This document is a National Oceanic and Atmospheric Administration (NOAA) Atlantic Marine Center Standard Specification for valve overhaul and testing procedures for NOAA ships and boats. The specification provides comprehensive technical requirements for valve maintenance, including complete disassembly, cleaning, inspection, contact fit verification, reassembly, and hydrostatic testing of various valve types such as globe, gate, plug, butterfly, and swing-check valves.

Key technical requirements include: thoroughly cleaning valve components to bright metal, checking stem straightness and thread conditions, verifying precise contact fits using bluing transfer methods, renewing gaskets and seals, and conducting rigorous hydrostatic tests with specific leakage rate tolerances. The specification outlines detailed procedures for different valve types, with additional requirements for sea valves, such as inspecting fastener materials and coating steel valve interiors. Contractors must perform preliminary inspections and tests before requesting final acceptance testing in the presence of the Contracting Officer's Technical Representative (COTR).

View the file

Other files

File Type Posted
ATTACHMENT IV Updated v3 - Pricing Schedule (1).pdf PDF
ATTACHMENT IV Updated v3 - Pricing Schedule (1).xlsx XLSX spreadsheet
625-6634893J_Doors Hatches Windows and Airports_102475074.pdf PDF
Federon Drawings (1).pdf PDF
ABS Approved drawing.png PNG image
T1657912 Doors and Hatches RL_102474204.pdf PDF
TJ-311-05 Engine Ships Service Generator Series 60.pdf PDF
634-6634945B Deck Covering Schedule.pdf PDF
Thomas Jefferson_FY2026 Dockside Repair Package Rev A_2025JUN27_Signed.pdf PDF
TJ_FY2026 DS_ Fwd Crane Hose Inventory.pdf PDF
TJ-573-01-1_Fwd_Crane_Hydraulic_Pump_SPI.pdf PDF
TJ_FY2026 DS_ Aft Crane Hose Inventory.pdf PDF
ATTACHMENT IV Updated - Pricing Schedule.pdf PDF
625-6634817E WT Door Hydraulic System Arrangement and Details.pdf PDF
525-6634754E Fills Vents Soundings Arrngmnt Details.pdf PDF
501-6634830 Piping Module No 2.pdf PDF
TJ-583-6634804B Rescue Boat Davit Hydr Sys.pdf PDF
TJ Trim Stability Booklet Rev F.docx DOCX document
601-6634920 Joiner Arrangement Lower Deck and Flat.pdf PDF
NOAA Standard Specifications MOC-300-3_General Requirements for Electrical_Electronic Items.pdf PDF
NOAA Standard Specification MOC-631-2D Coatings for Steel Surfaces.pdf PDF
TJ-152-002B Deck Extension Structure Grating Replacement.pdf PDF
TJ-583-03A Davit Hydrographic Survey Launch (HSL).pdf PDF
TJ-551-002A_Compressed Air System Piping Diagram Modification (As Built).pdf PDF
504-6634727A Clock System Wiring.pdf PDF
320-6634677 Cableway Routing and Penetrations - redline.pdf PDF
TJ-524-001 Sea Chest Cross-Over Piping.pdf PDF
TJ_NONE_TJ-320-100_RevNO REVISION_Sht1 THRU 3_N_A_ELECTRICAL REMOVALS MODIFICATIONS INCIDENTAL TO BRIDGE NAVIGATION SYSTEMS (1).pdf PDF
TJ-202-010rA_EDG.pdf PDF
TJ-582-002A New Transom Mooring Chock Inst.pdf PDF
TJ-593-007 SEWAGE TANK AERATION SYSTEM INSTALLATION_124644075.pdf PDF
TJ Memo 835-003_-_Fixed Ballast Installation FEA Memo.docx DOCX document
551-6634801_Rev E Compressed Air Sys Diag.pdf PDF
622-6634895 Machinery Space Floor Plates and Grating.pdf PDF
TJ-551-003C SSDG UPGRADES COMPRESSED AIR MODS.pdf PDF
185-001-NEW PLTF INCID SEWAGE AERATION SYSTEM_124647688.pdf PDF
101-6634870 Structural Module 11_124642565.pdf PDF
TJ-170-6634883-F.pdf PDF
TJ_85_TJ-085-002_RevJ_BOOKLET OF GENERAL PLANS.pdf PDF
601-6634921 Joiner Arrangement Main Deck.pdf PDF
085-6980295E TJ Tank Capacities Soundings.pdf PDF
TJ-583-6634886H BOAT HANDLING STOWAGE.pdf PDF
TJ-835-003_-_Fixed Ballast Installation FEA Memo_122914139.pdf PDF
512-6634856_HVAC Arr Details FCSLE Deck Fr 19-50.pdf PDF
261-6634755D Fuel Oil Service Diagram.pdf PDF
TJ-432-001 Data Phone Arrangement.pdf PDF
NOAA Standard Specification MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
TJ-551-004 Whistle Comp Air System Arrangement Details.pdf PDF
TJ-101-001_-_Fixed Ballast Installation_122913467.pdf PDF
514-3275003-11 REV A AC PIPING INSTL MN DK.pdf PDF
Show 40 more

Latest 50 of 164 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-505-1B

AUGUST 1995

SUPERSEDING

AMC-505-1A

SEPTEMBER 1990

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-505-1B

VALVE OVERHAUL AND TEST

1. SCOPE. This specification contains the general requirements for overhaul and test of valves on and for NOAA ships and boats.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 Standard Overhaul. Overhaul all specified valves as

follows:

3.1.1 Except for valves which have welded ends preventing

removal without cutting the welds, or unless otherwise specified in the detail specification or other applicable procurement document, remove all specified valves from the ship or boat to a suitable machine shop for overhaul and tests. Specified valves which are not removed from the ship or boat shall be overhauled in place. See paragraph 3.2 for special requirements for sea valve removals.

3.1.2 Tag each valve prior to removing from the ship or

boat.

3.1.3 Completely disassemble each valve. Matchmark valve

parts. Thoroughly clean bonnets, stems, discs, gates, globes, seats, bodies, and other metal parts to bright metal.

3.1.4 Deleted.

3.1.5 Clean and chase all valve stem threads. Check stems

for straightness. Straighten stems to within 0.002 inch total indicator runout (TIR). Polish stems to a 32 Root-Mean-Square (RMS) finish in way of packing surface and remove all raised edges.

3.1.6 Visually inspect all parts, including all fasteners, for deterioration and other defects. Clean, dress, and true gasket mating surfaces.

3.1.7 Check the disc-to-seat, globe-to-seat, and plug-to-

bore contact fits using the bluing transfer method. Machine, grind, lap, spot-in, and recheck contact fits as necessary to obtain the following contacts:

a. Globe, globe angle, and globe stop-check valves shall have a 360-degree continuous globe-to-seat contact with a bluing transfer line not exceeding 1/16-inch width.

b. Gate valves shall have a 360-degree continuous gate-to-seat contact with a bluing transfer line which does not exceed 3/16-inch width. The transfer line shall appear within the lower 50-percent of the gate seating surface at the top and bottom of the gate.

c. Plug valves shall have a minimum 80-percent plug-to-bore surface contact, evenly distributed over 100-percent of the area.

d. Swing-check valves shall have a 360-degree continuous disc-to-seat contact.

3.1.8 If unable to obtain the above specified contact fits

by machining, grinding, and lapping, renew the globes, plugs, discs, gates, and renewable seats. Contractor may, at their option and at no additional cost to the Government, renew globes, plugs, discs, gates, and renewable seats after initial inspections and before machining, grinding, or lapping the existing parts to obtain the required contact fits.

3.1.9 (Modified and relocated to section 3.2)

3.1.10 Reassemble each valve. Insure that discs, gates, and plugs are in the half-open position during reassembly to avoid damaging seats or bending stems. Renew all gaskets, fasteners, rubber seals, and non-metallic seats. In butterfly valves, renew boots, o-rings, o-ring fasteners, and teflon bushings. Renew valve stem packing in feed water, condensate, and steam valves with packing conforming to MIL-P-24503 and DOD- P-24583. Renew valve stem packing in all other valves with packing conforming to MIL-P-24396, Type B.

3.1.11 Prior to disassembling and overhauling a valve, the

Contractor may, at their option and at no additional cost to the Government, renew the valve with an identical valve. If this option is exercised, the new valve must be tested and meet the same acceptance criteria as prescribed herein for overhauled valves. If a valve is determined after disassembly to be nonrepairable, the Government will negotiate an equitable cost adjustment, limited to the difference between the cost of the new valve and the costs which would have been incurred had the valve been overhauled. For valves of 3-inch IPS size and below, the cost adjustment will be limited to the costs incurred associated with disassembling the valves.

3.2 Additional Sea Valve Requirements.

3.2.1 Inspect all studs, bolts, and nuts in line and bonnet

flanges of non-ferrous sea valves to determine the material. If the fasteners are not nickel-copper (Monel), submit a Condition Report giving the actual material, condition, and recommendations.

3.2.2 Coat the interior of each steel valve, excluding

seating and polished surfaces, with the same epoxy primer used on the underwater body.

3.2.3 Remove all waster pieces and spool pieces installed

between the sea valves and the ship's hull. Thoroughly clean the waster and spool pieces, and inspect for deterioration or other defective conditions. Inspect all fasteners and submit a Condition Report same as specified above for sea valves.

3.2.4 Whenever a transducer sea chest valve is required to

be removed for overhaul, extreme care must be taken to prevent damaging the transducer assembly. Remove and reinstall the transducer assembly in accordance with the transducer manufacturer's technical manual, a copy of which will be provided by the COTR within 48 hours after requested.

3.3 Tests. After reassembling or renewing, conduct hydrostatic tests of each valve as follows:

3.3.1 All tests shall be performed using clean water as the

test medium. Unless otherwise specified, the test pressure shall be 150-percent of the maximum operating pressure of the system from which the valve was removed, but not less than 50 pounds-per-square-inch-gage (psig).

3.3.2 With the valve in the open position, test each valve

body for 10 minutes. No leakage is allowed.

3.3.3 Seat each plug and butterfly valve with hand force.

Seat all other valves using the torque values listed in the following table as the maximum allowable seating force applied to the handwheel.

Total Tangential Force Handwheel Diameter (pounds) on Rim of Handwheel

2 inches and below 90 3 inches 98 4 inches 106 5 inches 112 6 inches and greater 118 plus 3 pounds for each inch above 6, not to exceed 150 pounds.

3.3.4 Test each globe, angle globe, and globe stop-check

valve by applying test pressure in the direction tending to open the valve. Test each butterfly, gate, and plug valve by applying test pressure alternately on both sides of the disc, gate, or plug. Hold test pressure for a minimum of 3 minutes if there is no evidence of leakage. If there is evidence of leakage, hold the test pressure and measure the leakage rate.

3.3.5 Test each globe stop-check valve and swing-check

valve by applying test pressure in direction tending to close the valve (back pressure) for a minimum of 5 minutes. If leakage occurs, hold the test pressure and measure the leakage rate.

Globe stop-check valves shall be tested with stems in the open position. The test back pressure for valves having a pressure rating of 150 psig and below shall be 50 psig, and for valves having a pressure rating over 150 psig shall be 100 psig.

3.3.6 The seat leakage shall not exceed the following:

a. Check valve back pressure tests -- For valves up to and including 2 inches, the leakage rate shall not exceed 25 cc/hour/inch diameter. For valves 2-1/2 to 10 inches, the leakage rate shall not exceed 50 cc/hour/inch diameter. For valves over 10 inches, the leakage rate shall not exceed 100 cc/hour/inch diameter.

b. Soft-seated valves -- No leakage shall be permitted.

c. Metal-to-metal seated valves -- For valves less than 1 inch, the leakage rate shall not exceed 10 cc/hour. For larger valves, the leakage rate shall not exceed 10 cc/hour/inch of nominal pipe size.

3.3.7 Any valve which fails a seat leakage test shall be

renewed or overhauled and retested until an acceptable test is performed.

3.4 Reinstallation. After tests have been accepted by the COTR, reinstall each valve, using new flange gaskets.

4. QUALITY ASSURANCE.

4.1 Prior to requesting the COTR to witness the final bluing

contact inspection or the final acceptance hydrostatic tests of a valve, the Contractor shall perform preliminary inspections and tests which meet the acceptance criteria stated above.

4.2 After acceptable preliminary inspections and tests have been conducted, the Contractor shall notify the COTR and conduct final acceptance bluing contact inspection and final acceptance hydrostatic tests of each valve in the COTR's presence.

END OF SPECIFICATION