Att 5 FTH Relocation of Telecommunications Closets Map Drawings Vol 1 Pt 4.pdf
PDF 9 MB Posted
- Attached to
- Z2DA--CON Enhance Electronic Security and Safety Systems at Fort Harrison, MT 436-20-101 (VA-23-00088707)
- Solicitation number
- 36C25924R0004
About this file
This is a solicitation for electronic security and safety systems enhancements at Fort Harrison VA Medical Center in Montana. The solicitation is seeking proposals to upgrade security cameras, access control, intrusion detection, and duress/panic alarm systems across multiple buildings. Proposals are due by January 2023, with award anticipated in March 2023. The contract will have one base year and four option years, and will be a 100% small business set-aside. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is the contracting agency.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OS
J
WAP
W
AP
169-AE-301
8 5
NORTH
SCALE: 1/2" = 1'-0"
24" 18" 12" 6" 24" 48"0"
SALLY
130 SF
TR
EXAM
26-02
06-01
09-07
09-24
06-01
06-01
06-01
26-03
GROUP
EXAM
05-02
169-224.0
A-3
08-03
LEVEL 1
100' - 0"
TR
06-01
09-01
09-18
LEVEL 1
100' - 0"
TR
169-224.0
26-04
06-01
09-18
09-01
CLEAR
1' - 0"
S
26-05
LEVEL 1
100' - 0"
TR
06-01
09-01
09-18
26-11
26-05
LEVEL 1
100' - 0"
TR
8'
6"
06-01
09-18
09-01
05-02
26-12 E
26-05
23-05
HALL
NURSE WORK
56 SF
STRG
B173B
09-28
09-29
NURSE STATION
HALL
(E ) F
LO
OR
(N ) S
HEET
VIN
YL
10-05
STRG
B173A
169-B173A.0
09-10
ENV.
HALL
ON-CALL
TOILET
93 SF
STORAGE
(EXISTING TR)
169-164.0
09-29
09-28
09-18
(E) FLOOR
(N) SHEET
VINYL
10-05
09-10
EXAM
TR
SALLY
HALL
GROUP
EXAM
EXP.
11' - 0"
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
NORTH
22-02
PAINT EXPOSED CEILING
TO MATCH WALL SPEC
AND COLOR, TYP.
HALL
STRG
B173B
NURSE WORK
NURSE STATION
HALL
ACT-2
8' - 0"
22-01
HALL
ENV.
ON-CALL
TOILET
STORAGE
(EXISTING TR)
ACT-2
8' - 0" 22-01
2x2 LIGHT FIXTURE
2x4 LIGHT FIXTURE
STRIP LIGHT FIXTURE
6" RECESSED CAN LIGHT FIXTURE
SUPPLY AIR DIFFUSER
RETURN AIR VENT
EXHAUST FAN
REFLECTED CEILING PLAN LEGEND
5/8" GYP. BOARD CEILING AFFIXED TO 3 5/8" MTL STUDS
2'x4' SUSPENDED ACOUSTIC CEILING TILE CEILING
GYP-1
ACT-2
2'x2' SUSPENDED ACOUSTIC CEILING TILE CEILINGACT-1
1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING,
AND SPECIAL SYSTEMS.
2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING
LAYOUTS.
3. SEE SHEET 00-GI-006 FOR TYPICAL ACOUSTICAL PANEL CEILING
DETAILS
REFLECTED CEILING PLAN NOTES
FLOOR PLAN LEGEND
CARD READER, REF TELECOM DRAWINGS
DATA PORT, REF TELECOM DRAWINGS
OUTLET, REF ELEC DRAWINGS
WIRELESS ACCESS POINT, REF TELECOM DRAWINGS
ELEC PANEL, REF ELEC DRAWINGS
(E) FIRE EXTINGUISHER LOCATION
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
NORTH
FLOOR PLAN NOTES
1. SEE G SERIES SHEETS FOR BALANCE OF PLAN GENERAL NOTES.
2. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION. ALL INFORMATION REGARDING
EXISTING CONDITIONS IS BASED UPON OWNER-SUPPLIED
DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD CONDITIONS.
3. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND
ALL WALL MOUNTED EQUIPMENT OR ACCESSORIES; COORDINATE
LOCATIONS, SEE VA AND LOCAL STANDARDS FOR SPECS.
4. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF
STUD, UNLESS OTHERWISE NOTED.
5. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND
REPAIR ALL INCONSISTENCIES IN FLOOR ELEVATIONS.
6. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO
PROVIDE SUITABLE SUBSTRATE FOR FINISHES.
7. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING
ADA ACCESS CONTROL.
8. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND
BOTTOM, AND PENETRATIONS, AND INSTALL PUTTY PADS AROUND
ELECTRICAL BOXES WHERE PARTITION CONTAINS ACOUSTICAL
INSULATION.
9. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED
STRUCTURE UNLESS NOTED OTHERWISE, NO CEILINGS SPECIFIED.
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:0
:0
P
M
169-AE-301
169-ENLARGED PLANS
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 169
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/2" = 1'-0"1
TR 224 ENLARGED PLAN
1/2" = 1'-0"3
TR224 SOUTH ELEVATION
1/2" = 1'-0"5
TR 224 EAST ELEVATION
1/2" = 1'-0"8
TR 224 NORTH ELEVATION
1/2" = 1'-0"10
TR 224 WEST ELEVATION
1/4" = 1'-0"2
STORAGE B173B ENLARGED PLAN
1/4" = 1'-0"7
STRG 164 ENLARGED FLOOR PLAN
1/4" = 1'-0"6
TR 224 REFLECTED CEILING PLAN
1/4" = 1'-0"4
STRG B173B REFLECTED CEILING PLAN
1/4" = 1'-0"9
STRG 164 REFLECTED CEILING PLAN
05-02 SECURITY GRILL: 2" x 2" x 10GA WIRE MESH WELDED TO 1 1/2" x 1 1/4" x 13GA
ROLL FORMED ANGLE FRAME; PROVIDE 3" CLIPS, ANCHOR DIRECTLY
THROUGH PLYWOOD ONTO EXISTING WALL
06-01 INSTALL 3/4" AC GRADE OR BETTER FIRE RETARDANT PLYWOOD; PAINT
WITH TWO COATS OF SEMI-GLOSS BRIGHT WHITE FIRE RETARDANT PAINT;
MOUNT BOTTOM OF PLYWOOD 6" A.F.F., TOP OF PLYWOOD AT 8'-6" A.F.F.; DO
NOT PAINT OVER STAMPED PLYWOOD RATING
08-03 ADA DOOR CLEARANCES SHOWN DASHED
09-01 PAINT WALL ABOVE PLYWOOD WITH SEMI-GLOSS PAINT, COLOR TO MATCH
PLYWOOD PAINT.
09-07 INSTALL STATIC DISSIPATIVE RESILIENT FLOORING
09-10 PAINT FULL LENGTH OF WALL TO NEAREST EXTERIOR OR INTERIOR
CORNER, COLOR TO MATCH EXISTING WALLS.
09-18 6" HIGH COVED RUBBER WALL BASE, COLOR TO BE SELECTED FROM
MANUFACTURER'S STANDARD SELECTION
09-24 PATCH DAMAGED WALLS PREPARE TO RECEIVE NEW FINISHES.
09-28 PAINT ENTIRE ROOM, COLOR TO MATCH EXISTING
09-29 INSTALL NEW FLOORING TO MATCH EXISTING SIMILAR USE ROOM
10-05 .040" FRP WALL PROTECTION, 48" HIGH AT PERIMETER OF ROOM, MOUNTED
ABOVE 6" RESILIENT BASE. PROVIDE 'H' AND 'J' TRIM, SEAL TOP TO WALL
22-01 FIRE SUPPRESSION SPRINKLER HEAD SHOWN FOR REFERENCE ONLY; FIRE
SUPPRESSION CONTRACTOR TO VERIFY ACTUAL QUANTITIES REQUIRED,
INSTALL SYMMETRICALLY CENTER IN TILE.
22-02 UPRIGHT HEAD FIRE SUPPRESSION SPRINKLER HEAD SHOWN FOR
REFERENCE ONLY; FIRE SUPPRESSION CONTRACTOR TO VERIFY ACTUAL
QUANTITIES REQUIRED, COORDINATE INSTALLATION WITH MEPT DRAWINGS
23-05 MECHANICAL UNITS, SEE MECH DRAWINGS FOR SIZE AND SPECS
26-02 3' PERIMETER CLEARANCE AROUND SERVER RACK SHOWN DASHED
26-03 TELECOMM RACK, SEE TELECOMMUNICATION DRAWINGS
26-04 ELECTRICAL PANELS, SEE ELECTRICAL DRAWINGS
26-05 CABLE TRAY, SEE TELECOMMUNICATION DRAWINGS
26-11 STROBE LIGHT, SEE ELECTRICAL DRAWINGS
26-12 ELECTRICAL OUTLETS MOUNTED ON PLYWOOD
KEY NOTES
Revisions: Date:
W
AP
SCALE: 1/8" = 1'-0"
8' 6' 4' 2' 8' 16'0'
NORTH
78 SF
TE
OFFICE
RESTROOM
JANITOR
SHIPPING
RECEIVING
WAREHOUSE
PHARMACY CARE
DOCK
(E)CONDENSING
UNIT CONC. PAD
OUTLINE OF DOCK ROOF
NEW SIDEWALK
ACCESS LADDER
FEC
FEC
FEC
WIRE MESH PARTITION
EXISTING SIDEWALK
170-AE-201
13-02
23-08
09-13
09-21
03-01
13-03
78 SF
TE
170-AE-201
06-01
26-09
09-24
09-25
09-03 26-04
(E)
26-10
NORTH
SCALE: 1/2" = 1'-0"
24" 18" 12" 6" 24" 48"0"
PAINT EXISTING
COLUMN WITHIN
TE ROOM
LEVEL 1
100' - 0"
TE
06-01
09-01
09-18
LEVEL 1
100' - 0"
TE
06-01
09-01
09-18
S
26-04
CLEAR
1' - 0"
8'
6"
EXISTING
DOOR AND
FRAME
LEVEL 1
100' - 0"
TE
WALL MOUNTED TELECOM
ENCLOSED CABINET
06-01
09-18
09-01
LEVEL 1
100' - 0"
TE
09-18
09-01
06-01
LOCATION OF EXISTING
STEEL COLUMN, PAINT
DEMO EXISTING
PLYWOOD
02-30
02-17
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
NORTH
NOTE: MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL
DURING CONSTRUCTION WORK. FIRE SUPPRESSION
CONTRACTOR TO REMOVE DOWNWARD HEADS AND TURN
UPWARDS, PROVIDE NEW FIRE SUPPRESSION HEAD IN
TELECOMMUNCIATIONS ROOMS (TR). WORK TO BE
CONDUCTED WITHIN ONE WORKING SHIFT. SEE ADDITIONAL
PROJECT NOTES ON COVER SHEET.
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
NORTH
ROOM ALLOCATION LEGEND
PROPOSED NEW CABINET / TR / MCR LOCATION
EXISTING TR WITH POWER AND FIBER
UPGRADES, SEE TELECOM AND
ELECTRICAL DRAWINGS
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
FLOOR PLAN NOTES
1. SEE G SERIES SHEETS FOR BALANCE OF PLAN GENERAL NOTES.
2. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION. ALL INFORMATION REGARDING
EXISTING CONDITIONS IS BASED UPON OWNER-SUPPLIED
DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD CONDITIONS.
3. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND
ALL WALL MOUNTED EQUIPMENT OR ACCESSORIES; COORDINATE
LOCATIONS.
4. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF
STUD, UNLESS OTHERWISE NOTED.
5. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND
REPAIR ALL INCONSISTENCIES IN FLOOR ELEVATIONS.
6. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO
PROVIDE SUITABLE SUBSTRATE FOR FINISHES.
7. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING
ADA ACCESS CONTROL.
8. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND
BOTTOM, AND PENETRATIONS, AND INSTALL PUTTY PADS AROUND
ELECTRICAL BOXES WHERE PARTITION CONTAINS ACOUSTICAL
INSULATION.
9. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED
STRUCTURE UNLESS NOTED OTHERWISE, NO CEILINGS SPECIFIED.
FLOOR PLAN LEGEND
CARD READER, REF TELECOM DRAWINGS
DATA PORT, REF TELECOM DRAWINGS
OUTLET, REF ELEC DRAWINGS
WIRELESS ACCESS POINT, REF TELECOM DRAWINGS
ELEC PANEL, REF ELEC DRAWINGS
STRIP LIGHT FIXTURE, REF ELEC DRAWINGS
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:1
:1
P
M
170-AE-201
170-FLOOR PLANS AND
ELEVATIONSGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 170
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/8" = 1'-0"4
170 - LEVEL 1 FLOOR PLAN
1/2" = 1'-0"11
170 - 103 ENLARGED PLAN
1/2" = 1'-0"5
170 - 103 EAST ELEVATION
1/2" = 1'-0"6
170 - 103 NORTH ELEVATION
1/2" = 1'-0"1
170 - 103 SOUTH ELEVATION
1/2" = 1'-0"3
170 - 103 WEST ELEVATION
1/4" = 1'-0"10
DEMOLITION FLOOR PLAN
02-17 PATCH/REPAIR ALL WALL DAMAGE AND PREPARE FOR NEW FINISHES, TYP.
PRIME LOCATIONS OVERHEAD
02-30 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED
DEVICES; REMOVE EXISTING SPRINKLER HEADS AND TURN UP DISCHARGE
PIPE, PROVIDE NEW FIRE SUPPRESSION HEADS FOR EXPOSED CONDITIONS
03-01 NEW HOUSEKEEPING PAD, COORDINATE WITH MECHANICAL DRAWINGS FOR
SIZE AND CIVIL DRAWINGS FOR DETAILS
06-01 INSTALL 3/4" AC GRADE OR BETTER FIRE RETARDANT PLYWOOD; PAINT
WITH TWO COATS OF SEMI-GLOSS BRIGHT WHITE FIRE RETARDANT PAINT;
MOUNT BOTTOM OF PLYWOOD 6" A.F.F., TOP OF PLYWOOD AT 8'-6" A.F.F.; DO
NOT PAINT OVER STAMPED PLYWOOD RATING
09-01 PAINT WALL ABOVE PLYWOOD WITH SEMI-GLOSS PAINT, COLOR TO MATCH
PLYWOOD PAINT.
09-03 EXTEND EXISTING GYPSUM BOARD TO UNDERSIDE OF STRUCTURE WHERE
NOT INSTALLED, SEAL TO STRUCTURAL DECK
09-13 FOLLOW EXISTING CABLE ROUTING FOR REMOVAL OF EXISTING CABLE AND
INSTALLATION OF NEW CABLES AT LOCATIONS AS NOTED IN TELECOM
DRAWINGS.
09-18 6" HIGH COVED RUBBER WALL BASE, COLOR TO BE SELECTED FROM
MANUFACTURER'S STANDARD SELECTION
09-21 REMOVE AND RE-INSTALL CEILING TILES AND OTHER CEILING MOUNTED
DEVICES AS NEEDED FOR INSTALLATION OF CABLES AND CONDUITS ABOVE
CEILING AS PER TELECOM DRAWINGS, REPLACE ALL DAMANGED TILES TO
MATCH EXISTING AND REINSTALL ALL DEVICES AS NEEDED. DO NOT LEAVE
CEILING TILES UNINSTALLED AND UNATTENDED PAST DURATION OF
WORKING SHIFT. CONTINUOUSLY REINSTALL TILES TO PROVIDE SEALED
SMOKE ASSEMBLY. SEE COVER SHEET FOR ADDITIONAL NOTES UNDER
"TEMPORARY FIRE & SMOKE PROTECTION"
09-24 PATCH DAMAGED WALLS PREPARE TO RECEIVE NEW FINISHES.
09-25 PATCH AND REPAIR ANY GYPSUM BOARD OPENINGS FOUND AT PERIMETER
OF WALL ENSURING NO VISIBLE EVIDENCE OF PATCH, SEAL PERIMETER OF
ROOM IN ITS ENTIRETY, PAINT;
13-02 ICRA CLASS II, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND
WORKING HOURS RESTRICTIONS
13-03 ICRA CLASS III, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND
WORKING HOURS RESTRICTIONS
23-08 NEW REFRIGERANT PIPE LINES ROUTING SHOWN FOR REFERENCE ONLY.
SEE MECHANICAL DRAWINGS FOR ACTUAL ROUTING; CONTRACTOR TO
REMOVE CEILING TILES ALONG ROUTE OUTSIDE OF TR'S AND REPLACE
WITHIN WORKING SHIFT. CONDUCT INFECTION PREVENTION MEASURES AS
SPECIFIED.
26-04 ELECTRICAL PANELS, SEE ELECTRICAL DRAWINGS
26-09 30" CLEARANCE AT WALL MOUNTED SERVER RACK SHOWN DASHED
26-10 WALL MOUNTED TELECOM CABINET, SEE TELECOM DRAWINGS
UPUP
W
AP
SCALE: 1/8" = 1'-0"
8' 6' 4' 2' 8' 16'0'
NORTH
171-AE-201
NOTE: TELECOM FOR THIS BUILDING TO BE SERVICED FROM BUILDING 154
Room
TOILET
BOILER
(E) TR CLOSET
NOTE: COORDINATE WITH C.O.R. EXTENT
OF CONSTRUCTION WORKERS ACCESS
TO SPACE AND DEMOLITION ROUTE OF
CARTS FROM AND TO BUILDING
02-03
02-06
PATCH WALL ALL SURFACE MOUNTED
DEMOLISHED ITEMS; CLEAN WALL AND
PREPARE TO PAINT FULL LENGHT OF
WALL, COORDINATE EXTENT OF PAINT
WITH C.O.R.
09-09
EXISTING LOFT AND BUILDING
EGRESS, NOT IN SCOPE OF WORK
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
NORTH
PROPOSED NEW TR LOCATION
EXISTING TR TO BE UPDATED
ROOM ALLOCATION LEGEND
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
FLOOR PLAN NOTES
1. SEE G SERIES SHEETS FOR BALANCE OF PLAN GENERAL NOTES.
2. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION. ALL INFORMATION REGARDING
EXISTING CONDITIONS IS BASED UPON OWNER-SUPPLIED
DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD CONDITIONS.
3. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND
ALL WALL MOUNTED EQUIPMENT OR ACCESSORIES; COORDINATE
LOCATIONS.
4. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF
STUD, UNLESS OTHERWISE NOTED.
5. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND
REPAIR ALL INCONSISTENCIES IN FLOOR ELEVATIONS.
6. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO
PROVIDE SUITABLE SUBSTRATE FOR FINISHES.
7. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING
ADA ACCESS CONTROL.
8. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND
BOTTOM, AND PENETRATIONS, AND INSTALL PUTTY PADS AROUND
ELECTRICAL BOXES WHERE PARTITION CONTAINS ACOUSTICAL
INSULATION.
9. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED
STRUCTURE UNLESS NOTED OTHERWISE, NO CEILINGS SPECIFIED.
FLOOR PLAN LEGEND
CARD READER, REF TELECOM DRAWINGS
DATA PORT, REF TELECOM DRAWINGS
OUTLET, REF ELEC DRAWINGS
WIRELESS ACCESS POINT, REF TELECOM DRAWINGS
ELEC PANEL, REF ELEC DRAWINGS
STRIP LIGHT FIXTURE, REF ELEC DRAWINGS
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:1
:2
P
M
171-AE-201
171-FLOOR PLANS
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 171
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/8" = 1'-0"1
LEVEL 1 FLOOR PLAN
1/4" = 1'-0"2
LEVEL 1 LEVEL 1 ENLARGED DEMOLITION PLAN
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO
OWNER.
02-06 DEMO EXISTING WALL IN ITS ENTIRETY INCLUDING ANY WALL MOUNTED
DEVICES, TERMINATE CONDUITS AT NEAREST J-BOX, PREP FLOOR TO
RECEIVE NEW FINISH
09-09 APPLY JOINT COMPOUND AND FEATHER A MINIMUM OF 3' HORIZONTALLY AS
REQUIRED TO ACHIEVE A SMOOTH AND UNIFORM APPEARANCE
Room
Room
102 Room
Room
Room
Room
Room
GARAGE
TOILET
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:0
A
M
16-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 16RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 16
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
PLAN
NORTH
BOILER
PAINT SPRAY
BOOTH
1/2" CW
1/2" HW
1-1/2" V UP,
1-1/2" W DN
1/2" CW
V
OFFICE
100C
WOODSHOP
100D
SIGN ROOM
100A
LOUNGE
100F
TOILET
100K
GARAGE
100I
STAFF
100J
Room
100N
Room
100O
INCINERATOR (E)
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:0
A
M
20-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 20RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 20
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
DEMOLISH CW PIPING FROM NEW TR AREA.
PLAN
NORTH
Room
B-21
MAIL ROOM
B-1Room
B-19
Room
B-18
DRY COOLER
PUMP PACKAGE
CGS/R
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE - 1
141-MD-300
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:0
A
M
141-MD-0B1
MECHANICAL DEMOLITION PLAN -
BUILDING 141 BASEMENTRSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
SHEET NOTES
DEMOLISH DRY COOLER, PUMP PACKAGE, AND ALL ASSOCIATED PIPING AND
ACCESSORIES.
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 141
BASEMENT
PLAN
NORTH
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
OFFICE
123 ELEVATOR
E-1
CORRIDOR
1C-1
Room
STAIRS
S-12
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE -
141-MD-300
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:0
A
M
141-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 141 FLOOR 1RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 1
PLAN
NORTH
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
OFFICE
STAIR
S-23
CORRIDOR
2C-1
ELEVATOR
202-C
OFFICE
OFFICE
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE -
141-MD-301
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:0
A
M
141-MD-021
MECHANICAL DEMOLITION PLAN -
BUILDING 141 FLOOR 2RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 2
PLAN
NORTH
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
141-MD-301
OFFICE
ELEVATOR
124B
CORRIDOR
3C-1
STAIRS
S-33
OFFICE
OFFICE
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE -
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:0
A
M
141-MD-031
MECHANICAL DEMOLITION PLAN -
BUILDING 141 FLOOR 3RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING - 141 FLOOR 3
PLAN
B-20
TR
B-20A Room
C-B3
MAIL ROOM
B-1
STAIRS
S-B3
Room
C-B3
Room
B-24
8/8 R/A
16"Ø R/A
4" W UP/DN
8"Ø S/A
R/A GRILLE
S/A DIFFUSER
S 9
14X14 R/A UP TO
FLOORS ABOVE
FIRE SPRINKLER
RISER AND VALVES
FSD
CGS/R UP
Room
Room
OFFICE
OFFICE
OFFICE
ELEVATOR
E-1
FIRE RISER
124A
CORRIDOR
1C-1
CORRIDOR
1C-3
Room
2 2 2
12"Ø S/A
3/4" HWR/S
3/4" HWS/R
12"Ø R/A
4" W
S9
R/A
R/A
20X12 R/A
14X26 R/A UP
14X14 R/A DN FIRE SPRINKLER
RISER AND VALVES
FSD
CGS/R UP
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
141-MD-300
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 141RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 141 BASEMENT ENLARGED
1/4" = 1'-0"2
MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 1 ENLARGED
PLAN
NORTH
PLAN
NORTH
SHEET NOTES
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
DEMOLISH DUCTWORK AND DIFFUSERS AS INDICATED. COORDINATE WITH
REMODEL WORK.
RELOCATE VAV. SEE REMODEL FOR LOCATION.
DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH AIR CONDITIONING UNIT AND ALL ASSOCIATED PIPING.
DEMOLISH AIR CONDITIONING UNIT CONTROLLER AND ALL ASSOCIATED WIRING.
DEMOLISH 3/4" CONDENSATE PIPING TO DRAIN.
DEMOLISH 2" CGS/R PIPING. PATCH AND SEAL WALL AND FLOOR PENETRATIONS.
DEMOLISH VAV SENSOR AND WIRING.
DEMOLISH EXHAUST FAN AND DUCTWORK THROUGH EXTERIOR WALL. CAP AND
SEAL WALL PENETRATION.
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
KEYPLAN - BUILDING 141 BASEMENT
KEYPLAN - BUILDING 141 FLOOR 1
AREA OF WORK
AREA OF WORK
PLAN
NORTH
PLAN
NORTH
ADA TOILET
CORRIDOR
2C-1
CORRIDOR
2C-4
SHARED OFFICE
SHARED OFFICE
HSKP
OFFICE
OFFICE
220-B
OFFICE
220-A
14"Ø S/A
26/14" R/A
3/4" HWR/S
12/6 E/A
W UP/DN
V UP
R/A
S9
14X26 R/A DN
HW
V
CW
FSD
CGS/R UP
11 11 11
OFFICE
OFFICE
OFFICE
OFFICE
ELEVATOR
124B
CORRIDOR
3C-1
CORRIDOR
12"Ø S/A
3/4" HWS/R
W UP/DN
V UP
S9
R/A
R/A DN
FSD
FIRE SPRINKLER
RISER AND VALVES
OFFICE
11 11
CGS/R DN
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
141-MD-301
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 141RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 2 ENLARGED
1/4" = 1'-0"2
MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 3 ENLARGED
PLAN
NORTH
PLAN
NORTH
SHEET NOTES
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
DEMOLISH DUCTWORK AND DIFFUSERS AS INDICATED. COORDINATE WITH
REMODEL WORK.
RELOCATE VAV. SEE REMODEL SHEETS FOR LOCATION.
DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH AIR CONDITIONING UNIT AND ALL ASSOCIATED PIPING.
DEMOLISH AIR CONDITIONING UNIT CONTROLLER AND ALL ASSOCIATED WIRING.
DEMOLISH 3/4" CONDENSATE PIPING TO DRAIN.
DEMOLISH 2" CGS/R PIPING. PATCH AND SEAL WALL PENETRATIONS.
DEMOLISH VAV SENSOR AND ALL ASSOCIATED WIRING.
DEMOLISH E/A DUCT BACK TO MAIN AND CAP.
SUPPLY AIR DUCTWORK AND VAVS IN THIS AREA NOT SHOWN FOR CLARITY.
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
KEYPLAN - BUILDING 141 FLOOR 2
KEYPLAN - BUILDING 141 FLOOR 3
AREA OF WORK
AREA OF WORK
PLAN
NORTH
PLAN
NORTH
FOR ENLARGED PLAN SEE -
154-MD-300
CRAWL SPACE
BSMT
MECHANICAL
B-100
CRAWL SPACE
B-11C
Room
B-022
PHARMACY
CACHE
B04
MED ADMIN
STORAGE
BSMT
Room
BSMT
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
154-MD-0B1
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - BASEMENTRSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 BASEMENT
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
PLAN
115-5
CORRIDOR
C101
CORRIDOR
OFFICE
115-3A
COPIER
114A
CORRIDOR
C102
OFFICE
114B
OFFICE
EXAM
MECHANICAL
MECHANICAL
CORRIDOR
C
CLEAN
FOR ENLARGED PLAN SEE -
154-MD-301
154-MD-301
FOR ENLARGED PLAN SEE -
154-MD-302
154-MD-302
FOR ENLARGED PLAN SEE -
154-MD-301
TREATMENT
102G
TREATMENT
102F
SOILED
STORAGE
CORR.
C
STAIR
102J
CLEAN
STORAGE
102I
CANTEEN
LAB
LOBBY
C107
LOBBY
C107
TRAINING
CENTER
S110
MECHANICAL
UTILITY
STORAGE
COMMON AREA
PATIENT ROOM
OFFICE
COMMON AREA
(WAITING)
115-7
VEST
CORRIDOR
C105
LINEN SERVICE
LOBBY
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
154-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 1RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
12 12
239B
EXAM
203L
MOVE OFFICE
239C
FOR ENLARGED PLAN SEE - 1
154-MD-303
FOR ENLARGED PLAN SEE -
154-MD-303
FOR ENLARGED PLAN SEE -
154-MD-303
154-MD-303
EXAM
204L
CORRIDOR
C237
ORTHO
OPERATING
ROOM
217A
MECHANICAL
UTILITY
CYSTOSCOPY
PROCEDURE
CORRIDOR
C201
ENDOSCOPY
PROCEDURE
CORE LAB
211L
MICROBIOLOGY
LAB
210L
ANATOMIC
PATHOLOGY
209L
STAFF LOUNGE
224L
MORGUE
232L
PAD STORAGE
STERILE
ASSEMBLY
ROOM
OPERATING
ROOM
217B
EQUIPMENT
STORAGE
218A
ANAESTHESIA
WORKROOM
PROCEDURE
271A
STRG
273A
FUTURE
MECHANICAL
CORRIDOR
C210
EQUIP.
CORR
C204D
CORR
C204B
CORRIDOR
C201
OFFICE
154-CUAC-1
154-CUAC-2
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
154-MD-021
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 2RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
SHEET NOTES
OUTDOOR CONDENSER FOR BASEMENT CRAC UNIT TO REMAIN.
DEMOLISH OUTDOOR CONDENSER FOR BASEMENT CRAC UNIT.
PIPING FOR CRAC UNITS TO REMAIN. EACH CONDENSER IS CONNECTED TO TWO
SETS OF REFRIGERANT SUPPLY AND RETURN PIPING. SHOWN AS SINGLE LINE FOR
CLARITY.
DEMOLISH PIPING BACK TO CHASE. PIPING IN CHASE TO BE CAPPED, LABELED, AND
ABANDONED IN PLACE.
PLAN
TRAINING
PATIENT ROOM
SUPPLY
FOR ENLARGED PLAN SEE -
154-MD-304
154-MD-304
FOR ENLARGED PLAN SEE -
154-MD-305
FOR ENLARGED PLAN SEE -
154-MD-305
OFFICE
CORRIDOR
C
OFFICE
OFFICE
EXISTING
WAITING
TOILET
NURSE'S
STATION
SAME DAY
SURGERY
NURSE
315J
MECHANICAL
ROOM
OFFICE
PATIENT ROOM
PATIENT ROOM
PATIENT ROOM
CORRIDOR
INTENSIVE CARE
UNIT
CHEMO
CONSULT/OFFICE
307D
CORRIDOR
C
CORRIDOR
C
MED ROOM
SDS INTAKE
AREA
OFFICE
MEN TOILET
CORRIDOR
C
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-031
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 3RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
PATIENT ROOM
BATH
421A
PATIENT ROOM
STORAGE
422B CORRIDOR
C403
DAY ROOM
FOR ENLARGED PLAN SEE -
154-MD-304
154-MD-304
CORRIDOR
C402
OFFICE
OFFICE
438B
OFFICE
443C
FOR ENLARGED PLAN SEE -
154-MD-305
NURSE'S
STATION
OFFICE
CORRIDOR
C402A
PATIENT ROOM
PATIENT ROOM
BREAK ROOM
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-041
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 4RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
3 3
CORRIDOR
B-09C
CORRIDOR
B-09C
OIT IMAGING
B-13
CRAWL SPACE
B-11C
CRAWL SPACE
BSMT
CRAWL SPACE
B-11C
CORRIDOR
B-12
3/4" HW
1-1/2" CW
1-1/2" CW
3/4" HW
1/2" HWC
2" W DRAIN
11 MECHANICAL
B-11
STAIR
30X12 44X16 38X16 30X12
154-ECO-1 154-ECO-2
AREA OF WORK
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-300
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 BASEMENT ENLARGED
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
DEMOLISH DOWNFLOW CRAC UNITS AND ASSOCIATED REFRIGERATION PIPING.
DEMOLISH CW AND CD PIPING BACK TO MAIN AND CAP.
RELOCATE UPFLOW CRAC UNITS, SEE REMODEL PLAN FOR LOCATION. DEMOLISH
ASSOCIATED DUCTWORK, REFRIGERATION PIPING, AND CW AND CD PIPING.
PRE-ECONOMIZER PUMP BOXES AND PIPING TO ROOF TO REMAIN.
DEMOLISH REFRIGERANT PIPING SERVING CRAC UNITS TO BE RELOCATED. EACH UNIT
HAS TWO SETS OF SUPPLY AND RETURN PIPING, ONLY ONE SET SHOWN FOR CLARITY.
REFRIGERANT PIPING FROM ROOF CONDENSING UNIT TO PUMPED ECONOMIZERS TO
REMAIN. EACH UNIT HAS TWO SETS OF SUPPLY AND RETURN PIPING, ONLY ONE SET
SHOWN FOR CLARITY.
DEMOLISH ALL SUPPLY AND RETURN DUCT, GRILLES, AND DIFFUSERS.
DEMOLISH PRE-ECONOMIZER PUMP BOXES AND ASSOCIATED REFRIGERATION PIPING.
DEMOLISH REFRIGERANT PIPING TO CHASE. CAP PIPING AT CHASE, LABEL, AND
ABANDON IN PLACE.
DEMOLISH CW FOR HUMIDIFIER BACK TO BACKFLOW PREVENTER. BACKFLOW
PREVENTER AND UPSTREAM PIPING TO REMAIN.
DEMOLISH CD BACK TO 2" DRAIN IN WALL. RETAIN 2" DRAIN IN PLACE FOR USE IN
REMODEL WORK.
DEMOLISH WALL CONTROLLER FOR CRAC UNITS.
PLAN
NORTH
EXAM
MECHANICAL
CORRIDOR
C
S
12"Ø R/A
10"Ø S/A
7"Ø S/A
12" LPS
1" LPS
8"Ø E/A
7"Ø E/A
9"Ø E/A UP
TO ROOF
VAV
3/4" HGS/R3/4" HGS/R
FLOOR SINK
EXAM
MECHANICAL
CORRIDOR
C
2" V
1" HW
1" CW
1" HW
1" HW
CORRIDOR
C
FLOOR SINK
2" V
ROOM 109 AREA OF WORK
ROOM 102H AREA OF WORK
TREATMENT
102G
CORR.
C
SOILED
STORAGE
CLEAN
STORAGE
102I
E/A
E/A
S/A
S/A
S/A
VAV
S/A
E/A UP
TO ROOF
EXHAUST FAN
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-301
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
ROOM 109 ENLARGED HVAC
1/2" = 1'-0"3
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
ROOM 109 ENLARGED PLUMBING
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE
WITH REMODEL WORK.
DEMOLISH HEATING PIPING BACK TO MAIN AND CAP.
DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH SINK AND ALL PIPING BACK TO MAIN AND CAP.
DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH SENSOR FOR VAV.
DEMOLISH DIFFUSER AND FLEX DUCT.
DEMOLISH EXHAUST GRILLE.
PLAN
NORTH
PLAN
NORTH
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
ROOM 102H ENLARGED
PLAN
NORTH
COPIER
114A
OFFICE
115-3A
CORRIDOR
C102
OFFICE
115-5
CORRIDOR
CORRIDOR
C101
HWS/R
S/A
S/A
S/A
S/A
E/A E/A
S4
S/A S/A
E/A UP
30 X 8 R/A DN
30 X 8 R/A DN
S4
OFFICE
115-5
OFFICE
115-3A
COPIER
114A
CORRIDOR
C102
2-1/2" CW
1-1/2" HW
3/4" CW W
CW
AREA OF WORK
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-302
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1 ROOM 115-3 HVAC ENLARGED.
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
PLAN
NORTH
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE
WITH REMODEL WORK.
DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH VAV AND DUCTWORK BACK TO MAIN AND CAP. COORDINATE WITH
REMODEL WORK
DEMOLISH SENSOR FOR VAV.
DEMOLISH VAV BOX.
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1 ROOM 115-3 PLUMBING ENLARGED
PLAN
NORTH
STORAGE
218B
E/A
E/A
S/A
TR
239A
OFFICE
239B
CORRIDOR
C243
E/A
E/A
E/A S/AS/A
S/A
ROOM
E/A
S/A
TR
239A
CORRIDOR
C243
OFFICE
239B
CW
HW
W
CW
CW
HW
CW
HW
V W
CW
W W V H C
FOR WORK IN
THIS AREA, SEE -
154-MD-303
154-MD-303
FOR WORK IN THIS AREA,
SEE - 2
154-MD-303
FOR WORK IN THIS AREA,
SEE - 1
154-MD-303
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-303
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 218B ENLARGED
1/2" = 1'-0"3
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 239 ENLARGED VENTILATION
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 272 ENLARGED
1/2" = 1'-0"4
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 239 ENLARGED PIPING
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .