AMENDMENT 0005.docx

DOCX document 14 KB Posted

Attached to
Manufacturing, Installation, and Testing of Double-Walled Warm Deuterium
Solicitation number
1333ND21QNB610162
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0004.docx DOCX document
Amendment 0002.docx DOCX document
Drawing Number 002-3073.pdf PDF
Dawing Number 002-2858.pdf PDF
Amendment 0001.docx DOCX document
NIST COVID Procedures.pdf PDF
RFQ 1333ND21QNB610162.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0005

RFQ NUMBER: 1333ND21QNB610162

TITLE: Manufacturing, Installation, and Testing of Double -Walled Warm Deuterium

QUESTION: Engineering has come up with another question regarding the design of the pipe. Is the helium pipe is going to be joined by jumper hoses OR will each section of pipe have a “clam-shell” design joining the helium jacket?”

RESPONSE: The “clam shell” design is correct.

QUESTION: Clarification regarding the flow calculations; On page 18 of 77, section 5.3: It states that the contractor shall proposed the final pipe size based on flow rates of 13 g/s. Please clarify what “g/s” stands for.”

RESPONSE: Grams per second

QUESTION: If 3072 & 3073 are the proposed paths then what is drawings 002-2858 & 002-3071?

RESPONSE: 3071 is an assembly drawing that includes parts 3072 and 3073 as indicated in the bottom right corner. 2858 shows the piping for the charging station, which connects separately to the large ballast tank as shown in Figure 3 of the Technical Specifications document.