SAMDA_RFP_Q A_Set_1.pdf

PDF 155 KB Posted

Attached to
SUPPORT FOR ATMOSPHERES MODELING AND DATA ASSIMILATION SAMDA
Solicitation number
NNG15543215R
Issued by

About this file

Questions Answers

View the file

Other files

File Type Posted
SF30_Amendment_03.pdf PDF
SAMDA_RFP_Q A_Set_3.pdf PDF
Enclosure_4.pdf PDF
RFP_NNG15543215_Rev2_Page119.pdf PDF
SF30_Amd_4.pdf PDF
SAMDA_RFP_Q A_Set_2.pdf PDF
Exhibits_3-5_(GPM)Rev2.pdf PDF
RFP_NNG15543215_Rev2_Page130.pdf PDF
Exhibits_3-5_(GPM)Rev1.pdf PDF
SF30_Amendment_01.pdf PDF
ENCLOSURE_4_DL_Position_Description_Rev1.pdf PDF
RFP_NNG15543215_Rev1Pg94.pdf PDF
SF30_Amendment_02.pdf PDF
ENCLOSURE_3_HISTORICAL_DL_RATE_DATA.pdf PDF
ENCLOSURE_1_QAP.pdf PDF
ATTACHMENT_C_-_533_INSTRUCTIONS.pdf PDF
ATTACHMENT_G_-_IT_SECURITY_MANAGEMENT_PLAN.pdf PDF
RFP_NNG15543215R_SF33.pdf PDF
ATTACHMENT_K_-_PIV.pdf PDF
EXHIBITS_1-2_(CORE).pdf PDF
RFP_NNG15543215R_CoverLetter.pdf PDF
ENCLOSURE_2_RTO.pdf PDF
EXHIBITS_3-5_(GPM).pdf PDF
ATTACHMENT_A_-_SOW.pdf PDF
ATTACHMENT_E_-_SAFETY_ _HEALTH_PLAN.pdf PDF
ATTACHMENT_B_-_RATE_MATRICES.pdf PDF
RFP_NNG15543215R.pdf PDF
ATTACHMENT_H_-_OCI.pdf PDF
ATTACHMENT_D_-_CONTRACT_HISTORICAL_DATA.pdf PDF
ATTACHMENT_F_-_IT_SECURITY_APPLICABLE_DOCS.pdf PDF
ENCLOSURE_4_DL_Position_Description.pdf PDF
EXHBITS_6-13_(CORE_ _GPM).pdf PDF
EXHIBIT_14_PAST_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATTACHMENT_I_-_GFP.pdf PDF
ATTACHMENT_J_-_IAGP.pdf PDF
ENCLOSURE_3_HISTORICAL_DL_RATE_DATA.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP NNG15543215R

Questions and Answers

Question 1

RFP Reference Section J.1 E Section L.20 (a)(6)(b) Proposal Content and Page Limitations.

Question or Comment: Section J indicates that the Safety and Health Plan is due 30 days after contract award. Section L however indicates that a Safety and Health Plan is to be submitted within the Mission Suitability Volume. Please clarify.

Answer 1

The Government is not looking for a complete Health and Safety Plan to be submitted as part of the proposal within the Mission Suitability Volume. Within 30 days after contract award, the successful contractor shall submit for NASA approval a comprehensive Safety and Health Plan, which will be incorporated into the contract under Clause J.1 as Attachment E. Section L.20

(a)(6)(b) Proposal Content and Page Limitations has been revised to remove the language requesting a Safety and Health Plan be submitted as part of the proposal within the Mission

Suitability Volume.

Question 2

RFP Reference Exhibit 2-A Prime Offeror Core Requirements Elements of Cost; Exhibit 2-B

Significant Subcontractor Core Requirements Elements of Cost. Question or Comment: The

Draft RFP provided an hours section for Significant Subcontractors as part of Exhibit 2-A, which has been removed from the Final RFP. Exhibit 2-B now provides hours rows for Significant

Subcontractors. Is it the government’s intent that the significant subcontractors hours carry over from Exhibit 2-B to Exhibit 2-A or should only cost be carried forward? Please advise if the

Exhibit 2-A will be further revised.

Answer 2

Exhibit 2-A does not require revision. It is not the Government’s intent to have Significant

Subcontractors hours carried over from Exhibit 2-B to Exhibit 2-A. Only Significant

Subcontractors costs should be carried over.

Question 3

RFP Reference Section L.24 Cost Volume Instructions (pages 107 and 114). Question or

Comment: The text references Exhibits 4C and 4D for Non-Significant Subcontractors, these exhibits were not provided. Will these exhibits be provided or should exhibits 4A and 4B for

Significant Subcontractors be modified and renamed for Non-Significant Subcontractors?

Answer 3

Exhibits 3-5 (GPM) have been revised to include Exhibits 4C and 4D. Exhibits 4C and 4D should be completed for Non-Significant Subcontractors.

Question 4 In the interest of competition, would you consider removing the past performance requirement, which states that “For a prime contractor’s contract reference(s) to be considered at least minimally “relevant”, it must meet/exceed an average annual cost/fee incurred of at least $3.5M, and relevant in content.”

RFP NNG15543215R

Questions and Answers

Answer 4

Given the maximum value of the SAMDA contract, the Government believes contracts with an average annual cost/fee of $3.5M, and relevant in content are a good representation of the size, scope, and complexity necessary to demonstrate an ability to perform successfully as a prime contractor for SAMDA. Therefore, no change will be made.

Question 5

RFP Reference Section L.24 Cost Volume Instructions, page 110 (d) Core Requirements –

Prime Elements of Cost “…a separately identified and labeled Exhibit 2-A shall be submitted from the Prime Offeror”. Question or Comment: Is the intent to have an Exhibit 2-A (Prime

Offeror Core Requirements Element of Cost) with combined Prime and Significant

Subcontractors element of cost data and a separate Exhibit 2-A with Prime only elements of cost?

Answer 5

Exhibit 2-A should be completed for all Prime Contractors, and should include the Prime

Offeror’s elements of cost for the core requirements. Exhibit 2-B should be completed for all

Significant Subcontractors, and should include the Significant Subcontractor’s elements of cost for core requirements.

Question 6

RFP Reference Enclosure 4. Question or Comment: In Enclosure 4, some of the Position

Descriptions include asterisks in the Required Education as follows: “Ph.D. degree, or equivalent*”, “M.S. degree, or equivalent**”, “B.S. degree, or equivalent**” and “B.S. degree, or equivalent***”. These asterisks typically denote a footnote that is applicable to the text but no footnotes are provided in Enclosure 4. Can you provide the meaning of the asterisks in the positions descriptions?

Answer 6

Enclosure 4, Direct Labor Position Descriptions, has been revised to include footnotes that correspond to the applicable text.

File details come from the government source that posted it. Updated .