NIST COVID Procedures.pdf

PDF 89 KB Posted

Attached to
Manufacturing, Installation, and Testing of Double-Walled Warm Deuterium
Solicitation number
1333ND21QNB610162
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0005.docx DOCX document
AMENDMENT 0004.docx DOCX document
Amendment 0002.docx DOCX document
Drawing Number 002-3073.pdf PDF
Dawing Number 002-2858.pdf PDF
Amendment 0001.docx DOCX document
RFQ 1333ND21QNB610162.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIST On-Site Mitigation of COVID-19 Exposure

The following information is not specifically applicable to the solicitation process but will become applicable to the awardee of this requirement.

Due to ongoing COVID-19 access restrictions, there is limited site access of the NIST facilities. Any planned visits to the NIST site will require safety procedures, which can be found at the following link.

https://www.nist.gov/about-nist/visit/nist-visitor-and-contractor-protocols-mitigating-covid-19-exposure-nist-campuses https://www.nist.gov/about-nist/visit/nist-visitor-and-contractor-protocols-mitigating-covid-19-exposure-nist-campuses https://www.nist.gov/about-nist/visit/nist-visitor-and-contractor-protocols-mitigating-covid-19-exposure-nist-campuses

File details come from the government source that posted it. Updated .