NMCA Memorial Day Ceremony Rentals 2026 SOW.docx

DOCX document 420 KB Posted

Attached to
36C78626Q50139 Memorial Day Rentals - NMCA -- W071
Solicitation number
QSE--36C78626Q50139
Issued by

About this file

This is a Statement of Work (SOW) for equipment rental and support services for the National Memorial Cemetery of Arizona's 2026 Memorial Day Ceremony. The ceremony will be held on May 25, 2026, at the cemetery's outdoor main stage ceremony area located at 2929 E. Pinnacle Peak Road, Phoenix, AZ 85024. The contractor must deliver and set up all equipment on May 24, 2026, and remove equipment and restore the site by May 26, 2026, with specific times to be coordinated with the Contracting Officer's Representative (COR).

The contractor shall provide six 20-foot by 20-foot tents properly secured with concrete weights or anchoring systems; 1,800 commercial-grade folding chairs arranged in rows as directed; an outdoor audio system with capacity to cover approximately 34,000 square feet, including three wireless microphones, six wired microphones, speakers, mixer/amplification equipment, and technician support during the ceremony; eight standard portable toilets, two ADA-compliant portable toilets, and two portable handwashing stations with foot pumps positioned at designated locations throughout the cemetery grounds. The contractor is responsible for all labor, supervision, transportation, materials, tools, and equipment necessary to perform these services and must comply with all federal, state, and local safety regulations. The Quality Assurance Surveillance Plan establishes acceptance criteria requiring 100 percent on-time delivery and setup, no defective equipment, clear audio coverage with no major failures, and 100 percent debris removal and site restoration.

View the file

Other files

File Type Posted
Memorial Day Map - NMCA.pdf PDF
SolicitationAmendment0001.pdf PDF
QSE 36C78626Q50139.pdf PDF
P07 Wage Determination 2015-5469.pdf PDF
Instructions to Offerors_Evaluations - LPTA.docx DOCX document
PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
NMCA Memorial Day Ceremony Rentals 2026 SOW.docx DOCX document
Solicitation.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
P07 Wage Determination 2015-5469.pdf PDF
Instructions to Offerors_Evaluations - LPTA.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Memorial Day Ceremony Equipment Rental and Support Services National Memorial Cemetery of Arizona 2929 E. Pinnacle Peak Road Phoenix, AZ 85024

1.0 Background

The National Memorial Cemetery of Arizona will host its annual Memorial Day Ceremony honoring the men and women who served in the United States Armed Forces. The Government requires rental, delivery, setup, and removal of tents, seating, audio equipment, and sanitation facilities to support the event. The Contractor shall provide all labor, supervision, transportation, materials, tools, and equipment necessary to perform the services described in this Statement of Work.

2.0 Place of Performance

National Memorial Cemetery of Arizona 2929 E. Pinnacle Peak Road Phoenix, AZ 85024

3.0 Period of Performance

Task
Date
Delivery and Setup
May 24, 2026
Memorial Day Ceremony
May 25, 2026 (8AM)
Tear Down and Removal
May 26, 2026

Specific delivery and removal times shall be coordinated with the Contracting Officer’s Representative (COR).

4.0 Scope of Services

The Contractor shall provide equipment rental, delivery, installation, and removal for the Memorial Day Ceremony. All tents, seating, and the Public Address (PA) system shall be installed at the cemetery’s designated outdoor main stage ceremony area as directed by the COR.

4.1 Tents

The Contractor shall provide and install six (6) 20 ft x 20 ft tents. All tents shall be installed at the outdoor main stage ceremony area. Tents shall be properly secured using approved concrete weights or anchoring systems and must be clean and in good condition.

4.2 Seating

The Contractor shall provide and set up 1,800 folding chairs at the outdoor main stage ceremony area. Chairs shall be commercial grade, clean, uniform in appearance, and arranged in rows as directed by the COR.

4.3 Public Address (PA) System

The Contractor shall provide and install an outdoor audio system capable of covering approximately 34,000 square feet at the outdoor main stage ceremony area. The system shall include three (2) wireless microphones, six (4) wired microphones, speakers sufficient for clear audio coverage, mixer/amplification equipment, and technician support during the ceremony .

4.4 Portable Restroom Facilities

The Contractor shall provide delivery and setup of eight (8) standard portable toilets, two (2) ADA portable toilets, and two (2) portable handwashing stations with foot pump. Portable restroom facilities shall be installed at designated locations throughout the cemetery grounds. Placement locations will be identified by the COR. A map identifying the required placement locations for portable restroom units will be provided as an attachment to the contract.

4.5 Delivery and Setup

The Contractor shall deliver all equipment on May 24, 2026 and complete setup prior to the ceremony. The Contractor shall coordinate delivery access routes and staging with the COR.

4.6 Tear Down and Removal

The Contractor shall remove all rented equipment on May 26, 2026 and restore the site to its original condition. All debris generated during setup or removal shall be removed from the site.

5.0 Contractor Responsibilities

The Contractor shall provide all labor, supervision, transportation, materials, and equipment required to perform the services. The Contractor shall coordinate setup locations with the COR, ensure all equipment is safe and properly secured, comply with all federal, state, and local safety regulations, and maintain a clean worksite.

6.0 Inspection and Acceptance

The COR will inspect all equipment during delivery and prior to the ceremony to ensure proper setup and operation. A final inspection will occur after removal to ensure the worksite has been cleaned and restored.

7.0 Attachments

7.1 Attachment 1 – Quality Assurance Surveillance Plan

7.2 Attachment 2 – Portable restroom locations map

Attachment 1 Quality Assurance Surveillance Plan (QASP)

Performance Objective
Performance Standard
Surveillance Method
Acceptable Quality Level (AQL)
Delivery and Setup
All equipment delivered and installed on scheduled date
COR Inspection
100% On-Time
Equipment Condition
All equipment clean and operational
Visual Inspection
No defective equipment
Audio System Performance
Clear sound coverage for ceremony area
Functional Test
No major audio failures
Site Restoration
All equipment removed and site left clean
Post-Service Inspection
100% debris removal

Attachment 2 Portable restroom’s locations Map image1.jpeg

File details come from the government source that posted it. Updated .