36C25924R0004 0005.pdf
PDF 157 KB Posted
- Attached to
- Z2DA--CON Enhance Electronic Security and Safety Systems at Fort Harrison, MT 436-20-101 (VA-23-00088707)
- Solicitation number
- 36C25924R0004
About this file
This document provides questions and answers regarding a solicitation to enhance electronic security and safety systems at Fort Harrison, Montana. The solicitation seeks proposals for a new physical access control system, security camera infrastructure, public address systems, a duress system, and command center upgrades. Proposals are due on January 18, 2024 by 10:00 AM Central Time to the contracting officer. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is the contracting agency. The document clarifies that a completely new system should be proposed without reuse of existing equipment. Locations for new infrastructure are identified by building number.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 6
436-20-101
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
To all Offerors/Bidders
36C25924R0004
01-08-2024
X
X X
1/18/2024 10:00 AM Central Time (CT)
X 1 (one)
The purpose of this amendment is to officially and effectively make the following changes/updates listed below:
1. Post the second RFI questions and answers (see attachment below).
2. Extends the date for all proposals from 1/11/2024 to 1/18/2024. All proposals are due on 1/18/2024 to the Contract Specialist, Angel Waalkes, at angela.waalkes@va.gov, by 10:00 AM CT.
All other terms and conditions remain the same.
Lance Davis Contracting Officer
A.1 Attachments
DEPARTMENT OF VETERANS AFFAIRS
VHA Network Contracting Office 19 Rocky Mountain Acquisition Center 6162 South Willow Drive, Suite 300
Greenwood Village, CO 80111
CONTRACTOR Q&As #2
Question No. 1A: Both RFI 0, #3c and RFI 0, #5 reference RMRVAMC. RMRVAMC is the Rocky Mountain VA Medical Center is in Aurora Colorado. Please clarify if these questions/specs are based off the correct facility, Ft Harrison VAMC. This also may explain why the photo of the “Police Command Center” isn’t recognized.
Answer No. 1A: During design, the regional IT requested consistency throughout the region and use the same spec as the Denver VA. We used the same spec however we missed the reference of RMRVAMC as meaning Denver and should have noted this applies to VA Ft Harrison.
Question No. 2A: RFI #0, #1a indicates that the current PACS System Headend is “Lenel Onguard”. It is our understanding that the existing/current system is a Software House PACS platform. Please verify the existing/current PACS platform.
Answer No. 2A: Provide a completely new system. Do not plan on reuse of existing. Note Basis of design on sheet E-002.
Question No. 3A: RFI #0, #1b indicates that the current PACS system card readers w/ keypads are “Veridt 900W2036”. Historically this brand of card reader has not been used at the Ft.
Harrison VA. Please provide the locations where this brand of card reader is being used/reused in the VA.
Answer No. 3A: Provide a completely new system. Do not plan on reuse of existing. Note Basis
Question No. 4A: RFI #0, #1c indicates that the current PACS system card readers w/ keypads are “HID RPK40”. Please specify which RPK40 card reader is being used, and type for the VA’s PIV class card code.
Answer No. 4A: Provide a completely new system. Do not plan on reuse of existing. Note Basis
Question No. 5A: RFI #0, #1d indicates that the current PACS system uses “Kantech T-Rex-XL Request to Exit Detectors w audible alarm”. Currently most of the REX sensors are not alarmed, and mainly Bosch. Does the VA want alarmed request to exit sensors?
Answer No. 5A: Follow specifications. There are various situations where an alarm is required.
Question No. 6A: RFI #0, #2a indicates that the current Security Camera Surveillance includes “Milestone System Controller w BreifCam plugin for searchable analytics.” Please verify if CMS is indeed Milestone, and not Exacq for CMS.
Answer No. 6A: Provide a completely new system. Do not plan on reuse of existing. Note Basis
Question No. 7A: RFI #0, #2e indicates that the current Security Camera Surveillance includes “All cameras are IP based and run PoE directly from OIT switches…” Is there a specification on type of switch gear that is not listed on the provided link in the specifications? There is a list of manufactures but no specific equipment spec.
Answer No. 7A: Provide a completely new system. Do not plan on reuse of existing. Note Basis
Question No. 8A: RFI #0, #3a indicates that the current P.A. “Biamp/Vocia is maintained by a different vendor. It is integrated with Milestone Software and their Rauland 5 Nurse Call.” Please verify current brand of Nurse call and or current vendor for design coordination. Please verify if CareHawk is still the current vendor/brand for the PA system.
Answer No. 8A: Provide a completely new system. Do not plan on reuse of existing. Note Basis
Question No. 9A: RFI #0, #4a indicates that the current Duress System is “controlled by Lenel and is physically cabled with CAT 6 UTP to each location requiring a button.” Lenel is currently not on this VA campus. Please verify. Please verify if Lynx duress systems is currently being used on FT Harrison campus with wireless or USB duress buttons.
Answer No. 9A: Provide a completely new system. Do not plan on reuse of existing. Note Basis
Question No. 10A: RFI #0, #5a indicates that the current “Command Center is located in the basement and has an equipment room adjacent to the space to house servers and equipment.”
Is room B-19 the current equipment room?
Answer No. 10A: Per drawing B-30 as shown. Drawing EP-111 and EI103A.
Question No. 11A: RFI #0, #6 includes a link for “HSPD12 approved products”. This link takes you to ID Management “Page not found”. Please provide a functional link for the HSPD12 approved products.
Answer No. 11A: HSPD-12 Product and Service Components | GSA (https://www.gsa.gov/technology/it-contract-vehicles-and-purchasing-programs/mas-it/hspd12-product-and-service-components)
Question No. 12A: RFI #1 response indicates that “No, PACs will be its own stand-alone system, but will be able to interface with VA systems. Contractor will provide a complete system.” Feenics is a PACS platform that competes with any other system vendor that could https://www.gsa.gov/technology/it-contract-vehicles-and-purchasing-programs/mas-it/hspd12-product-and-service-components propose for this RFP. FICO is currently installing this system under another contract. Since Feenics is an approved FIPS compliant brand according to idmanagement.gov, this would give a FICO a price advantage over other companies that are bidding this project, since they would not need to bid any new panels in which they have already been paid to install. a. How many Feenics panels are currently installed/will be installed that are new? b. Please provide the locations of these new Feenics panels. c. Are the Feenics panels Mercury based?
Answer No. 12A: As noted in E-601 the only existing cable and card readers are in buildings 169 and 172. It is also noted that the controllers are to be changed to match the new ones provided under this contract so all will be new. Note Basis of Design on sheet E-002.
Question No. 13A: RFI #3 indicates that CLIN 0006 on the Price Schedule has been updated a
(1) Job, from a Unit Price. It further lists items to be included in the Job such as cameras and card readers. Our interpretation was that CLIN 0006 was for the PAC System and CLIN 0004 was for the Security Camera Systems. a. Do you want the Security Cameras included in CLIN 0006? b. What would you like included in CLIN 0004?
Answer No. 13A: CLIN 0004 Security Camera Systems in accordance with paragraph I.D.(7) of the statement of work.
I.D.(7) Security Camera Systems: Enhance physical security on campus installing new camera infrastructure per the contract drawings and specifications. The existing camera infrastructure is in disarray, and many are inoperable. Placements for the new infrastructure are primarily in corridors, lobby areas, and other spaces that are required to be under video surveillance, per the Physical Security and Resiliency Design Manual (PSRDM). Existing camera infrastructure is wired to many different IT closets throughout campus. An existing rack contains a single camera server, currently running exterior cameras along with a few analog elevator cameras. This current system does not have the capability to support new cameras brought online. Due to this, expansion of existing head end infrastructure to accommodate both the existing and new cameras is also a requirement. A single point of use shall be utilized by on-site law enforcement through 24/7 video monitoring services (dispatch center). The ability of the system to be accessed by other departments (inpatient mental health) is a requirement of the new system. Site investigation is necessary to define existing conditions; contractor to verify hardware, software applications, and IT systems capacities. Network video recorders, provided by the vendor, are required. The network video recorders must be capable of recording and storing the last 30 days’ worth of video. All hardware shall have emergency battery backup power. Video monitoring shall be required in all IT closets to meet compatibility. This item is in buildings 141, 154A, 154B (Madison), 169, 154, 170, 171, 16, 20 and site.
CLIN 0006 Physical Access Control System in accordance with paragraph I.D.(9) of the statement of work.
I.D.(9) Physical Access Control System: Expand existing Federal Information Processing Standard (FIPS) 201 compliant Personnel Access Control System (PACS). System shall be USAccess, or VA approved equivalent product, capable of hosting several systems of a non-proprietary nature that can be upgraded for future compatibility. USAccess Program under GSA HSPD-12 Managed Service Office (MSO) established the USAccess program as an efficient way to issue common HSPD-12 approved credentials to their employees and Contractors. Total installation to capture existing areas that currently have no PACS readers installed will include up to 50 locations. This line item is priced per one location or one (1) each (ea) (statement of work amended as per solicitation amendment P0002). This item is in buildings 141, 154A, 154B (Madison), 169, 154, 170, 171, 16, 20 and site.
Question No. 14A: RFI #15 response indicates to run all Security Access Detection cable in “Complete Conduit”. The EHRM Project Cable is specified to be installed in cable tray and J- Hooks, and conduit only above hard-lid ceilings. Existing ductwork, conduit, piping, etc. above the drop ceiling prohibits installing “Complete Conduit” cost affectively for the Security Access Detection System. Please allow the Security Access Detection System cable to be installed in the existing cable tray and J-Hook systems.
Answer No. 14A: As shown on previous response the requirement is conduit to cable tray.
Answer No. 15: Follow VA Spec 27 05 33
EXECUTION
EQUIPMENT INSTALLATION AND REQUIREMENTS
Raceways typically required for cabling systems unless otherwise indicated:
System Specification Section Installed Method Grounding 27 05 26 Conduit Not Required Control, Communication and Signal Wiring
27 10 00 Complete Conduit Allowed in Non-Partitioned Cable Tray or Cable Ladders
Communications Structured Cabling
27 15 00 Conduit to Cable Tray Partitioned Cable Tray
Master Antenna Television Equipment and Systems
27 41 31 Conduit to Cable Tray, Partitioned Cable Tray
Public Address and Mass Notification Systems
27 51 16 Complete conduit
Intercommunications and Program systems
27 51 23 Conduit to Cable Tray, Partitioned Cable Tray
Nurse Call 27 52 23 Complete Conduit Miscellaneous Medical Systems
27 52 41 Complete Conduit
Distributed Radio Antenna Equipment and System
27 53 19 Conduit to Cable Tray, Partitioned Cable Tray
Grounding and Bonding for Electronic Safety and Security
28 05 26 Conduit Not Required Unless Required by Code
Physical Access Control System
28 13 00 Conduit to Cable Tray Partitioned Cable Tray
Physical Access Control System and Database Management
28 13 16 Conduit to Cable Tray Partitioned Cable Tray
Security Access Detection 28 13 53 Complete Conduit Intrusion Detection System 28 16 00 Conduit to Cable Tray, Partitioned Cable Tray Video Surveillance 28 23 00 Complete Conduit Electronic Personal Protection System
28 26 00 Conduit to Cable Tray, Partitioned Cable Tray
Fire Detection and Alarm 28 31 00 Complete Conduit
Question No. 15A: RFI #16 response indicates to “run needed power to pole”. Please provide Electric Panel and Circuit for this required power.
Answer No. 15A: Sheet E-601 has a number of panels available.
Question No. 16A: RFI #17 response indicates “Contractor to plan running new power”. a.
Please provide Electric Panel and Circuit for this required power. b. Can we use existing conduits for lighting circuits to pull the power for the cameras?
Answer No. 16A: a. Sheet E-601 has a number of panels available. b. We expected that most of these would be POE. If not, then run new power.
Question No. 17A: RFI #75 Is the government able to extend the solicitation’s due date? Please extend the bid date again, with the holiday season upon us, many manufacturers, distributors, and engineers are on vacation over the next 2-week. Communication for the VA’s benefit of accurate bids, and project pricing will be better accomplished with more bid time.
Answer No. 17A: The date for proposals has been extended to 1/18/2024 at 10:00 AM Central Time.
Question No. 18A: What does the “N” symbol on sheet EI104A stand for?
Answer No. 18A: The circle with the ‘N’ is a nurse call light; the square is nurse call stations;
the square with the dot is nurse call push buttons due to the mental health aspect. The nurse call is separate from the duress system.