTE 7, SHEET 11
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 11, FOR
ADDITIONAL REQUIREMENTS.
2. IF NECESSARY, CONTRACTOR TO PLACE LOW PROFILE BARRICADES
AND/OR CONES AT TRAFFIC ACCESS POINTS AND PROVIDE OTHER
TRAFFIC DELINEATION AS DIRECTED BY THE ENGINEER.
3. CONTRACTOR ACCESS TO WORK AREA REQUIRES CROSSING
ACTIVE TAXILANES. CONTRACTOR MUST HAVE APPROVAL FROM THE
OWNER PRIOR TO ANY VEHICLES ENTERING ACTIVE AREAS.
4. PERSONNEL OR VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS
MUST HAVE A WORKING TWO-WAY RADIO, BE UNDER THE DIRECTION
OF CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A
VEHICLE WITH A RADIO.
5. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT
DEBRIS (FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED
ONTO ACTIVE AREAS SHALL BE REMOVED IMMEDIATELY BY THE
CONTRACTOR.
6. WHEN THE CONTRACTOR AND/OR ANY OF ITS SUBCONTRACTORS,
SUPPLIERS, OR AGENTS ARE ON AN TAXILANE, EVEN IF
TEMPORARILY CLOSED, THEY SHALL YIELD RIGHT OF WAY TO
AIRCRAFT AT ALL TIMES. ANY PERSON OR VEHICLE TRANSITING THE
TAXILANE SHALL YIELD BY STOPPING IN PLACE AND WAITING FOR
THE AIRCRAFT TO PASS OR MAKE ITS INTENTIONS KNOWN PRIOR TO
PROCEEDING.
NOTES
LANCE VANDERBECK OFFICE: (541) 867-7422
CELL: (541) 530-1364
24-HOUR EMERGENCY CONTACT
N O
R
TH
SCALE IN FEET
150 300
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
LOCALIZER
AutoCAD SHX Text D
AutoCAD SHX Text
VASI LIGHTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
T
SECURITY FENCE, TYP
UNITED STATES
COAST GUARD
PAPI
LOCALIZER
REIL
SECURITY FENCE
AUTOMATED VEHICLE GATE
CONTRACTOR'S ACCESS
TERMINAL BUILDING (FBO)
RUNWAY 16-34
TAXIWAY E
T/ W
D
HIGHWAY 101
TAXIW
AY E
84TH ST
CONTRACTOR'S STAGING AREA
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W
W
W
W
W
W
SS
P
P
P
SS
SS
SS
SS
SS
SS
GENERAL AVIATION APRON
PHASE 3 APPROXIMATE WORK LIMITS
WORK DURING THIS PHASE TO INCLUDE:
· FORCE MAIN INSTALLATION
· TANK INSTALLATION
· ELECTRICAL IMPROVEMENTS
SEE NOTE 3 AND 4
FEDEX
RUNWAY 2-20
TAXIWAY A
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 7p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Ph as in g.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
CONSTRUCTION SAFETY AND
PHASING PLAN - PHASE 3
PRECISION APPROACH ENGINEERING, INC.
AIG NO. 3-41-0040-0XX-20XX
OCT 2025
EMS
JAW
GWV
ALL ELEMENTS OF WORK TO BE COMPLETED WITHIN THE TOTAL PROJECT CALENDAR DAY COUNT, UNLESS OTHERWISE NOTED.
PHASE
AIR OPERATIONS AREA (AOA) IMPACT,
SEE GENERAL NOTE 2, SHEET 11
MAXIMUM NUMBER OF
CALENDAR DAYS
ALLOWED, SEE NOTE B
ALLOWABLE DAILY WORK
PERIOD, (LOCAL TIME),
SEE NOTE A
WORK ELEMENTS TO COINCIDE WITH AREAS IDENTIFIED IN CONSTRUCTION PLANS
PROJECT CONSTRUCTION TIME
NOTES:
A. UNLESS OTHERWISE APPROVED BY THE ENGINEER.
B. IF THE CONTRACTOR FAILS TO COMPLETE THE PHASE WITHIN THE SPECIFIED TIME PERIOD, LIQUIDATED
DAMAGES WILL BE ASSESSED. SEE SPECIFICATIONS.
NONE
NONE
NONE
07:00-19:00
07:00-19:00
07:00-19:00
30 LEGEND
AIRCRAFT OPERATIONS, SEE CONSTRUCTION PLAN
GENERAL NOTE 7, SHEET 11
CONSTRUCTION TRAFFIC, SEE CONSTRUCTION PLAN
GENERAL NOTE 7, SHEET 11
1. SEE CONSTRUCTION PLAN GENERAL NOTES, SHEET 11, FOR
ADDITIONAL REQUIREMENTS.
2. IF NECESSARY, CONTRACTOR TO PLACE LOW PROFILE BARRICADES
AND/OR CONES AT TRAFFIC ACCESS POINTS AND PROVIDE OTHER
TRAFFIC DELINEATION AS DIRECTED BY THE ENGINEER.
3. CONTRACTOR ACCESS TO WORK AREA REQUIRES CROSSING
ACTIVE TAXILANES. CONTRACTOR MUST HAVE APPROVAL FROM THE
OWNER PRIOR TO ANY VEHICLES ENTERING ACTIVE AREAS.
4. PERSONNEL OR VEHICLES LOCATED IN OR CROSSING ACTIVE AREAS
MUST HAVE A WORKING TWO-WAY RADIO, BE UNDER THE DIRECTION
OF CONTRACTOR FURNISHED FLAGGERS, OR BE ESCORTED BY A
VEHICLE WITH A RADIO.
5. CONTRACTOR SHALL NOT LEAVE OR PLACE FOREIGN OBJECT
DEBRIS (FOD) ON OR NEAR ACTIVE AREAS. MATERIALS TRACKED
ONTO ACTIVE AREAS SHALL BE REMOVED IMMEDIATELY BY THE
CONTRACTOR.
6. WHEN THE CONTRACTOR AND/OR ANY OF ITS SUBCONTRACTORS,
SUPPLIERS, OR AGENTS ARE ON AN TAXILANE, EVEN IF
TEMPORARILY CLOSED, THEY SHALL YIELD RIGHT OF WAY TO
AIRCRAFT AT ALL TIMES. ANY PERSON OR VEHICLE TRANSITING THE
TAXILANE SHALL YIELD BY STOPPING IN PLACE AND WAITING FOR
THE AIRCRAFT TO PASS OR MAKE ITS INTENTIONS KNOWN PRIOR TO
PROCEEDING.
NOTES
LANCE VANDERBECK OFFICE: (541) 867-7422
CELL: (541) 530-1364
24-HOUR EMERGENCY CONTACT
N O
R
TH
SCALE IN FEET
150 300
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
LOCALIZER
AutoCAD SHX Text D
AutoCAD SHX Text
VASI LIGHTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 7p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5- Ph as in g.
dw g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
CONSTRUCTION SAFETY AND
PHASING PLAN - NOTES AND DETAILS
PRECISION APPROACH ENGINEERING, INC.
AIG NO. 3-41-0040-0XX-20XX
OCT 2025
EMS
JAW
GWV
SIDE VIEW
TOP VIEW
96"
NOTES:
1. PROVIDE BARRICADE CAPABLE OF BEING FILLED WITH WATER. IF ALTERNATE METHOD
OF ANCHORING IS USED IT SHALL NOT CAUSE DAMAGE TO PAVEMENT.
2. BARRICADE TO BE CAPABLE OF BEING DEPLOYED BY ONE PERSON WHEN EMPTY.
3. CONTRACTOR SHALL MAINTAIN ALL LIGHTS IN WORKING ORDER FOR THE DURATION OF
THE PROJECT. CONTRACTOR SHALL REPLACE FLAGS AS NECESSARY OR AS DIRECTED
BY THE RPR DUE TO DETERIORATION.
4. BARRICADES TO BE PROVIDED BY THE CONTRACTOR ARE INCIDENTAL TO THE
MOBILIZATION BID ITEM AND ARE PROPERTY OF THE CONTRACTOR UPON COMPLETION
OF THE PROJECT.
RED
FLASHING
LIGHT, TYP
ORANGE
FLAG
MA
X
PORTABLE PLASTIC BARRICADE DETAIL 1
11NTS
CONSTRUCTION PLAN GENERAL NOTES
1. EXCEPT FOR CLOSURES NOTED, AIRPORT AND AIR OPERATIONS AREAS (AOAS) TO REMAIN OPEN TO AIRCRAFT OPERATIONS
DURING ENTIRE COURSE OF WORK. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. CONTRACTOR SHALL COORDINATE WORK TO ASSURE MINIMUM INCONVENIENCE TO AIRPORT OPERATIONS. IN ALL CIRCUMSTANCES SAFETY
SHALL TAKE PRECEDENCE.
2. WORK WITHIN THE TAXIWAY OBJECT FREE AREA (TOFA) OR TAXILANE OBJECT FREE AREA (TLOFA) WILL REQUIRE CLOSURE OF IMPACTED TAXIWAY / TAXILANE. PROJECT DOES NOT INCLUDE WORK WITHIN THE RUNWAY OBJECT FREE AREA (ROFA), RUNWAY OBSTACLE FREE ZONE (ROFZ) OR RUNWAY SAFETY AREA (RSA). SEE AIRFIELD CRITICAL AREAS DRAWING FOR
LIMITS.
3. THE CONTRACTOR SHALL PROVIDE SUFFICIENT LEAD TIME FOR REQUIRED NOTIFICATIONS WITH PROJECT STAKEHOLDERS AND THE FEDERAL AVIATION ADMINISTRATION (FAA). THIS WILL REQUIRE SUBMITTAL OF A PRELIMINARY SCHEDULE TO INCLUDE START DATES FOR INDIVIDUAL PHASES AND DATES FOR AIRPORT FACILITIES IMPACTS WITHIN 15 CALENDAR DAYS AFTER EXECUTION OF THE CONSTRUCTION CONTRACT. A REVISED "CONSTRUCTION SCHEDULE" WILL BE PREPARED IN CONJUNCTION WITH THE PRE-CONSTRUCTION MEETING. THE CONTRACTOR SHALL NOTIFY THE OWNER WITH REQUESTS FOR NOTICES TO AIRMEN (NOTAMS) 48 HOURS PRIOR TO IMPLEMENTATION. CONTRACTOR SHALL COORDINATE WITH RESIDENT PROJECT REPRESENTATIVE (RPR) FOR CONSTRUCTION RELATED AOA CLOSURES. CLOSURES ARE SUBJECT TO
APPROVAL BY THE OWNER.
4. CONTRACTOR SHALL DELINEATE LOCATION OF THE ROFZ, TOFA, AND TLOFA AT TRAFFIC ACCESS POINTS, AND PROVIDE OTHER FIELD DELINEATION TO SEPARATE CONSTRUCTION ACTIVITIES FROM AIRPORT OPERATIONS AS DIRECTED BY THE RPR. DELINEATION WITHIN THE TLOFA SHALL BE LOW PROFILE AND SHALL NOT PRESENT A HAZARD TO AIRCRAFT. CONES, STAKES, OR OTHER METHODS AS APPROVED BY THE RPR MAY BE USED OUTSIDE THE ROFZ, TOFA, AND TLOFA.
5. BARRICADES, LIGHTS, AND OTHER CONSTRUCTION CONTROL DEVICES FURNISHED, PLACED, AND MAINTAINED BY THE CONTRACTOR SHALL BE PROVIDED AT VARIOUS LOCATIONS, AS NECESSARY TO ADEQUATELY SEPARATE CONSTRUCTION
ACTIVITIES FROM THE AOA.
6. PRIOR TO REOPENING A CLOSED TAXIWAY, APRON, OR TAXILANE FOR OPERATIONS THE CONTRACTOR SHALL PROVIDE ADEQUATE TIME FOR THE RPR OR OWNER TO INSPECT FOR CLEANLINESS AND CONFORMANCE TO REGULATIONS INCLUDING MARKING REQUIREMENTS. THE TIME NEEDED FOR INSPECTION AND POSSIBLE NECESSARY CORRECTIVE ACTION SHALL BE
INCLUDED WITHIN THE ALLOWED CLOSURE PERIOD.
7. WORK AREAS SHOWN IN PHASING PLANS ARE APPROXIMATE. SEE APPROPRIATE DRAWINGS FOR SPECIFIC WORK LIMITS.
CONTRACTOR SHALL COORDINATE ALL WORK ELEMENTS COMPATIBLE WITH INTENDED PHASE UNLESS OTHERWISE APPROVED BY THE RPR OR OWNER. AIRCRAFT OPERATIONS ROUTES SHOWN ARE APPROXIMATE AND ARE NOT LIMITED TO LOCATIONS SHOWN. CONTRACTOR SHALL REMAIN CLEAR OF AIRCRAFT OPERATIONS AT ALL TIMES.
8. CONTRACTOR SHALL NOT BLOCK VEHICLE ACCESS ROADS OR GATES AT ANY TIME.
9. LOCATION OF THE CONTRACTOR'S STAGING AREAS ARE APPROXIMATE. VERIFY LIMITS AND LOCATIONS WITH ENGINEER
PRIOR TO MOBILIZATION.
10. ALL VEHICLES NOT ESSENTIAL FOR CONSTRUCTION, INCLUDING CONTRACTOR-EMPLOYEE VEHICLES SHALL REMAIN OUTSIDE OF AIR OPERATIONS AREA. PARKING SHALL BE CONFINED TO THE CONTRACTOR'S STAGING AREA.
11. ALL PORTIONS OF WORK NOT COVERED BY PAYMENT UNDER A SPECIFIC BID ITEM OR LISTED AS INCIDENTAL TO A BID ITEM
SHALL BE CONSIDERED INCIDENTAL TO THE MOBILIZATION BID ITEM.
12. THE CONTRACTOR SHALL USE AND MONITOR THE AIRPORT'S COMMON TRAFFIC ADVISORY FREQUENCY (CTAF), 122.80 MHZ.
13. THE CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY MEASURES THAT MAY BE REQUIRED BY THE CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION AS NEEDED TO PROVIDE A SAFE ENVIRONMENT FOR AIRCRAFT OPERATIONS AND TO
COMPLY WITH THE PROJECT CONSTRUCTION SAFETY AND PHASING PLAN.
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
SD
SD
SD
SD
SD
SD
SDSD SD SD
SD
W
T
T
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSS
SSSSSSSS
SSSSSSSS
SSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W
W
W
W
W
SS
SS
P
P
P
P
SS
SS
SS
SS
SS
SS
SS
SS
SS
SF
0 50 100 200
SCALE IN FEET
PROJECT NUMBER:
OF
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 8p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5-
ES
C P.
dw g
THIS DRAWING IS INTENDED
TO BE PRINTED IN COLOR.
PRINTING IN BLACK AND
WHITE MAY REDUCE
READABILITY AND ALTER
ENTITY DEFINITION OR
REPRESENTATION.
PRINT IN COLOR
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
EROSION AND SEDIMENT
CONTROL PLAN
PRECISION APPROACH ENGINEERING, INC.
AIG NO. 3-41-0040-0XX-20XX
OCT 2025
EMS
JAW
GWV
N O
R
TH
CW
SILT FENCE, SEE DETAIL
STABILIZED CONSTRUCTION ENTRANCE, SEE DETAIL
CONCRETE WASHOUT, SEE DETAIL
PERMANENT SEEDING
DUST CONTROL
DIRECTION OF FLOW
LEGEND - STANDARD PRACTICE CODING SYSTEM
CE
DC
PS
CW
SF 1
1. SEED USED FOR HYDROSEEDING COMPOSED OF T-901 MIX
SPECIFICATIONS UNLESS OTHERWISE AUTHORIZED.
2. ADD OTHER BEST MANAGEMENT PRACTICES REQUIRED OR DIRECTED
BY THE RPR, OR AS OTHERWISE REQUIRED FOR PERMIT COMPLIANCE.
3. EROSION CONTROL ITEMS TO BE PLACED PRIOR TO AND AFTER ANY
LAND-ALTERING ACTIVITY. EROSION CONTROL ITEMS TO BE PLACED
SHALL BE COMPATIBLE WITH PROJECT PHASING AND AS DIRECTED BY
THE RPR.
4. HYDROSEEDING SHALL BE PERFORMED AT THE COMPLETION OF EACH
CONSTRUCTION PHASE, AT THE COMPLETION OF ALL WORK IN EACH
CONSTRUCTION AREA, OR AS DIRECTED BY THE RPR, SEE
SPECIFICATIONS.
5. EROSION CONTROL ITEMS TO BE EFFECTIVELY MAINTAINED UNTIL SITE
HAS BEEN STABILIZED WITH PERMANENT EROSION CONTROL
MEASURES AS DETERMINED BY THE RPR.
6. CONTRACTOR SHALL SWEEP, CLEAN AND MAINTAIN PAVED AREAS AND
HAUL ROUTES TO PREVENT TRACK-OUT ONTO LOCAL ROADS. ALL
CONSTRUCTION ROUTES ON AIRPORT PAVEMENTS WHICH HAVE DUAL
USE WITH AIRCRAFT TRAFFIC SHALL BE PROMPTLY CLEANED AFTER
EACH PASSING.
7. AREAS DISTURBED BY CONSTRUCTION ACTIVITY, INCLUDING STAGING
AND DISPOSAL AREAS, SHALL BE COVERED BY HYDRAULICALLY
APPLIED SEED AND TACKING AGENTS, VERIFY LOCATIONS WITH RPR,
SEE SPECIFICATIONS. PROJECT STAGING AREA SHALL BE SEEDED AT
THE END OF THE PROJECT AT THE CONTRACTOR'S EXPENSE. ANY
AREAS DISTURBED BY THE CONTRACTOR OUTSIDE DESIGNATED
AREAS SHALL BE RESEEDED AT THE CONTRACTOR'S EXPENSE WITH
T-901 HYDROSEEDING.
8. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEASURES THAT MAY BE
REQUIRED BY THE CONTRACTORS MEANS AND METHODS OF
CONSTRUCTION AS NEEDED TO CONTROL EROSION AND SEDIMENT AT
THE CONSTRUCTION SITE AND TO PREVENT VIOLATION OF SURFACE
WATER QUALITY, GROUND WATER QUALITY, OR SEDIMENT
MANAGEMENT STANDARDS AND SHALL COMPLY WITH ALL APPLICABLE
FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES AND STANDARDS.
CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR PERMIT
COMPLIANCE AND APPLICABLE REQUIREMENTS.
9. THE CONTRACTOR SHALL USE APPROVED METHODS TO PREVENT
DUST AND SAND FROM BLOWING INTO AIRPORT OPERATIONS AREAS
(AOA'S) DURING CONSTRUCTION. APPROVED WIND EROSION
MEASURES SHALL BE AVAILABLE DURING THE ENTIRE CONSTRUCTION
PERIOD AND THE CONTRACTOR SHALL BE PREPARED TO IMPLEMENT
MEASURES AS REQUIRED TO MANAGE WIND EROSION. CONTRACTOR
SHALL WATER DISTURBED AREAS SUCH THAT SOIL REMAINS MOIST AT
ALL TIMES. IN ADDITION, ANY DUST AND/OR SAND ON AOA SURFACES
SHALL BE SWEPT, VACUUMED, AND/OR WASHED, TO THE SATISFACTION
OF THE RPR. IF THE RPR REQUESTS DUST CONTROL, THE
CONTRACTOR SHALL COMPLY IMMEDIATELY.
EROSION AND SEDIMENT CONTROL NOTES
R
EENIG
N
E
OREGON
72693PEREG
ISTERED PROFESSIONAL
G
OFF
E
W VAUGHN
EXPIRES 6/30/2026
AutoCAD SHX Text S T R E E T
AutoCAD SHX Text 8 4 T H
AutoCAD SHX Text D
AutoCAD SHX Text
TAXIWAY "E"
AutoCAD SHX Text
TAXIWAY "A"
AutoCAD SHX Text
TAXIWAY "D"
AutoCAD SHX Text
TAXIWAY "E"
AutoCAD SHX Text
COAST GUARD STATION
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
ORIGINAL RUNWAY PAVEMENT
AutoCAD SHX Text
(POOR CONDITION)
AutoCAD SHX Text
ORIGINAL RUNWAY PAVEMENT
AutoCAD SHX Text
(POOR CONDITION)
AutoCAD SHX Text
VASI LIGHTS
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
ACCESS RAMP
AutoCAD SHX Text
ADA RAMP
AutoCAD SHX Text
CONC. WALK
AutoCAD SHX Text
EXISTING ASPHALT
AutoCAD SHX Text
VEHICLE PARKING
AutoCAD SHX Text
MAIN ACCESS ROAD
AutoCAD SHX Text
%%UCODE
AutoCAD SHX Text
%%USYMBOL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text J
SHEET NO.
SCALE:
DESIGN:
REVISION
NUMBER:
CHECKED:
DRAWN:
DATE:
REVISIONS: APPD.DATE
0/
/ 2
- 2
:3 8p m jw ad e
P:
\N
\n pt
5-lo ss
\0
0C
AD
\D W
G \S he et s\ N
PT
5-
ES
C P-
D E.
dw g
APPROACH
E N G I N E E R I N G
PRECISION
5125 Southwest Hout Street Corvallis, OR 97333
541 754 0043
NEWPORT MUNICIPAL AIRPORT
LARGE ONSITE SEPTIC SYSTEM (L.O.S.S.)
EROSION AND SEDIMENT
CONTROL NOTES
PRECISION APPROACH ENGINEERING, INC.
AIG NO. 3-41-0040-0XX-20XX
OCT 2025
EMS
JAW
GWV
1. PRIOR TO START OF WORK, THE CONTRACTOR SHALL SUBMIT SCHEDULES FOR ACCOMPLISHMENT
OF TEMPORARY AND PERMANENT EROSION CONTROL WORK, INCLUDING A PROPOSED METHOD OF
DUST CONTROL AND A PLAN FOR DISPOSAL OF WASTE MATERIALS. SPECIAL ATTENTION IS
BROUGHT TO DUST CONTROL ON ALL CONSTRUCTION AREAS, CONTRACTOR SHALL MAINTAIN
CONTROL OF AIR POLLUTION THROUGHOUT THE DURATION OF THE PROJECT, SEE
SPECIFICATIONS.
2. ALL BASE ESC MEASURES (PERIMETER SEDIMENT CONTROL, GRAVEL CONSTRUCTION ENTRANCES, ETC.) MUST BE IN PLACE, FUNCTIONAL, AND APPROVED IN AN INITIAL INSPECTION, PRIOR TO
COMMENCING OF CONSTRUCTION ACTIVITIES.
3. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE ENTIRE DURATION OF THE PROJECT. ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, STREET SWEEPING AND VACUUMING MAY BE REQUIRED TO ENSURE THAT
ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
4. DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL UPGRADE AND MAINTAIN ALL
EROSION CONTROL FACILITIES AS NEEDED TO ENSURE THAT SEDIMENT-LADEN WATER DOES NOT
LEAVE THE SITE.
5. AT NO TIME SHALL MORE THAN 1 FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.
THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE…