SECTION F
DELIVERABLES
All deliverables shall be electronically submitted to both the KO and COR via email, electronic storage device, or AMRDEC SAFE at https://safe.amrdec.army.mil/safe/Welcome.aspx. When submitting via electronic storage device two copies shall be submitted and distributed to the KO and COR. Thumb drives are not authorized for use on Government Computers.
SECTION - F
Annex/ Spec Item
Form Attachment
Number
Deliverable Title
Date (s) of Submission
Distribution
Frequency Original Copies (including original)
0200000/ 2.2.1.2
N/A Request to Work Outside Government's Regular Working Hours
At least seven calendar days prior to requested day.
KO/COR 1 As required
0200000/ 2.3.1
N/A Sign-in Sheets and Minutes for Review and Comments
Within two working days
KO,
COR and all attendees
1 As Required
0200000/ 2.3.1
Sign-in Sheets and
Minutes Final Revision
Within two working days
KO, COR and all attendees
1 As Required
N/A
0200000/ N/A Permits, Within 15 calendar days after award, within seven calendar days after changes and as requested by the KO.
KO/COR 1 Once for 2.3..4, Certifications and initial
2.7.2.7 Licenses submittal, 1502000/ then as
2.2.1 required
1503010/
2.2.1, 1503020/
2.2.1, 2.3.1, 2.3.2
1503030/
2.3.3
1503040/
2.2.1 1503050/
2.2.1, 2.3.1.1, 2.3.2
1800000/
2.3.1
0200000/ N/A Certificate of Within 15 KO/COR 1 Once for
2.3.5 Insurance calendar days initial
after award. submittal
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
0200000/ 2.3.5
N/A Written Notice of cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
0200000/ 2.3.5
N/A Phase-In and Phase-Out Plans
Within 15 calendar days after award.
KO/COR 1 Once for initial submittal 0200000/
2.5.1 N/A Plans of Action
and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO,
COR,
and
Comma nd
Security Manager
1 As required
0200000/ 2.5.1
N/A Cybersecurity Incident
Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO,
COR, and Comman d Security Manager
1 As required
0200000/ 2.5.4
N/A Scheduling and Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As Specified
0200000/ 2.5.4
N/A Work Schedules Within 15 calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
0200000/ 2.5.5
N/A Notification of any Difficulty in Scheduling Work
By the end of each workday
KO and
COR
1 As required
0200000/ N/A Status of Within 30 KO and 1 As required
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
2.5.6 Deliverables minutes of the
inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
COR
0200000/ 2.6.7
N/A Service Interruptions
At least five working days in advance
KO and
COR
1 As required
0200000/ N/A Quality Within 15 KO/COR 1 Once for
2.5.8.1 Management Plan calendar days initial
after award and submittal, within seven then as calendar days of required changes.
2.6.9.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
0200000/ N/A QC Inspection File Within five KO/COR 1 Once for
2.5.8.2 calendar days of closeout completion/ submittal termination of the contract.
0200000/ N/A Contractor Quality First work day of KO/COR 1 Monthly
2.5.8.3 Inspection and each month.
Surveillance
Report
0200000/ 2.6.1
N/A List of Key Personnel and Qualification s
Within 15 calendar days after award and within seven calendar days of changes.
KO/COR 1 Once for initial submittal, then as required
0200000/ 2.6.1
N/A Organizationa l Chart
Within 15 calendar days after award and within seven calendar days of changes.
KO/COR 1 Once for initial submittal, then as required
0200000/ 2.6.2.6
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
0200000/ 2.7.1
N/A Employee List Upon request. KO/COR 1 As required
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
0200000/ 2.8.2
N/A Accident Prevention Plan
Within 15 calendar days after award and within seven calendar days of changes.
KO/COR 1 Once for initial submittal, then as required
0200000/ 2.8.3
N/A Activity Hazard Analysis
Together with the Accident
Prevention Plan and for changes.
KO/COR 1 Once for initial submittal, then as required 0200000/
2.8.4 N/A Compliance
Plans, Programs, and Procedures
Together with the Accident
Prevention Plan and for changes.
KO/COR 1 Once for initial submittal, then as required 0200000/
2.9.7 N/A Monthly On-Site
Labor Report First work day of each month.
KO/COR 1 Monthly
0200000/ 2.8.82.9.8
N/A OSHA Citations and Violations Corrective Action Report
Within .48 hours after receiving a citation.
KO/COR 1 As required
0200000/ 2.8.9
N/A Safety Inspection and Monitoring Report
Upon request. KO and
COR
1 As required
0200000/ 2.8.10
N/A Safety Certifications
Within 15 calendar days after award and as old certifications expire.
KO/COR 1 Once for initial submittal, then as required 0200000/ 2.9
N/A EMS Goals and Policy Measurement Information
Upon request. KO and
COR
1 As required
02000000/ 2.9.1.1
N/A Water Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
1 As specified
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
0200000/ 2.9.2
N/A Environmental Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
0200000/ 2.9.2.1
N/A Sampling Plan Prior to Sampling
KO and
COR
1 As required
0200000/ 2.9.2.1
N/A Laboratory Analysis
Upon Request KO and
COR
1 As specified
0200000/ 2.9.2.3
J-0200000-04 Solid Waste Management and Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
0200000/ 2.9.2.3
J-0200000-04 Summary Solid Waste Management and Recycling Report
By October 10th KO and
COR
1 Annually
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
0200000/ 2.9.2.4
N/A Waste Stream Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
0200000/ 2.9.2.6
N/A Fuel and hazardous substance spill notification
Within 15 minutes of discovery
Regional Dispatch
Center
1 As required
0200000/ 2.9.2.6
N/A Fuel and hazardous substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
0200000/ 2.9.2.6
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO and
COR
1 As required
0200000/ 2.9.2.7
N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days after contract award and not less than 10 working days prior to planned use of hazardous material.
KO/COR 1 Once for initial submittal, then as required
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
0200000/ 2.9.2.7
J-0200000-04 Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO/COR 1 Once for initial submittal, then annually
0200000/ 2.9.3
N/A Sustainable Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
0200000/ 2.9.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
0200000/ 2.9.3.2
N/A Recovered Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
0200000/ 2.10
N/A Mission Essential Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
0200000/ 2.10
N/A Mission Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
0200000/ 2.12.1
Recurring Work Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
0200000/ 2.12.2
N/A Notification to the Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
1 As required
0200000/ 2.13.1.1
N/A Non-Recurring Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
0200000/ 2.13.2.1
N/A Non-Recurring Work Proposals
Within two working days following receipt of request
KO 1 As required
1502000/ 3.1
N/A Other Recurring Services Program Summary Report
First work day of each month
KO/COR 1 Monthly
1502000/ 3.1.1
N/A City of Fort Worth Liquid Waste Manifest Tracker
1.4 calendars days after pumping grease traps
KO/COR 1 As required
1503010/ 2.2.1
N/A Pathogen Training Certificates
Upon Request KO/COR 1 As requested
1503010/ 3.1
N/A Annual Work Schedule
1 each year KO/COR 1 Within 15 days after award and annually thereafter
1503010/ 3.1
N/A Monthly Work Plan
First work day of each month
KO/CO
R
2 Monthly
1503020/ 2.3..4
N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO/CO
R
2 As required
1503020/ 2.3.5
J-1503020-02 Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets (SDS)
With the proposal. Note:
Any proposed changes in pesticide usage shall be submitted for KO approval at least 5 business days in advance of pesticide use.
KO/CO
R
1 1 for each pesticide per pest as required
1503020/
J-1503020-05 Contractor s Work Plan
With the proposal.
KO/CO
R
1 1 per proposal
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
1503020/
N/A Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO/CO
R
1 As required
1503020/ 3.2
N/A Completed Pest Control Trouble Call Report
First Work Day of Each Month
KO/CO
R
1 Monthly
1503020/ 3.3
J-1503020-13 Report of Pest Management Operations
Electronically within 1 day of each pest management operation.
KO/CO
R
2 As required
1503030 / 2.3.1
N/A Weight Tickets As specified KO 12 With invoice/Mon thly 1503030 /
3.1, 3..4
N/A Solid Waste Collection Schedule
As specified KO/CO R
1 Annually
1503040/ 3.1
N/A Water Analysis Report
First work day of each month
KO/COR 1 Monthly
1503040/ 3.3
N/A Completed Pest Control Trouble Call Report
First Work Day of Each Month
KO/COR 1 Monthly
1503050/ 2.3.1.4
N/A Planned Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)
Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.
KO, COR,
PPMC
3 Annually for each pesticide/her bicide, as required.
1503050, 2.3.1.5
N/A Pest Management Operations Report
Electronically by the 15th of the following month (Example:
July data must be submitted by August 15) on the format approved by
PMC.
KO,
COR,
PPMC
2 Monthly
1503050/ 2.3.9.1
N/A Water Conservation Plan
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementin g changes to the schedule
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
1503050 /
J-1503050-08 Recycling Report Form
First work day of each month
KO/COR 1 Monthly
1503050 /
N/A SDS sheets and catalog cut sheets or samples for fertilizer and mulch
As specified KO/COR 1 As required
1503050 / 3.1
N/A Soil Analysis test results and proposed fertilizer
As specified KO/COR 1 15 days after receipt of the test results by the Contractor
1503050 / 3.1.1.3
N/A Top Dressing and Over Seeding Seed Type
Within 15 calendar days after contract award and 15 days prior to the start of each
Option
KO/CO
R
1 Annually and five calendar days prior to implementin g changes to the schedule
1503050 / 3.1.7
N/A Vegetation Control Schedule
Within 15 calendar days after contract award and 15 days prior to the start of each
Option
KO/CO
R
1 Annually
1800000/ 2.2.1
N/A Training Plan / Documentation
Within 15 calendar days after contract award and 15 days prior to the start of each
Option
KO/CO
R
1 Annually
1800000/ 3.1.2
N/A Hazardous Waste Disposal Report
10 days after the end of the reporting period
KO/COR
Installatio n Environm ental Office
2 As Specified
1800000/ 3.1.2
N/A Regulated Medical Waste Manifest
With Each Shipment
Posted on Public Web Site
1 As Specified
1800000/ 3.2, 3.2.2, 3.2.3, 3.2..4
N/A Storm Water Analytical Monitoring Report
10 days after the end of the reporting period
KO/COR
Installatio n Environm ental Office
2 As Specified
Annex/ Spec Item
Form
Submission
Distribution
Frequency Original Copies (including original)
1800000/ 3.2, 3.2.1
N/A Visual Monitoring Form
10 days after the end of the reporting period
KO/COR
Installatio n Environm ental Office
2 As Specified a.