NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx
DOCX document 19 KB Posted
- Attached to
- Z2DA--CON Enhance Electronic Security and Safety Systems at Fort Harrison, MT 436-20-101 (VA-23-00088707)
- Solicitation number
- 36C25924R0004
About this file
This document provides a calculation worksheet for self-performed and subcontracted work on federal contracts. The worksheet requires contractors bidding on General Construction projects with NAICS code 236220 to perform at least 15% of the total contract costs using their own employees or the employees of other eligible service-disabled veteran-owned small businesses. Contractors must provide a breakdown of personnel and material/equipment costs by specification division. Total self-performed personnel costs are calculated as a percentage of total personnel costs for both the prime contractor and all subcontractors, excluding those not performed by SDVOSB companies. The contractor must certify the accuracy of the representations in the worksheet. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs to enhance electronic security and safety systems at Fort Harrison, Montana.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
IAW VARR 852.219 -10 Limitations on Subcontracting, Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service-disabled veteran-owned small business concerns. Below is a suggested format.
| Specification Division and name |
| SDVOSB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
| Sub Total (Personnel Costs, Material/Equipment Costs) |
| $ |
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $_________________
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $__________________ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | __________% |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
| ________________________________________________ | ___________ |
| (Signature and Typed Name of Authorized Representative) | Date |
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .