ATTACHMENT IV Updated - Pricing Schedule.pdf
PDF 118 KB Posted
- Solicitation number
- 1305M225R0034
About this file
The document is a Pricing Schedule (Attachment IV) for NOAA Ship Thomas Jefferson Dockside Repairs, detailing base and growth items for various ship maintenance services. Base items include 14 specific work items such as life raft annual inspections, lifting appliances certification, fire and safety inspections, various repair and servicing tasks, including main engine 16000-hour overhaul and centralized machinery control system grooming. The growth items section allows for additional work through Additional Item Requirements (AIRs), with an estimated 1,250 labor hours and a material markup/handling fee based on an estimated $53,000.00 value. The pricing schedule uses a Job (JB) unit of measure for most items and provides flexibility for potential additional work through the AIRs section, with unit prices to be used for any future contract modifications involving growth work.
View the file
Other files
Show 40 more
Latest 50 of 164 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN SPEC WORK ITEM SPECIFICATION WORK ITEM TITLE UNIT QTY UNIT PRICE
1000 301 Life Raft Annual Inspections and Servicing 1 JB
1000 302 Lifting Appliances Certification 1 JB
1000 303 Fire & Safety Annual Inspections 1 JB
1000 304 Miscellaneous Piping Repairs 1 JB
1000 305 Miscellaneous Corrosion Mitigation Repairs 1 JB
1000 306 Miscellaneous Habitability Repairs 1 JB
1000 307 SSDG No.1, No.2, & No.3 Servicing 1 JB
1000 308 Galley Equipment Servicing 1 JB
1000 309 Exhaust System (Galley & Quarters) Cleaning 1 JB
2000 310 Main Engine 16000-Hour Overhaul 1 JB
2000 311 Forward and Aft Crane Repairs and Testing 1 JB
2000 312 Centralized Machinery Control System (CMCS) Groom 1 JB
6001 601 Fast Rescue Boat (FRB) Davit Five (5) Year Overhaul 1 JB
6002 602 Safer at Seas 1 JB
CLIN SPEC WORK ITEM SPECIFICATION WORK ITEM TITLE UNIT QTY UNIT PRICE
3000/4000 400
AIRS/Growth (estimated)
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 1,250; Unit of Issue: Hour; Extended Price: $____________
HRS EST. 1,250
3000/4000 400
AIRs/Growth Material Markup/Handling Fee Unit Price: $; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$53,000.00 X percentage quoted]: $______________
% EST. 53,000.00
N/A N/A Additional Temporary Services (See CAR 1352.271-89) Day 1
BASE
BASE + GROWTH
ATTACHMENT IV - Pricing Schedule NOAA Ship Thomas Jefferson Dockside Repairs
BASE ITEMS
Total Base Items
ADDITIONAL ITEMS - GROWTH
ADDITIONAL ITEM REQUIREMENTS (AIRs): These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If AIRs are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
Total Growth