NOAA Standard Specification MOC-167-1 Refurbishment of Water Tight Closures.pdf

PDF 23 KB Posted

Attached to
MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS
Solicitation number
1305M226Q0100REF
Issued by

About this file

This is a Standard Specification document issued by the National Oceanic and Atmospheric Administration (NOAA) Marine Operation Center for the refurbishment of watertight closures on ships and boats.

The specification establishes requirements for overhauling watertight doors, hatches, and scuttles, including removal to a suitable machine shop for comprehensive refurbishment. Work includes disassembly and cleaning of all parts with polishing of shafts and chasing of threads; repairs encompassing grinding and welding of defects, weld build-up of damaged coaming knife edges using material compatible with base material, renewal of wasted steel, hinge repairs, installation of new wedges, and straightening of closures and frames; preservation through painting per Detail Specifications; and reassembly using new washers, shims, packing, bushings, clips, and spacers. Installation of overhauled closures requires new hinge pins, bushings, washers, shims, adjustment bolts, fasteners, rubber seals and gaskets conforming to Mil-R-900, hasp pins, hooks, and rubber bumpers, followed by adjustment and lubrication of operating mechanisms.

Quality assurance requirements mandate inspection of dog-holding systems prior to disassembly, inspection of all parts post-disassembly for deterioration or excessive wear, chalk testing to verify 100% contact on watertight surfaces, operational testing, and water hose testing of weather-type closures using 1½-inch hose at 50 psig nozzle pressure with zero allowable leakage. Condition Reports must be submitted to the Contracting Officer's Technical Representative (COTR) within 24 hours of inspection or testing completion.

View the file

Other files

File Type Posted
04950 - 04950SS 50MM TO 200MM.jpg JPG image
04004139a.pdf PDF
0400382d.PDF PDF
VDT-TM-91534-35 Technical User Manual Davit HN-9003 cover sheet.pdf PDF
TJ-573-01 Cranes Deck and Boom O M.pdf PDF
TJ-573-01 Cranes Deck and Boom O M_weight chart.pdf PDF
TJ-573-01-1_Fwd Crane - hydraulic pump supplemental parts info.pdf PDF
0400427a.pdf PDF
3.1 CERTIFICATE.pdf PDF
0400426f.pdf PDF
0400426.PDF PDF
VDT-IM-91534-35 User manual for installation of davit HN-9003 POEA-133M-15CN-0139MOA2-11(14) rev.00..pdf PDF
602-6634905_Hull Label Plates.pdf PDF
TJ-241-01 Reduction Gear Main Propulstion RS2719S (1).pdf PDF
DirecTV Configuration.pdf PDF
Davit Hose Inventory.xlsx XLSX spreadsheet
TJ-562-001A Rudder Arrangment and Details_102457373.pdf PDF
NOAA Standard Specification MOC-100-1A_Abs Load Line Survey.pdf PDF
Steyr Motors Marine Engines Manual.pdf PDF
Valeport Skin Valve Drawing.pdf PDF
Quincy QR-25 Series Model 350.pdf PDF
Register of Lifting Appliances_fillable.pdf PDF
320-6634679_Cableway Arrangement and Details.pdf PDF
TJ-528-010A - Waste Water Tank Structural Modifications_102021653.pdf PDF
NOAA Standard Specification MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
801-6634641_Table of Offsets.pdf PDF
TJ-311-05 Engine Ship_s Service Generator Series 60.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
259-6634766 Engine Exhaust System.pdf PDF
48026A-GI INDUSTRIAL-NOAA T JEFFERSON-POTBD_UTT.pdf PDF
TJ-583-023C Davit Hydraulic Modifications.pdf PDF
625-6634893J_Doors Hatches Windows and Airports.pdf PDF
TJ-436-001 Fire Detection and Alarm System.pdf PDF
eCFR __ 46 CFR Part 160 Subpart 160.151 -- Inflatable Liferafts (SOLAS).pdf PDF
NOAA Standard Specification AMC-634-1A_Deck Coverings.pdf PDF
501-6634830 Piping Module No 2.pdf PDF
NAVSEA Standard Item 009-32_Cleaning and Painting Requirements.pdf PDF
ABS Marine Vessel Rules.pdf PDF
TJ-233-01 Detroit Diesel 6V92.pdf PDF
TJ-651-02 Grease interceptor Gaylord Hood.pdf PDF
TJ-568-004D Bow Thruster Installation.pdf PDF
101-6634869 Structural Module 10.pdf PDF
633-67635_Installation Drawing ICCP Equipment.pdf PDF
TJ-635-6634624_Insulation Layout and Details.pdf PDF
512-6634841_ HVAC Diagram.pdf PDF
261-6634755D Fuel Oil Service Diagram.pdf PDF
436-6634706 Rev C_ACCU elementary wiring diagram - redline.pdf PDF
TJ-311-01 EDG Engine.pdf PDF
NF 57-07-12 - DryDock-UWILD Inspection Checklist (public).pdf PDF
Show 40 more

Latest 50 of 214 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-167-1

September 2000

National Oceanic and Atmospheric Administration Marine Operation Center

Standard Specification MOC-167-1

REFURBISHMENT OF WATER TIGHT CLOSURES

1. SCOPE: This specification contains the general requirements and procedure used in refurbishing watertight doors, hatches and scuttles.

2. REFERENCES

None

3. REQUIREMENTS

3.1 Remove all specified closures from the ship or boat to a

suitable machine shop for overhaul and testing.

3.1.1 Work frames and coamings in place.

3.1.2 Install a temporary hinged closure of ½ inch exterior

plywood where no secondary closure exists.

3.2 The overhaul shall include the following work on each

closure to include its frame and coaming:

3.2.1 Disassembly and cleaning. Completely disassemble and

clean all parts.

a. Polish all shafts.

b. Chase all threads.

3.2.2 Repairs.

a. Grind out defects (e.g., cracks and broken welds) and weld repair.

b. Weld build up low or damaged areas on the knife edge of the coaming with filler material compatible with the base material and grind to a straight, smooth surface.

NOTE: Determination of coaming material, i.e., ferrous or CRES should be accomplished prior to welding.

c. Renew wasted steel. Use cutting and welding techniques that will minimize distortion of the surrounding steel.

d. Weld repair all hinges.

e. Install new wedges on each closure.

f. Straighten each closure, frame, and knife edge.

3.2.3 Preservation: Prepare and coat all steel painted

surfaces in accordance with the painting specification identified in the Detail Specification.

3.2.4 Reassemble the closures using new washers, shims, packing, bushings, clips and spacers for dog and latching assemblies.

3.3 Install the overhauled closure in its original location

using new:

3.3.1 Hinge pins, bushings, washers, shims, adjustment bolts, screws, cotter pins, and fasteners.

3.3.2 Rubber seals and gaskets conforming to Mil-R-900, or

equal.

3.4 Install new hasp pins, hook and rubber bumper.

3.5 Adjust each closure for fit and proper operation. Lubricate operating mechanisms with lubricant recommended by manufacturer.

4. QUALITY ASSURANCE

4.1 Prior to disassembly, inspect the system used to hold the dogs in their opened position for deterioration, damage, and excessive wear that may affect their proper operation.

4.2 After disassembly and cleaning, inspect all parts for

1deterioration, damage, and excessive wear that may affect the proper operation of the closure.

4.3 Perform a chalk test on each water tight closure. Chalk

imprint shall be centered with 100% contact.

4.4 Perform an operational test of each closure to prove correct operation.

4.5 Perform a water hose test of each weather type water tight closure in accordance with the following:

4.5.1 Use a 1-½ inch hose with a minimum nozzle diameter of ½ inch at 50 psig nozzle pressure at a maximum distance of 10 feet from the surface being tested.

4.5.2 The water stream shall be directed against the

structure in a manner most likely to disclose leakage.

4.5.3 Allowable leakage: None.

4.6 Submit Condition Reports to COTR within 24 hours of the

inspection or test.

END OF SPECIFICATION