ATTACHMENT IV Updated v3 - Pricing Schedule (1).pdf
PDF 121 KB Posted
- Solicitation number
- 1305M225R0034
About this file
This document is a Pricing Schedule for NOAA Ship Thomas Jefferson Dockside Repairs, detailing base items, additional growth items, and option items. The base contract includes 12 line items (CLINs) for various ship maintenance services such as life raft annual inspections, lifting appliances certification, fire and safety inspections, machinery servicing, and equipment repairs. The pricing schedule indicates these services are priced on a "Job" (JB) basis, with a quantity of 1 for each line item.
The additional items section includes provisions for growth work, with an estimated 1,250 hours of AIRs/Growth Labor and a material markup/handling fee based on $53,000.00. Two option items are listed: a Fast Rescue Boat (FRB) Davit Five (5) Year Overhaul and a "Safer at Seas" item. The document allows for potential contract modifications if additional growth work is required, with unit prices to be applied throughout the contract's lifecycle. The solicitation is associated with NOAA and the Department of Commerce for dockside repair services for the NOAA Ship Thomas Jefferson.
View the file
Other files
Show 40 more
Latest 50 of 164 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN SPEC WORK ITEM SPECIFICATION WORK ITEM TITLE UNIT QTY UNIT PRICE
1000 301 Life Raft Annual Inspections and Servicing 1 JB
1000 302 Lifting Appliances Certification 1 JB
1000 303 Fire & Safety Annual Inspections 1 JB
1000 304 Miscellaneous Piping Repairs 1 JB
1000 305 Miscellaneous Corrosion Mitigation Repairs 1 JB
1000 306 Miscellaneous Habitability Repairs 1 JB
1000 307 SSDG No.1, No.2, & No.3 Servicing 1 JB
1000 308 Galley Equipment Servicing 1 JB
1000 309 Exhaust System (Galley & Quarters) Cleaning 1 JB
2000 310 Main Engine 16000-Hour Overhaul 1 JB
2000 311 Forward and Aft Crane Repairs and Testing 1 JB
2000 312 Centralized Machinery Control System (CMCS) Groom 1 JB
CLIN SPEC WORK ITEM SPECIFICATION WORK ITEM TITLE UNIT QTY UNIT PRICE
3000/4000 400
AIRS/Growth (estimated)
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 1,250; Unit of Issue: Hour; Extended Price: $____________
HRS EST. 1,250
3000/4000 400
AIRs/Growth Material Markup/Handling Fee Unit Price: $; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$53,000.00 X percentage quoted]: $______________
% EST. 53,000.00
N/A N/A Additional Temporary Services (See CAR 1352.271-89) Day 1
6001 601 Fast Rescue Boat (FRB) Davit Five (5) Year Overhaul 1 JB
6002 602 Safer at Seas 1 JB
BASE
BASE + GROWTH
BASE + GROWTH + OPTION
OPTION ITEMS
Total Option
ADDITIONAL ITEM REQUIREMENTS (AIRs): These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If AIRs are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
Total Growth
ATTACHMENT IV - Pricing Schedule
NOAA Ship Thomas Jefferson Dockside Repairs
BASE ITEMS
Total Base Items
ADDITIONAL ITEMS - GROWTH
File details come from the government source that posted it. Updated .