N6945020R0036_Amend 0004.pdf

PDF 207 KB Posted

Attached to
Job Order Contract (JOC), Naval Station Guantanamo Bay, Cuba
Solicitation number
N6945020R0036
Issued by

About this file

This amendment to a solicitation for a Job Order Contract at Naval Station Guantanamo Bay, Cuba makes several revisions and clarifications. The contractor will have 60 calendar days for mobilization after contract award before beginning a seed project with a 120-day period of performance. Existing warehouse and office space will be provided. The annual representations and certifications in SAM must match the offeror on the SF1442. Responses to pre-proposal inquiries are appended. The purpose, location of work, incumbent status, award type, and issuing agency are unchanged from the original solicitation.

View the file

Other files

File Type Posted
PPI Responses_9JUN2020_FINAL.pdf PDF
N6945020R0036_Amend 0003.pdf PDF
N6945020R0036_Amend 0002.pdf PDF
Attachment E (rev.1) - Safety Data Sheet.docx DOCX document
N6945020R0036_Amend 0001.pdf PDF
PPI Responses_13MAY2020.pdf PDF
Attachment B - AMAG.xlsx XLSX spreadsheet
Attachment F - Past Performance Questionnaire.docx DOCX document
Attachment A - PPI Log.xlsx XLSX spreadsheet
Solicitation N6945020R0036.pdf PDF
Attachment D - Construction Experience Project Data Sheet.docx DOCX document
Attachment H - Seed Project Photos.pdf PDF
Attachment C - SECNAV 5512.pdf PDF
Attachment G - Seed Project SOW.pdf PDF
Attachment E - Safety Data Sheet.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5771683

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

JOB ORDER CONTRACT (JOC) SOLICITATION FOR NAVAL STATION GUANTANAMO BAY, CUBA

See continuation page for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945020R0036

X 9B. DATED (SEE ITEM 11)

14-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jun-2020

CODE

NAVFAC SOUTHEAST

MACC CELL

BLDG 903 YORKTOWN AVE

PO BOX 30

JACKSONVILLE FL 32212

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945020R0036

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

The purpose of this Amendment is to:

1. Revise the following Price Solicitation Submittal Requirement in Section M (page 222):

DELETE:

(vi) Copy of current registration and completed/updated Annual Representations and Certifications on the SAM website, www.sam.gov.

REPLACE WITH:

(vi) Copy of current registration and completed/updated Annual Representations and Certifications on the SAM website, www.sam.gov. SAM registration must be in the name/CAGE/DUNS of the offeror identified on the SF1442. If a Representation or Certification required by Section K of the RFP is not provided in SAM, include the Representation or Certification in your price proposal.

2. Section H, H.1 – UFGS 00 73 01.00 25 General Special Conditions for Guantanamo Bay Projects, 1.3.20 Available Living Quarters.

Confirm that the primary source of contractor living quarters/crew berthing will be temporary housing facilities (man camps) due to limited availability at Navy Gateway Inn and Suites.

The Contractor may build their own man camp. Construction of the man camp is the contractor's responsibility. Facilities Management Division (FMD) will provide approved site location for a Laydown Storage Area (LSA) and man camp construction.

The Contractor also has the option of using Government‐provided temporary housing facilities. The Government will allow the current contractor to turn over the existing temporary housing facilities to the new contractor. Temporary housing facilities provided by the Government are provided in "as is" condition. It is the Contractor's responsibility to enhance and maintain facilities in accordance with Code requirements. Contractor shall tie into existing utilities at designated locations and maintain these utilities until completion of the contract. Contractor shall be billed for utilities at prevailing rates. Upon completion of the contract, the Contractor shall remove trailers from site and restore site to a natural earthen condition.

All other terms and conditions of UFGS 00 73 01.00 25 General Special Conditions for Guantanamo Bay Projects remain unchanged.

3. Clarify that the Government will provide existing warehouse and office space to the contractor.

Paragraph C.9.4 (page 24) of the solicitation has been revised as follows:

Materials and equipment may not be stored at the jobsite lay down area after work hours unless approved in advance by the Contracting Officer. All job site lay down areas are dependent upon Task Order size and location of the work. Job site availability will be included with each RFP and resulting Task Order. The contractor will be assigned Building M613 or equivalent facility for Contractor use. Building M613 consists of both administrative and warehouse space.

4. Revise Section B.10 (page 15) as follows:

DELETE:

B.10 CONTRACTOR PHASE‐IN

B.10.1 The services provided by this contract are vital to the Government’s overall effort, and continuity must be maintained at a consistently high level without interruptions. The Contractor is expected to meet full performance requirements from the start date of the contract. The contractor shall receive and respond to Requests for Proposals, prepare estimates, receive and respond to task orders, and order material and prepare schedules for indefinite quantity work where the actual performance will begin after the contract start date.

B.10.2 The contractor’s phase‐in plan shall be submitted in their technical proposal and shall include requirements as established in the RFP.

REPLACE WITH:

B.10 CONTRACTOR PHASE‐IN

B.10.1 The services provided by this contract are vital to the Government’s overall effort, and continuity must be maintained at a consistently high level without interruptions. The Contractor is expected to meet full performance requirements within 60 days from contract award. The contractor shall receive and respond to Requests for Proposals, prepare estimates, receive and respond to task orders, and order material and prepare schedules for indefinite quantity work where the actual performance will begin after the mobilization timeframe.

B.10.2 The contractor’s phase‐in plan shall be submitted in their technical proposal and shall include requirements as established in the RFP.

B.10.3 The contractor shall include a 60 calendar day duration for mobilization in the phase‐in plan timeline. Mobilization time period shall begin upon award date of the contract and be completed prior to seed project start date.

5. Revise the seed project completion date (page 217) as follows:

Completion Date: The project will have a total maximum duration of 120 calendar days. The days are figured from the date of the task order award, which includes the initial 15 days allowed for submission and approval of insurance, bonding and other requirements.

Completion Date: The contractor shall have 60 calendar days for mobilization prior to seed project start date. The seed project will have a total maximum period of performance of 120 calendar days after completion of the mobilization time period. The days are figured from the date of contract award, which begins the mobilization time period and includes the initial 15 days allowed for submission and approval of insurance, bonding and other requirements. The initial 15 days shall run concurrent with the 60 calendar days allowed for mobilization.

6. Revise the following requirement of Attachment G – Seed Project Scope of Work (page 3):

Remove and store existing conduit for reinstallation (approx. 70 LF)

Remove and replace existing conduit (approx. 70 LF)

7. Provide responses to Pre‐Proposal Inquiries (PPIs). Attachment PPI Responses_9JUN2020_FINAL.pdf has been uploaded to the attachments/links section of the solicitation at beta.SAM.gov.

8. Attachment(s) provided with Amendment 0004: PPI Responses_9JUN2020_FINAL.pdf

ACKNOWLEDGEMENT OF THIS AMENDMENT IS REQUIRED WITH YOUR PROPOSAL. ALL OTHER TERMS AND

CONDITIONS REMAIN UNCHANGED.

(End of Summary of Changes)