AMENDMENT 0005.docx
DOCX document 14 KB Posted
- Solicitation number
- 1333ND21QNB610162
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0004.docx | DOCX document | |
| Amendment 0002.docx | DOCX document | |
| Drawing Number 002-3073.pdf | ||
| Dawing Number 002-2858.pdf | ||
| Amendment 0001.docx | DOCX document | |
| NIST COVID Procedures.pdf | ||
| RFQ 1333ND21QNB610162.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0005
RFQ NUMBER: 1333ND21QNB610162
TITLE: Manufacturing, Installation, and Testing of Double -Walled Warm Deuterium
QUESTION: Engineering has come up with another question regarding the design of the pipe. Is the helium pipe is going to be joined by jumper hoses OR will each section of pipe have a “clam-shell” design joining the helium jacket?”
RESPONSE: The “clam shell” design is correct.
QUESTION: Clarification regarding the flow calculations; On page 18 of 77, section 5.3: It states that the contractor shall proposed the final pipe size based on flow rates of 13 g/s. Please clarify what “g/s” stands for.”
RESPONSE: Grams per second
QUESTION: If 3072 & 3073 are the proposed paths then what is drawings 002-2858 & 002-3071?
RESPONSE: 3071 is an assembly drawing that includes parts 3072 and 3073 as indicated in the bottom right corner. 2858 shows the piping for the charging station, which connects separately to the large ballast tank as shown in Figure 3 of the Technical Specifications document.