Bldg_4760_Asbestos_Survey_Report_Final.pdf
PDF 8 MB Posted
- Attached to
- Central Steam Distribution Replacement Phase 1 Federal contract opportunity
- Solicitation number
- NNM17615413E
About this file
Asbestos Report
View the file
Other files for this federal contract opportunity
Show all 50
Central Steam Distribution Replacement Phase 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Asbestos Survey for Asbestos-Containing Materials
Prepared for:
Marshall Space Flight Center, AL
Building 4760 Marshall Space Flight Center
GSE - 013
October 31, 2008
Prepared by
Great Southern Engineering, Inc.
3795 Gordon Terry Parkway
Trinity, Alabama 35673
TABLE OF CONTENTS
1. Introduction
2. Summary
2.1. Suspect ACMs
2.2. Recommendations
3. Survey Scope
4. Limitations
5. Survey and Sample Collection Procedure
6. Previous Survey / Plans Review
7. Suspect ACM Materials Not Sampled
8. Survey Sampling Results
9. Appendices
Task Order GSE 013 Page 1 of 27
GENERAL ASBESTOS SURVEY OF
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
1. Introduction
In accordance with GSE Task Order No.GSE-013 dated April 21, 2008, Great Southern Engineering, Inc. (GSE) has performed an asbestos survey of Building 4760 located at George C.
Marshall Space Flight Center, Marshall Space Flight Center, Alabama. The 26,986 square feet building was identified to have been originally constructed in 1960. A total of 59 samples were collected from the building.
The objective of the Asbestos Survey is to determine the location and quantity of asbestos-containing materials at the Property building.
GSE’s Scope of Work included:
Visual inspection and identification of suspect asbestos-containing materials (ACMs) in the Property building and collected a representative number of samples for analysis.
As part of this asbestos survey, GSE personnel collected samples of all suspect friable and suspect damaged non-friable building materials at the Property. The remaining suspect non-friable materials were not be sampled as part of this asbestos survey
Estimated quantities and locations of ACM.
Assessed the condition of the ACM identified.
Assigned a hazard rating to each type of ACM.
This report has been prepared for the use of George C. Marshall Space Flight Center. Our investigation was performed using the degree of care and skill ordinarily exercised under similar circumstances by professional consultants practicing in this or similar localities. No other warranty or guarantee, expressed or implied, is made as to the conclusions included in this report.
Task Order GSE 013 Page 2 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
The GSE, Inc. did not perform destructive sampling procedures at the site; therefore, regardless of the thoroughness of this survey, it is possible that suspected asbestos-containing materials (ACMs) might exist in the building beneath the floors, behind walls, within pipe chases, or in other inaccessible locations. If, during renovation or demolition activities, materials not addressed in this survey are discovered, these materials should be sampled and analyzed for asbestos content prior to disturbance.
Surveyed by:
William F. Ystueta
University of Alabama Safe State Program Accredited Inspector
Accreditation #AIN0508Y6144
Written by:
Manju Ramasamudra
University of Alabama Safe State Program Accredited Inspector/Management Planner
Accreditation #APL0308R5089
Task Order GSE 013 Page 3 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
2. Summary
GSE performed an Asbestos Survey and Hazard Assessment at Building 4760 in Marshall Space Flight Center, Alabama on May 14, July 7, and August 31, 2008. Sample collection was completed by licensed personnel – William F. Ystueta. The following report summarizes the independent conclusions representing GSE’ best professional judgment based on information and data available to us during the course of this survey. Factual information regarding operations, conditions, and tests data provided by the client, owner or their representative has been assumed to be correct and complete. Additionally, the conclusions presented are based on the conditions that existed on the date(s) of the assessment.
The 26,986 square feet building was identified to have been originally constructed in 1960. A total of 59 samples were collected from the building. Three (3) Homogeneous materials were identified as asbestos-containing materials. A summary of the samples collected for this area and corresponding analytical results is presented below.
Sample Description
Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 111 Miscellaneous Debris Pipe Insulation 200 SF
Room Number Grid Numbers 102 F1-1, F1-2, F1-3, F1-4
106 F2-1, F2-2, F2-3, F2-4
Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 65 Pipe Insulation Pipe Insulation 4,500 LF
Room Number Grid Numbers 101 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
102 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
103 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
104 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
105 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 65 Pipe Insulation Pipe Insulation 4,500 LF
Room Number Grid Numbers 106 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
107 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
108 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
109 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
110 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 65 Pipe Insulation Pipe Insulation 4,500 LF
Room Number Grid Numbers 111 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
112 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
113 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
114 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
116 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 65 Pipe Insulation Pipe Insulation 4,500 LF
Room Number Grid Numbers 117 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
118 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
119 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
122 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
123 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 75 Pipe Insulation Pipe Insulation Mud on Elbows 900 Elbows
Room Number Grid Numbers 101 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
102 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
103 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
104 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
105 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 75 Pipe Insulation Pipe Insulation Mud on Elbows 900 Elbows
Room Number Grid Numbers 106 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
107 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
108 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
109 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
110 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 75 Pipe Insulation Pipe Insulation Mud on Elbows 900 Elbows
Room Number Grid Numbers 111 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
112 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
113 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
114 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
116 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, Sample
ID
Building Number
Sample Material
ACM
Quantity
4760 75 Pipe Insulation Pipe Insulation Mud on Elbows 900 Elbows
Room Number Grid Numbers 117 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
118 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
119 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
122 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL3-4, WL4-1, WL4-2, WL4-3, WL4-4, WR1-1, WR1-2, WR1-3, WR1-4, WR2-1, WR2-2, WR2-3, WR2-4, WR3-1, WR3-2, WR3-3, WR3-4, WR4-1, WR4-2, WR4-3, WR4-4
123 C1-1, C1-2, C1-3, C1-4, C2-1, C2-2, C2-3, C2-4, C3-1, C3-2, C3-3, C3-4, C4-1, C4-2, C4-3, C4-4, F1-1, F1-2, F1-3, F1-4, F2-1, F2-2, F2-3, F2-4, F3-1, F3-2, F3-3, F3-4, F4-1, F4-2, F4-3, F4-4, WE1-1, WE1-2, WE1-3, WE1-4, WE2-1, WE2-2, WE2-3, WE2-4, WE3-1, WE3-2, WE3-3, WE3-4, WE4-1, WE4-2, WE4-3, WE4-4, WF1-1, WF1-2, WF1-3, WF1-4, WF2-1, WF2-2, WF2-3, WF2-4, WF3-1, WF3-2, WF3-3, WF3-4, WF4-1, WF4-2, WF4-3, WF4-4, WL1-1, WL1-2, WL1-3, WL1-4, WL2-1, WL2-2, WL2-3, WL2-4, WL3-1, WL3-2, WL3-3, WL1-1
WR2-1
WR1-1
WL3-1
WL2-1
WR4-1
WR3-1
F1-1 F2-1 F3-1 F4-1
C1-1 C2-1 C3-1 C4-1
C1-2
C1-3
C1-4
C2-2
C2-3
C2-4
C3-2
C3-3
C3-4
C4-2
C4-3
C4-4
WR4-2
WR4-3
WR4-4
WR3-2
WR3-3
WR3-4
WR2-2
WR2-3
WR2-4
WR1-2
WR1-3
WR1-4
F4-2
F4-3
F4-4
F3-2
F3-4
F2-2
F2-3
F2-4
F1-2
F1-3
F1-4
WL1-2
WL1-3
WL1-4
WL2-2
WL2-3
WL2-4
WL3-2
WL3-3
WL3-4
WL4-2
WL4-3
WL4-4
F3-3
WL4-1
WF4-1 WF4-2 WF4-3 WF4-4
WF3-1
WF2-1
WF1-1
WF3-2
WF2-2
WF1-2
WF3-3
WF2-3
WF1-3
WF3-4
WF2-4
WF1-4
WE4-1WE4-2WE4-3WE4-4
WE3-1
WE2-1
WE1-1
WE3-2
WE2-2
WE1-2
WE3-3
WE2-3
WE1-3
WE3-4
WE2-4
WE1-4
Map Document: (G:\asbestos\Asbestos_Room_grid.mxd)
1. Note: Entry wall depicted is as seen from inside the room, therefore grid WE4-4 is located at the top left corner of wall. The main entry door is located within the entry wall.
2. Entry wall location shall be described as N (North) S (South) E (East) or W (West) as seen from the inside of the room. Utilizing the facilities data book, N is located at the top of page, S at bottom of page, E at right of page and W and left of page regardless of bearing shown on drawing for all buildings. (The directional bearing symbol is pointing to either NE or NW for approximately 29 buildings in the facilities data book. Consider these NE or NW bearings as being Plan N when identifying the direction of the entry wall.)
The only exception is building 4705, this drawing shall be oriented towards North as shown on drawing.
3. Type of grid system uses 4 grids by length and 4 grids by width irrespective of the room size.
Grid: C - ceiling, WF - far wall, WE - entry wall, WL - left wall, WR - right wall, F - floor
Asbestos Survey Room Grid Note: Asbestos containing material above the ceiling should be noted on the ceiling grid
Far Wall Entry Wall
Far Wall
WL1-1
WR2-1
WR1-1
WL3-1
WL2-1
WR4-1
WR3-1
WR4-2
WR4-3
WR4-4
WR3-2
WR3-3
WR3-4
WR2-2
WR2-3
WR2-4
WR1-2
WR1-3
WR1-4
WL1-2
WL1-3
WL1-4
WL2-2
WL2-3
WL2-4
WL3-2
WL3-3
WL3-4
WL4-2
WL4-3
WL4-4
WL4-1
C1-1 C2-1 C3-1 C4-1
C1-2
C1-3
C1-4
C2-2
C2-3
C2-4
C3-2
C3-3
C3-4
C4-2
C4-3
C4-4
WF4-1 WF4-2 WF4-3 WF4-4
WF3-1
WF2-1
WF1-1
WF3-2
WF2-2
WF1-2
WF3-3
WF2-3
WF1-3
WF3-4
WF2-4
WF1-4
WE4-1WE4-2WE4-3WE4-4
WE3-1
WE2-1
WE1-1
WE3-2
WE2-2
WE1-2
WE3-3
WE2-3
WE1-3
WE3-4
WE2-4
WE1-4
F1-1 F2-1 F3-1 F4-1
F4-2
F4-3
F4-4
F3-2
F3-4
F2-2
F2-3
F2-4
F1-2
F1-3
F1-4
F3-3
Map Document: (G:\asbestos\Asbestos_Hall_grid.mxd)
1. Note: Entry wall and far wall are optional; there maybe neither that are identified in the hallway. Entry wall depicted is as seen from inside the room, therefore grid WE4-1 is located at the top left corner of wall.
2. Type of grid system uses 4 grids by length and 4 grids by width irrespective of the hall size.
3. The identification of hallway segments will be determined by the end rooms. Hallways will be measured from South to North and from East to West Ex. Room most south of hallway is Room 107 and room most North of hallway is Room 200. Using H as the designation of hallway. The identification of hallway is HS107N200. Likewise from east to west would be HE107W200. The room number sequencing is arbitrary; Ex. HE200W107 would be acceptable. NS&EW are used to distinguish between vertical and horizontal run corridors on drawings.
4. Utilizing the facilities data book, N is located at the top of page, S at bottom of page, E at right of page and W and left of page regardless of bearing shown on drawing for all buildings. (The directional bearing symbol is pointing to either NE or NW for approximately 29 buildings in the facilities data book. Consider these NE or NW bearings as being Plan N when identifying the hallway number.) The only exception is building 4705, this drawing shall be oriented towards North as shown on drawing.
Grid: C - ceiling, WF - far wall, WE - entry wall, WL - left wall, WR - right wall, F - floor
Asbestos Survey Hallway Grid Note: Asbestos containing material above the ceiling should be noted on the ceiling grid
Far Wall Entry Wall
Far Wall Room XXXBeginning
Room YYY N or W
S or E
Task Order GSE 013 Page 4 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
2.1. Suspect ACMs
The following information is included for informational purposes:
A. The following suspect asbestos-containing materials were not sampled as part of this scope of work:
Suspect fibrous electrical cable covering (danger of electrocution) were not sampled.
These materials are not subject to regulation under NESHAP for demolition and renovation as long as they are in good condition and are not subject to sanding, grinding, cutting, or abrading.
Since ordinary demolition activities do not include sanding, grinding, cutting, and abrading, these materials may remain in place during building demolition, as long as they remain in good condition and are not friable.
If the material is in poor condition and is friable at the time of demolition or renovation, or if it will be subjected to sanding, grinding, cutting, or abrading, it should first be removed by a licensed asbestos removal contractor and disposed of as asbestos-containing waste.
When removing asphalt-roofing products, the material should be removed using a method that does not subject the material to sanding, cutting, grinding, or abrading (hand tools).
Asbestos-containing roofing may be disposed of as construction debris.
Task Order GSE 013 Page 5 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
2.2. Recommendations
The following additional actions are recommended:
The identified asbestos-containing pipe insulations and associated elbow and fitting insulations are in damaged condition; the miscellaneous debris observed in lower level of the building below the first floor grate was observed to be in significantly damaged condition. The ACM debris was observed to be located on the concrete floor below the pipe runs. MSFC (Property owner/Operator) should develop and implement an Operations and Maintenance (O&M) Program. In addition suspect asbestos-containing materials in the form of caulking on exterior walls, grout on exterior block walls, electrical cable covering, fire doors, window caulking, mirror mastic, leveling compound below ceramic tile flooring, transite panels, and duct vibration joints were not sampled as a part of this assessment. These materials can be maintained as part of the asbestos O&M Program. A properly designed O&M Program is sufficient to maintain the Project in accordance with current regulatory standards and sound business practice. ACM maintained with an O&M Program can remain in place, provided the ACM and suspect ACM remain intact and undisturbed.
Repair or removal of damaged asbestos-containing materials by a licensed asbestos contractor in accordance with all applicable federal, state, and local regulations. If any ACM remains after removal, then an Asbestos O&M Program should be developed and implemented.
Task Order GSE 013 Page 6 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
3. Survey Scope
This survey was conducted for the purpose of identifying asbestos-containing materials (ACM) throughout the building and to conduct a hazard assessment on existing ACM. The survey was non-destructive in nature and limited only to those areas that were readily accessible.
Specific areas to which access was limited by occupant request, unavailability of keys, or by site conditions included the following:
Behind the walls
Beneath the floors
Any suspect ACM not sampled as part of the assessment and if any additional suspect materials were to be identified behind walls and beneath the floors should be sampled prior to repair, renovation, or demolition activities.
Task Order GSE 013 Page 7 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
4. Limitations
GSE did not attempt to disassemble mechanical equipment, open pipe chases or assess materials within wall voids. Regardless of the thoroughness of a survey, the possibility exists that some areas containing asbestos were not identified, inaccessible or different from those at specific locations. The findings and opinions presented are relative to the dates of our site work and should not be relied upon to represent conditions at substantially later dates due to changes in the condition ACM may change over time, renovations and repairs.
This report is for the exclusive use of the client and its agents and use by any unauthorized parties in whole or in part, except as directed by legal jurisdiction, is at the sole risk of the user.
If this assessment includes reliance on work products and/or documents prepared by others, GSE has no responsibility for the accuracy of information contained therein.
Although this assessment has attempted to identify the presence or absence of ACM, potential sources of ACM may have escaped detection due to: (1) the scope of this assessment, (2) the inaccuracy of records, interviews, work products or documents made available to GSE for this report, (3) the presence of undetected or unreported renovations and repairs, (4) inaccessible areas, and/or (5) deliberate concealment of detrimental information.
Estimates presented in this report are based upon observations during the survey and owner-provided information. These reasonable estimates may be affected by unanticipated conditions potentially present in inaccessible or un-surveyed areas. GSE does not warrant or guarantee the quantity estimates. The use of such estimates shall be at the user's own risk and shall constitute a release and agreement to defend and indemnify GSE from and against any liability. If questions arise during the planning for renovation, demolition, or other construction activities, GSE should be notified to permit review of the data and present recommendations.
Interior of the following rooms were inaccessible during our Asbestos Survey on May 14, July 7, and August 31, 2008: None.
Task Order GSE 013 Page 8 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
5. Survey and Sample Collection Procedure
Based on United States Environmental Protection Agency (USEPA) guidance documents, GSE considered all material applications identified during the visual assessment were suspect ACM and sampled as described below.
Bulk samples were collected of any materials, which were suspected of containing asbestos with the exception of fire doors. Fire doors were not sampled because the damage caused by sampling would render these materials friable and may also void the fire rating. Since these materials were not sampled, they should be assumed to be asbestos containing, unless sampled and proven otherwise. Sampling of these assumed ACMs should be performed prior to any renovation or other activity that may cause a material disturbance.
Samples of the remaining suspect ACM were taken in accordance with USEPA recommendations.
The number and location of samples collected was based on the type of material, the manner of application, and the homogeneity of the ACM (similarity of color, texture, and type). Each sample was collected and placed into an individual sample container. The sample location was noted on the field survey form and assigned an individual identification number. This number was affixed to the sample container as the sample was collected. The survey form was also used to note the material type and general condition of the material. During the inspection, each suspect material's accessibility, location, and friability were recorded. This information was used to assess the potential hazard of the ACM and to prioritize response action recommendations.
The USEPA defines asbestos-containing materials (ACM) as those that contain greater than one percent asbestos. Friable materials are defined as those that can be crumbled or reduced to powder by hand pressure.
GSE utilized the “positive-stop” method of sample analysis. In this method, analysis is stopped on a group of samples once the first positive (e.g., greater than 1% asbestos) sample is analyzed.
According to the USEPA, if one sample of a homogenous material is identified to be asbestos containing, the entire material must be considered asbestos containing. By using the positive-stop method, GSE reduces the Client’s laboratory analysis cost by not analyzing the additional samples.
Samples collected were carried and submitted under Chain-of-Custody to Steve Moody Micro Services LLC, Farmers Branch, Texas for analysis of asbestos using USEPA Method 40 CFR, Chapter 1, Part 763, Subpart F, Appendix A, also known as Polarized Light Microscopy (PLM).
Steve Moody Micro Services LLC is certified by the National Voluntary Laboratory Accreditation Program (NVLAP) and licensed by the Department of State Health Services.
Task Order GSE 013 Page 9 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
Samples collected were carried and submitted under Chain-of-Custody to EMSL Analytical, Inc., St. Louis, Missouri for analysis of asbestos using USEPA Method 40 CFR, Chapter 1, Part 763, Subpart F, Appendix A, also known as Polarized Light Microscopy (PLM). EMSL Analytical, Inc. is certified by the National Voluntary Laboratory Accreditation Program (NVLAP) and licensed by the Department of State Health Services.
Task Order GSE 013 Page 10 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
6. Previous Survey / Plans Review
GSE was not provided with any previously conducted asbestos surveys of the Property. As-built/renovation-site plans and construction drawings were reviewed at the Facilities Department Drawing Room. Review of these documents did not identify building material specifications requiring the use of ACM. However, this does not preclude or prevent the potential use of ACM.
Task Order GSE 013 Page 11 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
7. Suspect ACM Materials Not Sampled
During the course of the property visit, GSE performed a preliminary review of interior, accessible areas of the subject building for the presence of suspect asbestos-containing materials (ACMs). This asbestos survey was conducted for overview purposes only; additional suspect materials may exist in concealed locations (behind walls and above ceilings, beneath the floors, within machinery, etc.). Also, not all suspect materials may have been sampled due to the condition or the location of the suspect materials. Destructive sampling of suspect ACMs was not performed. GSE will not be responsible for damaging materials or causing the materials to become friable. The USEPA defines asbestos-containing material as material containing greater than one percent asbestos. This review was not a pre-demolition/renovation survey or for regulatory submittal purposes.
Suspect and/or presumed ACMs were observed within the subject building during the property visit. These suspect and/or presumed ACMs that were not sampled as part of this asbestos survey are listed in the following table.
Sample Description Physical Condition
Friable Yes/No
Type of
ACM
Sample ID
Caulking, On Exterior Wall Joints UPS4 NoM
Grout, On Exterior Wall Masonary UPS5 NoM
Wiring, Fibrous Electrical Cable Covering UPS6 NoM
Fire Doors, Fire Door Insulation UPS7 NoM
Mastic, Mirror Mastic UPS8 NoM
Caulking, Window Glazing UPS10 NoM
Duct Insulation, Duct Vibration Joint UPS11 NoM
Transite, Panels UPS12 NoM
Leveling Compound, Below ceramic tile flooring UPS13 NoM
Task Order GSE 013 Page 12 of 27
Building 4760, George C. Marshall Space Flight Center, Marshall Space Flight Center, Alabama
8. Survey Sampling Results
The results of the Survey are presented in the tables on the following pages. The tables describe the entire suspect Asbestos-Containing Materials (ACMs) identified in the building and list respective sample numbers and laboratory results. Sample numbers presented in the tables correspond to the sample numbers on attached Laboratory Analysis Forms. Also presented in the tables is the estimated quantity and assessed friability for each suspect ACM. For each suspect material identified as ACM, the assessed hazard potential is presented along with GSE’ recommended response action. Hazard potential for each material application is based on the material condition and accessibility to the public and maintenance personnel.
Glossary of Items for the following Table
Type of Asbestos (1) CH = Chrysotile AM = Amosite CR = Crocidolite AN = Anthophyllite TR = Tremolite AC = Actinolite ND = No Asbestos Detected PC = Point Count Method
Type of ACM (2) M = Miscellaneous S = Surfacing TSI = Thermal Systems Insulation
Friability (3) F = Friable NF = Non Friable
Physical Condition (4) U = Good D = Damaged SD = Significantly Damaged
Potential for Disturbance (5) NPD = No Potential for Disturbance PD = Potential for Disturbance PSD = Potential for Significant Disturbance
Assessment Category (6) 1 = Damaged or significantly damaged TSI ACBM, 2 = Damaged friable surfacing ACBM 3 = Significantly damaged friable surfacing ACBM 4 = Damaged or significantly damaged friable miscellaneous ACBM 5 = ACBM with potential for damaged 6 = ACBM potential for significant damage 7 = Any remaining friable ACBM or friable suspected
ACBM
X = not applicable
Unit of Measurement SF = Square Feet
LF = Linear Feet
Sample Location
Sample Analyzed
Yes/No
Estimated Quantity of
ACM
Assessment Category
Physical Condition
Friable Yes/No
Type of
ACM
% and Type of Asbestos Detected
Sample ID Potential For
Distrubance
Homogeneous Area 1
Pipe Insulation Pipe Insulation
Yes 4,500 LF TSI Yes D 1Room: 102 Grid: WL6-1
20% AM - Thermal Insulation 5% CH - Thermal Insulation
65 PD
No TSI Yes D 1Room: 102 Grid: WF5-1
Not Analyzed Positive Stop
66 PD
No TSI Yes D 1Room: 102 Grid: WE8-2
Not Analyzed Positive Stop
67 PD
Yes TSI Yes D 1Room: 102 Grid: WL11-1
23% AM - thermal Insulation 4% CH - Thermal Insulation
68 PD
Yes TSI Yes D 1Room: 102 Grid: WR1-1
ND - Insulation ND - Paper Wrap
69 PD
Yes TSI Yes D 1Room: 105 Grid: WE3-1
ND - Insulation ND - Paper/Foil Wrap ND - Gray Mastic
70 PD
No TSI Yes D 1Room: HE111W115 Grid: WE1-1
Not Analyzed Positive Stop
71 PD
No TSI Yes D 1Room: 102 Grid: F1-1
Not Analyzed Positive Stop
72 PD
No TSI Yes D 1Room: 102 Grid: WR5-1
Not Analyzed Positive Stop
73 PD
Sample Location
Sample Analyzed
Yes/No
Estimated Quantity of
ACM
Assessment Category
Physical Condition
Friable Yes/No
Type of
ACM
% and Type of Asbestos Detected
Sample ID Potential For
Distrubance
Homogeneous Area 2
Pipe Insulation Pipe Insulation Mud on Elbows
Yes TSI Yes D 1Room: 102 Grid: WF3-2
ND - Insulation74 PD
Yes 900 Elbows TSI No D 1Room: 102 Grid: WL3-1
4% AM - Thermal Insulation 25% CH - Thermal Insulation
75 PD
No TSI No D 1Room: 102 Grid: WL5-1
Not Analyzed Positive Stop
76 PD
No TSI No D 1Room: 106 Grid: WR3-1
Not Analyzed Positive Stop
77 PD
No TSI No D 1Room: 116 Grid: WE2-1
Not Analyzed Positive Stop
78 PD
No TSI No D 1Room: 116 Grid: WF1-4
Not Analyzed Positive Stop
79 PD
No TSI No D 1Room: 102 Grid: WE12-1
Not Analyzed Positive Stop
80 PD
No TSI No D 1Room: 102 Grid: F2-7
Not Analyzed Positive Stop
81 PD
No TSI No D 1Room: 102 Grid: F7-6
Not Analyzed Positive Stop
82 PD
Sample Location
Sample Analyzed
Yes/No
Estimated Quantity of
ACM
Assessment Category
Physical Condition
Friable Yes/No
Type of
ACM
% and Type of Asbestos Detected
Sample ID Potential For
Distrubance
Homogeneous Area 3
Wallboard Drywall System
Yes M No SD XRoom: 102 Grid: WL3-1
ND - Various83 PD
Yes M No SD XRoom: 115 Grid: WF3-1
ND - Various84 PD
Yes M No SD XRoom: 114 Grid: WE1-1
ND - Various85 PD
Yes M No SD XRoom: HS201N202 Grid: WR1-1
ND - Various86 PD
Yes M No SD XRoom: 102 Grid: WL8-1
ND - Various87 PD
Sample Location
Sample Analyzed
Yes/No
Estimated Quantity of
ACM
Assessment Category
Physical Condition
Friable Yes/No
Type of
ACM
% and Type of Asbestos Detected
Sample ID Potential For
Distrubance
Homogeneous Area 4
12" X 12" Floor Tile Brown with Black Streaks
Yes M No U XRoom: 115 Grid: F3-2
ND - Floor Tile ND - Yellow Adhesive
88 PD
Yes M No U XRoom: HE111W115 Grid: F5-2
ND - Floor Tile ND - Yellow…
This is the start of the file's text. The full file is on GovTribe.