This is a Statement of Work (SOW) for equipment rental and support services for the National Memorial Cemetery of Arizona's 2026 Memorial Day Ceremony. The ceremony will be held on May 25, 2026, at the cemetery's outdoor main stage ceremony area located at 2929 E. Pinnacle Peak Road, Phoenix, AZ 85024. The contractor must deliver and set up all equipment on May 24, 2026, and remove equipment and restore the site by May 26, 2026, with specific times to be coordinated with the Contracting Officer's Representative (COR).
The contractor shall provide six 20-foot by 20-foot tents properly secured with concrete weights or anchoring systems; 1,800 commercial-grade folding chairs arranged in rows as directed; an outdoor audio system with capacity to cover approximately 34,000 square feet, including three wireless microphones, six wired microphones, speakers, mixer/amplification equipment, and technician support during the ceremony; eight standard portable toilets, two ADA-compliant portable toilets, and two portable handwashing stations with foot pumps positioned at designated locations throughout the cemetery grounds. The contractor is responsible for all labor, supervision, transportation, materials, tools, and equipment necessary to perform these services and must comply with all federal, state, and local safety regulations. The Quality Assurance Surveillance Plan establishes acceptance criteria requiring 100 percent on-time delivery and setup, no defective equipment, clear audio coverage with no major failures, and 100 percent debris removal and site restoration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Memorial Day Map - NMCA.pdf | ||
| SolicitationAmendment0001.pdf | ||
| QSE 36C78626Q50139.pdf | ||
| P07 Wage Determination 2015-5469.pdf | ||
| Instructions to Offerors_Evaluations - LPTA.docx | DOCX document | |
| PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document | |
| NMCA Memorial Day Ceremony Rentals 2026 SOW.docx | DOCX document | |
| Solicitation.pdf | ||
| PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document | |
| P07 Wage Determination 2015-5469.pdf | ||
| Instructions to Offerors_Evaluations - LPTA.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Memorial Day Ceremony Equipment Rental and Support Services National Memorial Cemetery of Arizona 2929 E. Pinnacle Peak Road Phoenix, AZ 85024
1.0 Background
The National Memorial Cemetery of Arizona will host its annual Memorial Day Ceremony honoring the men and women who served in the United States Armed Forces. The Government requires rental, delivery, setup, and removal of tents, seating, audio equipment, and sanitation facilities to support the event. The Contractor shall provide all labor, supervision, transportation, materials, tools, and equipment necessary to perform the services described in this Statement of Work.
2.0 Place of Performance
National Memorial Cemetery of Arizona 2929 E. Pinnacle Peak Road Phoenix, AZ 85024
3.0 Period of Performance
| Task |
| Date |
| Delivery and Setup |
| May 24, 2026 |
| Memorial Day Ceremony |
| May 25, 2026 (8AM) |
| Tear Down and Removal |
| May 26, 2026 |
Specific delivery and removal times shall be coordinated with the Contracting Officer’s Representative (COR).
4.0 Scope of Services
The Contractor shall provide equipment rental, delivery, installation, and removal for the Memorial Day Ceremony. All tents, seating, and the Public Address (PA) system shall be installed at the cemetery’s designated outdoor main stage ceremony area as directed by the COR.
4.1 Tents
The Contractor shall provide and install six (6) 20 ft x 20 ft tents. All tents shall be installed at the outdoor main stage ceremony area. Tents shall be properly secured using approved concrete weights or anchoring systems and must be clean and in good condition.
4.2 Seating
The Contractor shall provide and set up 1,800 folding chairs at the outdoor main stage ceremony area. Chairs shall be commercial grade, clean, uniform in appearance, and arranged in rows as directed by the COR.
4.3 Public Address (PA) System
The Contractor shall provide and install an outdoor audio system capable of covering approximately 34,000 square feet at the outdoor main stage ceremony area. The system shall include three (2) wireless microphones, six (4) wired microphones, speakers sufficient for clear audio coverage, mixer/amplification equipment, and technician support during the ceremony .
4.4 Portable Restroom Facilities
The Contractor shall provide delivery and setup of eight (8) standard portable toilets, two (2) ADA portable toilets, and two (2) portable handwashing stations with foot pump. Portable restroom facilities shall be installed at designated locations throughout the cemetery grounds. Placement locations will be identified by the COR. A map identifying the required placement locations for portable restroom units will be provided as an attachment to the contract.
4.5 Delivery and Setup
The Contractor shall deliver all equipment on May 24, 2026 and complete setup prior to the ceremony. The Contractor shall coordinate delivery access routes and staging with the COR.
4.6 Tear Down and Removal
The Contractor shall remove all rented equipment on May 26, 2026 and restore the site to its original condition. All debris generated during setup or removal shall be removed from the site.
5.0 Contractor Responsibilities
The Contractor shall provide all labor, supervision, transportation, materials, and equipment required to perform the services. The Contractor shall coordinate setup locations with the COR, ensure all equipment is safe and properly secured, comply with all federal, state, and local safety regulations, and maintain a clean worksite.
6.0 Inspection and Acceptance
The COR will inspect all equipment during delivery and prior to the ceremony to ensure proper setup and operation. A final inspection will occur after removal to ensure the worksite has been cleaned and restored.
7.0 Attachments
7.1 Attachment 1 – Quality Assurance Surveillance Plan
7.2 Attachment 2 – Portable restroom locations map
Attachment 1 Quality Assurance Surveillance Plan (QASP)
| Performance Objective |
| Performance Standard |
| Surveillance Method |
| Acceptable Quality Level (AQL) |
| Delivery and Setup |
| All equipment delivered and installed on scheduled date |
| COR Inspection |
| 100% On-Time |
| Equipment Condition |
| All equipment clean and operational |
| Visual Inspection |
| No defective equipment |
| Audio System Performance |
| Clear sound coverage for ceremony area |
| Functional Test |
| No major audio failures |
| Site Restoration |
| All equipment removed and site left clean |
| Post-Service Inspection |
| 100% debris removal |
Attachment 2 Portable restroom’s locations Map image1.jpeg