N6945020R0018_SectionJ.pdf
PDF 6 MB Posted
- Attached to
- Mid-South NOSC Multi-Function Support Services
- Solicitation number
- N6945020R0018
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N69450-20-R-0018 Section J
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-0200000-01 Definitions And Acronyms
J-0200000-02 Wage Determinations
J-0200000-03 Directives, Instructions, And References
J-0200000-04 Invoice Form
J-0200000-05 Forms
J-0200000-06 Service Provider Information
J-0200000-07 Asset Information
J-0200000-08 Characteristic Meter Readings Information
J-0200000-09 NAVFAC Maximo Data Reporting
J-0200000-10 NAVFAC Maximo System Access Procedures
J-0200000-11 Commander, Navy Region Southeast Instruction 4101.1
J-0200000-12 Hazardous Material Inventory Log
J-0200000-13 Exhibit Line Item Numbers
ATTACHMENT J-0200000-01
DEFINITIONS AND ACRONYMS
Definition Description
Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Business Management
System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
Component Inventory
Management Unit
(CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space
(such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Contracting Officer
(KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor
Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include sales tax and transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the
Contractor. When questions arise concerning the cost of direct materials, direct material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Electronic Operation
And Maintenance And
Support Information
(eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility A building or structure designed and created to serve a particular function.
Definition Description
Fixed Burden Rate
(FBR)
The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or
Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
Government Furnished
Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Infrastructure Condition
Assessment Program
(ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Maintenance and
Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
Definition Description
NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC
MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Performance
Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance
Assessment
Representative (PAR)
That individual designated by the KO to be responsible for the monitoring of Contractor performance.
Pre-Expended Bin
Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management
Program
A Government program established for the purpose of reviewing and approving the
Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance
(QA)
The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A datalection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as
"Means".
Real Property Land and improvements to land (i.e., facilities). It includes equipment affixed and built into the facility as an integral part of the facility (such as heating systems), but not movable equipment (e.g., plant equipment, industrial equipment, buoys).
Real Property Inventory
Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.
Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.
An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose.
Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in
“normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
System An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole.
Definition Description
Unit Priced Labor
(UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the
Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity;
costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
Acronym Title
ACO Administrative Contracting Officer
BW Biweekly
BFR Basic Facility Requirements
BW Biweekly
CBMM Condition Based Maintenance Management
CDR Contract Discrepancy Report
CIA Controlled Industrial Area
CIMU Component Inventory Management Unit
CMMS Computerized Maintenance Management System
COR Contracting Officer Representative
COR Condition of Readiness
DBH Diameter at Breast Height
DCR Direct Condition Rating
DoD Department of Defense
DoN Department of Navy
DRMO Defense Reutilization Management Office
EPA Environmental Protection Agency
EPCRA Emergency Planning and Community Right-to-Know Act
FAR Federal Acquisition Regulation
FFP Firm Fixed Price
FIFRA Federal Insecticide, Fungicide, and Rodenticide Act
FSC Facility Support Contract
GIS Geospatial Information System
GFE Government-furnished Equipment
GFF Government-furnished Facilities
GFM Government-furnished Materials
HCA Head Contracting Agency
ICAP Infrastructure Condition Assessment Program
ICP Integrated Contingency Plan
IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store
IPM Integrated Pest Management
IPMIS Integrated Pest Management Information System
IPMP Integrated Pest Management Plan
KO Contracting Officer
LAN Local Area Network
M Monthly
MAP Maintenance Action Plan
MDI Mission Dependency Index
MEP Mechanical, Electrical and Plumbing
MRI Mission Readiness Index
MPAS Monthly Performance Assessment Summary
SDS Safety Data Sheets
NAVFAC Naval Facilities Engineering Command
NMCI Navy Marine Corps Intranet
NOSC Navy-On-Scene Coordinator
PAP Performance Assessment Plan
PAR Performance Assessment Representative
PAW Performance Assessment Worksheet
PEO Program Executive Officer
Acronym Title
PM Project Manager
PM Planned Maintenance or Preventative Maintenance
PRCSP Permit Required Confined Space Program
PWS Performance Work Statement
PWO Public Works Officer
Q Quarterly
QC Quality Control
RPIE Real Property Inventory Equipment
RSL Remaining Service Life
SC Security Clearances
SM Semimonthly
SPAR Senior Performance Assessment Representative
TE Technical Exhibit
VIQ Variation in Quantity
WBS Work Breakdown Structure
ATTACHMENT J-0200000-02
WAGE DETERMINATIONS
Placeholder for Service Contract Act and Davis-Bacon Act Determinations.
ATTACHMENT J-0200000-03
DIRECTIVES, INSTRUCTIONS, AND REFERENCES
All revisions and replacements of listed References and Technical Documents take precedent of those listed.
Reference Title
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1915 Occupational Safety And Health Standards For Shipyard Employment
29 CFR 1926 Safety and Health Regulations for Construction
40 CFR 136 Code of Federal Regulations (Protection of Environment)
40 CFR 247
Comprehensive Procurement Guideline For Products Containing Recovered
Materials
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172
Hazardous Materials Tables and Hazardous Materials Communications
Regulations
Commander Navy Region
Southeast Instruction 4101.1
Commander Navy Region Southeast Energy Management Program Instruction
4101.1
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2
US Army Corp of Engineers “Construction Equipment Ownership and Operating
Expense Schedule
Executive Order 13148 Greening the Government through Leadership in Environmental Management
Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management
P.L. 91-596 Occupational Safety and Health Act
OPNAVINST 4100.5D Energy Management
OPNAVINST 6240.3 Environmental Protection Manual
SECNAV Instruction 4100.9A Department of the Navy (DON) Shore Energy Management
DoD Directive 5200.2
DODD 6055.9 DoD Explosives Safety Management and the DoD Explosives Safety Board
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
NAVFACINST 11010.45 Regional Planning Instruction (Site Approval Process)
NAVFAC P-78 Real Property Inventory Procedures Manual
OPNAVINST 11000.16 Command Responsibility for Shore Activity Land and Facilities
OPNAVINST 11010.20 Navy Facilities Projects
OPNAVINST 11011.10 Utilization of Navy Real Property
SECNAVINST 11011.47 Acquisition, Management, and Disposal of Real Property and Real Property
Interests by the Department of the Navy
UFC 2-000-5N Facility Planning Criteria for Navy/Marine Corps Shore Installations
ATTACHMENT J-0200000-04
INVOICE FORM
Refer to SECTION G in the RFP for Wide Area Workflow Payment Instructions and SECTION I for DFARS
Clause 252.232-7003 titled “Electronic Submission of Payment Requests and Receiving Reports.”
ATTACHMENT J-0200000-05
FORMS
Forms Description
CSIR Contractor Significant Incident Report (See Form Below)
Solid Waste Management Report Format for Annual Solid Waste Management Report
Initial Report Follow-up Report Final Report
Contractor Significant Incident Report (CSIR)
1. General Information
Contracting Activity:
Accident Classification:
Injury Fatality Environment Procedural Issues
Lessons Learned
Illness Property Damage
Other_______________________________
Involving:
Confined Space Equip/Mrt Ver/Mat Handling (Heavy Construction Equip.)
Hazardous Material
Crane and Rigging Equip/Mrt Ver/Mat Handling (Material Handling)
Trenching/Excavation
Diving Equip/Mrt Ver/Mat Handling (Man-Lift/Elevated Platform)
Waterfront/Marine Operations
Demolition/Renovation Fall from Ladder Fall from Scaffold
Other___________________
Electrical Fall from Roof Fire
2. Personal Information
Name (Last, First, MI):
Age: Sex:
Job Title/Description:
Employed By:
Supervisor Name (Last, First, MI) & Title:
Was the person trained to perform this activity/task?
Yes No
What type of training was received (OJT, classroom, etc)?
Date of the most recent formal training and topics discussed?
3. Witness Information
Witness #1: Name (Last, First, MI):
Supervisor Name (Last, First, MI):
Witness #2: Name (Last, First, MI):
Supervisor Name (Last, First, MI):
Additional Witnesses:
4. Contract Information
Type of Contract:
A/E BOS CLEAN Construction Design Build
FSCC FSSC
JOC RAC Service
Other_______________________________
Contract Number & Title:
Industrial Group & Industrial Type:
Prime Contractor Name/Address/Phone
& Fax No:
Safety Manager (Last, First, MI):
Insurance Carrier:
Sub Contractor Name/Address/Phone & FAX No:
Safety Manager (Last, First, MI):
Insurance Carrier:
5. Accident Description
Date of
Accident:
Time of
Accident:
Exact Location of Accident:
Describe the accident in detail in your words: (Use the back of page if you need additional space)
(List any additional witnesses on a separate sheet and attach.)
Direct Cause(s) of Accident:
Indirect Cause(s) of Accident:
Action(s) taken to prevent re-occurrence or provide on-going corrective actions:
Corrective Action Beginning Date:
Anticipated Completion Date:
Personal Protective Equipment:
Available and used Available and not used
Not Required
Not related to Mishap Wrong PPE for job
List PPE Used:
Type of Construction Equipment (Make, Model, Serial #, VIN#) Involved:
Was Hazardous Material Spilled/Released?
Please List Hazardous Material(s) Involved:
Who provided first aid or cleanup of mishap site?
Any blood-borne pathogen exposure, other than EMTs?
Yes
No
Who?
List OSHA and EM-385-1-1 standards that were violated:
Was site secured and witness statements taken immediately?
By Whom?
6. Injury Illness/Fatality Information
Severity of Injury/Illness:
Fatality
Lost Workday Case Involving Days Away From Work
Temporary Disabillity
Recordable Workday Case Involving Restricted Duty
Permanent Total Disability Other Recordable Case
Recordable First Aid Case
Permanent Partial Disability Non-Recordable Case
No Injury
Estimated Days Lost:
Estimated Days
Hospitalized:
Estimated Days Restricted Duty:
List Primary Body List Other Body Part(s) Affected:
Part Affected:
Nature of Injury/Illness for Primary Body Part (Examples: Amputation, Burn, Hernia):
Type of Accident (Examples: Fall same level, Lifting, Bitten, Exerted):
Source of Accident (Examples: Crane, Carbon Monoxide, Ladder, Welding Equipment):
7. Causal Factors (Explain answers on supplementary sheet)
Design – Design of facility, workplace, or equipment was a factor?
Inspection/Maintenance – Inspection & Maintenance procedures were a factor?
Persons Physical Condition – In your opinion, the physical condition of the person was a factor?
Operation Procedures – Operating procedures were a factor?
Job Practices – One or more job safety/health practices not being followed when the accident occurred contributed to the accident?
Human Factors – One or more human factors, such as a person’s size or strength contributed to the accident?
Environmental Factors – Heat, cold, dust, sun, glare, etc., Chemical and Physical Agent Factors – Exposure to chemical agents, such as dust, fumes, mist, vapors, or physical agents such as noise, radiation, etc., contributed to the accident?
Office Factors – Office setting such as lifting office furniture, carrying, stooping, contributed to the accident?
Support Factors – Inappropriate tools/resources were provided to perform the task?
PPE – Improper selection, use or maintenance of PPE
Drugs/Alcohol – In your opinion, were drugs or alcohol a factor?
Job Hazard Analysis – The lack of an adequate (IAW-
EM-385-1-1 Sec 01.A) activity hazard analysis was a contributing factor.
Job Hazard Analysis – JHA was not site specific and/or did not address the type of work/operations performed when the mishap occurred.
Management – A lack of adequate supervision contributed to the accident.
Management – Inadequate information was provided at pre con meeting.
CONTRACTOR SIGNIFICANT INCIDENT REPORT (CSIR) INSTRUCTIONS
Complete Sections Appropriate to Incident (Rev. 06/02).
NOTE: THE ATTACHED CSIR FORM IS TO BE USED BY CONTRACTORS TO RECORD THE
RESULTS OF THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED
TO THE CONTRACTING OFFICER WITHIN THE REQUIRED TIMEFRAMES.
GENERAL. Complete a separate report for each person who was injured in the accident. A report needs to be completed for all OSHA recordable accidents, property damage in excess of $2000.00 (This amount is for record purposes only. GOV is not required to enter property damage reports into FAIR database if it is less than $10,000.00.), WHE accidents, or near miss/high visibility mishaps. Please type or print legibly.
Appropriate items shall be marked with an “X” in box(es), non-applicable sections shall be marked “N/A”.
If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.
Mark the report:
INITIAL – If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.
FOLLOW-UP – If you are providing additional information on a report previously submitted.
FINAL – If you are providing a completed report and expect no changes.
SECTION 1 – GENERAL INFORMATION
CONTRACTING ACTIVITY/ROICC OFFICE - Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).
ACCIDENT CLASSIFICATION - INJURY/ILLNESS/FATALITY/PROPERTY DAMAGE/-
PROCEDURAL ISSUES/-ENVIRONMENTAL/LESSONS LEARNED/OTHER – Mark the appropriate block(s) if the incident resulted in any of these conditions.
INVOLVING - If the mishap involved any of the conditions listed under “Involving” mark the appropriate box(es). Specific questions associated with each of these conditions are available from the Contracting
Officer to assist you in your investigation. When these questions are used they shall be attached as part of this report.
SECTION 2 - PERSONAL INFORMATION
NAME - Enter last name, first name, middle initial of person involved.
AGE - Enter age.
SEX - Enter M for Male and F for Female.
JOB TITLE/DESCRIPTION - Enter the job title/description assigned to the injured person (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter employment company name of the person involved.
SUPERVISOR’S NAME & TITLE - Enter name and title of the immediate supervisor.
WAS PERSON TRAINED TO PERFORM ACTIVITY/TASK? - For the purpose of this section
“trained” means the person has been provided the necessary information (either formal and/or on-the-job
(OJT) training) to competently perform the activity/task in a safe and healthful manner.
TYPE OF TRAINING - Indicate the specific type of training (classroom or on-the-job) that the injured person received before the accident happened.
DATE OF MOST RECENT FORMAL TRAINING/TOPICS DISCUSSED - Enter the month, day, and year of the last formal training completed that covered the activity/task being performed at the time of the accident. List topics that were discussed at the training identified above.
SECTION 3 - WITNESS INFORMATION
The following applies to Witness #1 and Witness #2:
WITNESS NAME - Enter last name, first name, middle initial of the witness.
JOB DESCRIPTION/TITLE - Enter the job title/description assigned to the witness (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter the name of the employment company of the witness.
SUPERVISORS NAME - Enter name of immediate supervisor of the witness.
ADDITIONAL WITNESSES - Provide same information, as above, for each witnesses. Use additional pages if necessary.
SECTION 4 - CONTRACTOR INFORMATION
TYPE OF CONTRACT - Mark appropriate box. A/E means architect/engineer. If “OTHER” is marked, specify type of contract on line provided.
CONTRACT NUMBER/TITLE - Enter complete contract number and tile of prime contract (e.g. N62477-
85-C-0100, 184 Pearl City Hsg. Revitalization).
CONSTRUCTION INDUSTRIAL GROUP AND INDUSTRIAL TYPE – This is the type of construction that will be done at this project.
1. First, you must choose the Industrial Group. You have 4 choices to choose from: (NOTE! Review of the Industrial Types below and knowing what the projects scope of work is will assist you in deciding what the Industrial Group should be.)
a. Buildings
b. Heavy Industrial
c. Infrastructure
d. Light Industrial
2. Once you have chosen the Industrial Group, you now select the Industrial Type. You have multiple choices under each Group, chose the one you feel fits the project most closely because on most projects there won’t be an exact match:
a. Buildings:
(1) Communications Ctr.
(2) Dormitory/Hotel
(3) High-rise Office
(4) Hospital
(5) Housing
(6) Laboratory
(7) Low-rise Office
(8) Maintenance Facility
(9) Parking Garage
(10) Physical Fitness Ctr.
(11) Restaurant/Nightclub
(12) School
(13) Warehouse
b. Heavy Industrial:
(1) Chemical Mfg.
(2) Electrical (Generating)
(3) Environmental
(4) Metals Refining/Processing
(5) Mining
(6) Natural Gas Processing
(7) Oil Exploration/Production
(8) Oil Refining
(9) Pulp and Paper
c. Infrastructure:
(1) Airport
(2) Electrical Distribution
(3) Flood Control
(4) Highway
(5) Marine Facilities
(6) Navigation
(7) Rail
(8) Tunneling
(9) Water/Wastewater
d. Light Industrial:
(1) Automotive Assembly/Mfg.
(2) Consumer Products Mfg.
(3) Foods
(4) Microelectronics Mfg.
(5) Office Products Mfg.
(6) Pharmaceuticals Mfg.
CONTRACTOR’S NAME/ADDRESS/PHONE NUMBER
(1) PRIME - Enter the exact name (title of firm), address, phone and fax numbers of the prime contractor.
(2) SUBCONTRACTOR - Enter the exact name, address, phone and fax numbers of any subcontractor involved in the accident.
SAFETY MANAGER’S NAME
(1) PRIME - Enter the name of the prime contractor safety manager.
(2) SUBCONTRACTOR - Enter the name of the subcontractors safety manager.
INSURANCE CARRIER
(1) PRIME - Enter the exact name/title of the prime’s insurance company. Policy number not required.
(2) SUBCONTRACTOR - Enter the exact name of the subcontractor’s insurance company. Policy number not required.
SECTION 5 - ACCIDENT DESCRIPTION
DATE OF ACCIDENT - Enter the month, day, and year of accident.
TIME OF ACCIDENT - Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).
EXACT LOCATION OF ACCIDENT - Enter facts needed to locate the accident scene (installation/project name, building/room number, street, direction and distance from closest landmark, etc.).
DESCRIBE THE ACCIDENT IN DETAIL. Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and equipment are clearly specified.
Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered. NOTE!
Review questions in Section 7 below before completing.
DIRECT CAUSE(S) - The direct cause is that single factor which most directly lead to the accident. See examples below.
INDIRECT CAUSE(S) - Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.
Examples for Direct and Indirect Cause:
1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.
Direct cause: Failure to provide fall protection at elevation
Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee
(possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.
2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)
Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.
Indirect cause: Failure of employee to pay attention to driving (defensive driving).
ACTION(S) TAKEN TO PREVENT RE-OCCURRENCE OR PROVIDE ON-GOING
CORRECTIVE ACTIONS. Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses. Continue on back or additional sheets of paper if necessary to fully explain and attach to the complete report form.
CORRECTIVE ACTION DATES -
(1) Beginning - Enter the date when the corrective action(s) identified above will begin.
(2) Anticipated Completion - Enter the date when the corrective action(s) identified above will be completed.
PERSONAL PROTECTIVE EQUIPMENT (PPE) - Mark appropriate box(es) and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)
TYPE OF CONTRACTOR EQUIPMENT - Enter the Serial Number, Model Number and specific type of equipment involved in the mishap (e.g. dump truck (off highway), crane (rubber tire), pump truck (concrete), etc.).
WAS HAZARDOUS MATERIAL SPILLED/RELEASED? - Mark appropriate block and list name(s) of any reportable quantities of hazardous materials spilled/released during the mishap.
WHO PROVIDED FIRST AID OR CLEAN-UP OF MISHAP SITE? - List name(s) of individual(s) and employer, if known.
ANY BLOOD-BORNE PATHOGEN EXPOSURE, OTHER THAN EMT? - Mark appropriate block and list name(s) of individual(s) and employer, if known.
LIST OSHA AND/OR EM 385-1-1 STANDARDS THAT WERE VIOLATED. - Self explanatory.
WAS SITE SECURED AND WITNESS STATEMENT TAKEN IMMEDIATELY? - Mark appropriate block and list by whom.
SECTION 6 - INJURY/ILLNESS/FATALITY INFORMATION
SERVERITY OF INJURY/ILLNESS – Mark appropriate box.
ESTIMATED DAYS LOST - Enter the estimated number of workdays the person will lose from work.
Update when final data is known.
ESTIMATED DAYS HOSPITALIZED - Enter the estimated number of workdays the person will be hospitalized. Update when final data is known.
ESTIMATED DAYS RESTRICTED DUTY - Enter the estimated number of workdays the person, as a result of the accident, will not be able to perform all of their regular duties. Update when final data is known.
BODY PART(S) AFFECTED - Enter the most appropriate primary and when applicable, secondary, etc.
body part(s) affected (e.g. arm: wrist: abdomen: single eye; jaw : both elbows: second finger: great toe: collar bone: kidney, etc.).
NATURE OF INJURY/ILLNESS FOR PRIMARY BODY PART - Enter the most appropriate nature of injury/illness (e.g. amputation, back strain, dislocation, laceration, strain, asbestosis, food poisoning, heart conditions, etc.).
TYPE AND SOURCE OF INJURY/ILLNESS - Type and Source Codes are used to describe what caused the incident.
(1) TYPE Code stands for an “Action” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder. Type Code: Fell different levels”.) Select the most appropriate Type of injury from the list below:
TYPE OF INJURY/ILLNESS
STRUCK
BY/AGAINST
CONTACTED
CONTACTED WITH (INJURED PERSON
MOVING)
CONTACTED BY (OBJECT WAS MOVING)
FELL, SLIPPED, TRIPPED
SAME LEVEL/DIFFERENT LEVEL/NO
FALL
EXERTED
LIFTED, STRAINED BY (SINGLE ACTION)
STRESSED BY (REPEATED ACTION)
CAUGHT
ON/IN/BETWEEN
EXPOSED
INHALED/INGESTED/ABSORBED/EXPOS
ED TO
PUNCTURED, LACERATED
PUNCTURED BY/CUT BY/STUNG
BY/BITTEN BY
TRAVELING IN
(2) SOURCE Code stands for an “object or substance.” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder. Source Code: “Ladder”.) Select the most appropriate Source of injury from the list below:
SOURCE OF INJURY/ILLNESS
BUILDING OR WORKING AREA
WALKING/WORKING AREA
STAIRS/STEPS
LADDER
FURNITURE
BOILER/PRESSURE VESSEL
EQUIPMENT LAYOUT
WINDOWS/DOORS
ELECTRICITY
DUST, VAPOR, ETC.
DUST (SILICA, COAT, ETC.)
FIBERS
ASBESTOS
GASES
CARBON MONOXIDE
MIST, STEAM, VAPOR, FUME
WELDING FUMES
PARTICLES (UNIDENTIFIED)
ENVIRONMENT CONDITION
TEMPERATURE EXTREME (INDOOR)
WEATHER (ICE, RAIN, HEAT, ETC.)
FIRE, FLAME, SMOTE (NOT TABACCO)
NOISE
RADIATION
LIGHT
VENTILATION
TOBACCO SMOKE
STRESS (EMOTIONAL)
CONFINED SPACE
CHEMICAL, PLASTIC, ETC.
DRY CHEMICAL - CORROSIVE
DRY CHEMICAL - TOXIC
DRY CHEMICAL - EXPLOSIVE
DRY CHEMICAL - FLAMMABLE
LIQUID CHEMICAL - CORROSIVE
LIQUID CHEMICAL - TOXIC
LIQUID CHEMICAL - EXPLOSIVE
LIQUID CHEMICAL - FLAMMABLE
PLASTIC
WATER
MEDICINE
MACHINE OR TOOL
HAND TOOL (POWERED: SAW, GRINDER,
ETC.)
HAND TOOL (NON POWERED)
MECHANCIAL POWER TRANSMISSION
APPARATUS
GUARD, SHIELD (FIXED, MOVEABLE,
INTERLOCK)
VIDEO DISPLAY TERMINAL
PUMP, COMPRESSOR, AIR PRESSURE TOOL
HEATING EQUIPMENT
WELDING EQUIPMENT
INANIMATE OBJECT
BOX, BARREL, ETC.
PAPER
METAL ITEM, MINERAL
NEEDLE
GLASS
SCRAP, TRASH, WOOD
FOOD
CLOTHING, APPAREL, SHOES
MACHINE OR TOOL
HAND TOOL (POWERED: SAW, GRINDER,
ETC.)
HAND TOOL (NON POWERED)
MECHANCIAL POWER TRANSMISSION
APPARATUS
GUARD, SHIELD (FIXED, MOVEABLE,
INTERLOCK)
VIDEO DISPLAY TERMINAL
PUMP, COMPRESSOR, AIR PRESSURE TOOL
HEATING EQUIPMENT
WELDING EQUIPMENT
INANIMATE OBJECT
BOX, BARREL, ETC.
PAPER
METAL ITEM, MINERAL
NEEDLE
GLASS
SCRAP, TRASH, WOOD
FOOD
CLOTHING, APPAREL, SHOES
VEHICLE
AS DRIVER OF PRIVATELY OWNED, RENTAL
VEH.
AS PASSENGER OF PRIVATELY OWNED,
RENTAL VEH.
DRIVER OF GOVERNMENT VEHICLE
PASSENGER OF GOVERNMENT VEHICLE
COMMON CARRIER (AIRLINE, BUS, ETC.)
AIRCRAFT (NOT COMMERCIAL)
BOAT, SHIP, BARGE
ANIMATE OBJECT
DOG
OTHER ANIMAL
PLANT
INSECT
HUMAN (VIOLENCE)
HUMAN (COMMUNICABLE
DISEASE)
BACTERIA, VIRUS (NOT HUMAN
CONTACT)
MATERIAL HANDLING EQUIPMENT
EARTHMOVER (TRACTOR, BACKHOE, ETC.)
CONVEYOR (FOR MATERIAL AND
EQUIPMENT)
ELEVATOR, ESCALATOR, PERSONNEL HOIST
HOIST, SLING CHAIN, JACK
CRANE
FORKLIFT
HANDTRUCK , DOLLY
PERSONAL PROTECTIVE EQUIPMENT
PROTECTIVE CLOTHING, SHOES,
GLASSES, GOGGLES
RESPIRATOR, MASK
DIVING EQUIPMENT
SAFETY BELT, HARNESS
PARACHUTE
SECTION 7 - CAUSAL FACTORS
Review thoroughly. Answer each question by marking the appropriate block. NOTE! If any answer is yes, explain in section 5 above.
(1) DESIGN - Did inadequacies associated with the building or work site play a role? Would an improved design or layout of the equipment or facilities reduce the likelihood of similar accidents?
Were the tools or other equipment designed and intended for the task at hand?
(2) INSPECTION/MAINTENANCE - Did inadequately or improperly maintained equipment, tools, workplace, etc., create or worsen any hazards that contributed to the accident? Would better equipment, facility, work site or work activity inspections have helped avoid the accident?
(3) PERSONS PHYSICAL CONDITION - Do you feel that the accident would probably not have occurred if the employee was in “good” physical condition? If the person involved in the accident had been in better physical condition, would the accident have been less severe or avoided altogether? Was overexertion a factor?
(4) OPERATION PROCEDURES - Did lack of or inadequacy within established operating procedures contribute to the accident? Did any aspect of the procedures introduce any hazard to, or increase the risk associated with the work process? Would establishment or improvement of operating procedures reduce the likelihood of similar accidents?
(5) JOB PRACTICES - Were any of the provision of the Safety and Health Requirements Manual (EM
385-1-1) violated? Was the task being accomplished in a manner which was not in compliance with an established job hazard analysis or activity hazard analysis? Did any established job practice (including
EM 385-1-1) fail to adequately address the task or work process? Would better job practices improve the safety of the task?
(6) HUMAN FACTORS - Was the person under undue stress (either internal or external to the job)?
Did the task tend toward overloading the capabilities of the person: i.e., did the job require tracking and reacting to many external inputs such as displays, alarms, or signals? Did the arrangement of the workplace tend to interfere with efficient task performance? Did the task require reach strengths, endurance, agility, etc., at or beyond the capabilities of the employee? Was the work environment ill-adapted to the person? Did the person need more training, experience, or practice in doing the task?
Was the person inadequately rested to perform safely?
(7) ENVIRONMENTAL FACTORS - Did any factors such as moisture, humidity, rain, snow, sleet, hail, ice, fog, cold, heat, sun temperature changes, wind, tides, floods, currents, terrain; dust, mud, glare, pressure changes, lighting, etc., play a part in the accident?
(8) CHEMICAL AND PHYSICAL AGENT FACTORS - Did exposure to chemical agents (either single shift exposure or long-term exposure such as dusts, fibers, (asbestos, etc.), silica, gases (carbon, monoxide, chlorine, etc.), mists, steam, vapors, fumes, smoke, other particulates, liquid or dry chemicals that are corrosive, toxic, explosive or flammable, by-products of combustion or physical agents such as noise, ionizing radiation, non-ionizing radiation (UV radiation created during welding, etc.) contribute to the accident/incident?
(9) OFFICE FACTORS - Did the fact that the accident occurred in an office setting or to an office worker have a bearing on its cause? For example, office workers tend to have less experience and training in performing tasks such as lifting office furniture. Did physical hazards within the office environment contribute to the hazard?
(10) SUPPORT FACTORS - Was the person using an improper tool for the job? Was inadequate time available or utilized to safely accomplish the task? Were less than adequate personnel resources (in terms of employee skills, number of workers, and adequate supervision) available to get the job done properly? Was funding available, utilized and adequate to provide proper tools, equipment, personnel, site preparation, etc.
(11) PERSONAL PROTECTIVE EQUIPMENT - Did the person fail to use appropriate personal protective equipment (gloves, eye protection, hard-toed shoes, respirator, etc) for the task or environment? Did protective equipment provided or worn fail to provide adequate protection from the hazard(s)? Did lack of or inadequate maintenance of protective gear contribute to the accident?
(12) DRUGS/ALCOHOL - Is there any reason to believe the person’s mental or physical capabilities, judgment, etc., were impaired or altered by the use of drugs or alcohol? Consider the effects of prescription medicine and over the counter medications as well as illicit drug use. Consider the effect of drug or alcohol induced “hangovers”.
(13) JOB/ACTIVITY HAZARD ANALYSIS - Was a written Job/Activity Analysis completed for the task being performed at the time of the accident? If one was made, did it address the hazard adequately or does it need to be updated? If none made, will one be made? These may also need to be addressed in the Corrective Actions Taken section. Mark the appropriate box. If one was made, attach a copy of the analysis to the report.
(14) MANAGEMENT - Did the lack of supervisor or management support play a part in the mishap?
Mark the appropriate box.
SECTION - 8 OSHA INFORMATION - Complete this section if applicable
SECTION 9 - REPORT PREPARER
Providing a completed CSIR to the Contracting Officer is the PRIME CONTRACTOR’S
RESPONSIBILITY. Enter the name, date of report, title, employer, phone number and signature of person completing the accident report and provide it to the Contracting Officer, or his representative, responsible for oversight of that contractor activity. NOTE! If prepared by other than the Prime Contractor, a person employed by the Prime Contractor must sign that they have reviewed and concur with the report and it’s findings (e.g. company owner, project supervisor/foreman, Safety Officer, etc.).
Solid Waste Management Report
Solid Waste Recycled
Description
Amount
(lbs./tons) Cost Revenue
Glass
Metal (aluminum, circuit boards, steel)
Paper & Paper Board
Plastic
Food (cooking grease & oil, discarded food)
Wood (packaging, pallets, plywood)
Yard/Green Waste (mulch, trees, trimmings)
Concrete
Asphalt
Select Waste
Description
Amount
(lbs./tons) Cost Revenue
Construction and Demolition Debris
Used Oil
Ethylene Glycol Antifreeze
Lead-Acid Batteries
Other Waste
Description
Amount
(lbs./tons) Cost Revenue
Sewage Sludge (land applied)
Sewage Sludge (disposed)
Oil Water Separator Liquids
OWWO Oil
OWWO Sludge
Lift Station Grease
Other Waste (SPECIFY)
ATTACHMENT J-0200000-06
SERVICE PROVIDER INFORMATION
Name Required
Length
Limit NAVFAC MAXIMO FIELD
Approved Date Y 10 APPROVEDDATE
Work Type Y 15 WORKTYPE
Customer Reference Number Y 10 SERVPRVREFCODE
Description Y 150 DESCRIPTION
Location Y 30 LOCATION
Reported By Y 62 REPORTEDBY
Master System N N/A N/A
Status Y 16 STATUS
Status Date Y 10 STATUSDATE
Priority Y 12 WOPRIORITY
Actual Start Y 10 ACTSTART
Actual Finish Y 10 ACTFINISH
Supervisor N 30 SUPERVISOR
Labor Hours(Actual) Y 8 ACTLABHRS
Labor Cost(Actual) Y 10 ACTLABCOST
Material Cost(Actual) Y 10 ACTMATCOST
Duration N 8 ESTDUR
Asset Y 25 ASSETNUM
Target Finish Y 10 TARGCOMPDATE
Target Start Y 10 TARGSTARTDATE
Reported Date Y 10 REPORTDATE
Lead N 30 LEAD
Scheduled Start Y 10 SCHEDSTART
Scheduled Finish Y 10 SCHEDFINISH
Modified Date Y 10 CHANGEDATE
Modified By Y 30 CHANGEBY
Next Due Date N 10 PMNEXTDUEDATE
Is Task? Y 1 ISTASK
Parent WO N 10 PARENT
Workorder Y 10 WONUM
Detail Location Y 250 DETAILLOC
CLIN Y 30 CLIN
Customer Ref Code Y 8 CUSTOMERCODE
Sub Work Type Y 15 SUBWORKTYPE
Work Center Y 8 PERSONGROUP
GL Account N 27 GLACCOUNT
Outage Type Y 50 OUTAGETYPE
Outage Cause Y 200 OUTAGEREASON
Num of Bldgs Affected Y Integer NUMBLDGSAFFECTED
Outage Start Date Y 10 OUTAGESTARTDATE
Outage End Date Y 10 OUTAGEENDATE
Workorder Long Description Y 150 DESCRIPTION_LONGDESCRIPTION
ATTACHMENT J-0200000-07
ASSET INFORMATION
Name Required
Length
Limit NAVFAC MAXIMO FIELD
AssetNum Y 25 ASSETNUM
Changed Date Y DATE CHANGEDATE
Description Y 100 DESCRIPTION
Long Description Y 1,000 LONGDESCRIPTION
Master System Y Must match Value List MASTERSYSTEM
System Y Must match Value List SYSTEM
Sub-System Y Must match Value List SUBSYSTEM
Location Y Must match Value List LOCATION
Site ID Y Must match Value List SITEID
Work Center (Person Group) Y Must match Value List PERSONGROUP
Asset Type Y Must match Value List ASSETTYPE
Asset Quantity Y Integer QUANTITY
Inventory Category Y Must match Value List INVENTORYCATEGORY
Purchase Price Y Integer PURCHASEPRICE
Budgeted Cost N Integer BUDGETCOST
Replacement Cost Y Integer REPLACECOST
Meter Group Y Must match Value List GROUPNAME
Belongs To (Parent) N 25 PARENT
Contract Number N 25 Appended to LONGDESCRIPTION
Task/Delivery Order Number N 25 Appended to LONGDESCRIPTION
Drawing Reference ID N 25 Appended to LONGDESCRIPTION
Warranty Expiration Date Y DATE Appended to LONGDESCRIPTION
Status Date N DATE STATUSDATE
Installation Date Y DATE INSTALLDATE
Asset Status Y Must match Value List STATUS
CLASSSTRUCTUREID N Must match Value List CLASSSTRUCTUREID
Job Plan Code N 25 Appended to LONGDESCRIPTION
Equipment Tag Number N 25 Appended to LONGDESCRIPTION
Additional Loc Info Y 250 ADDLOCINFO
Manufacturer Y Must match Value List MANUFACTURER
Model Y 25 MODEL
Serial # Y 25 SERIALNUM
Asset Y 25 Asset siteid Y 8 Asset
CLASSSTRUCTUREID Y 20 N/A
Attribute Y 300 Attribute
Numeric Value N 40 Numeric Value
Alphanumeric N 254 Alphanumeric
Unit of Measure N 8 Unit of Measure
Display Sequence Y 10 N/A
Linear Asset Spec ID Y 12 N/A
Attachment J-0200000-08
Characteristic Meter Reading Information
Name Required
Length
Limit
NAVFAC MAXIMO FIELD
(MEASUMENT / ASSETMETER)
Site Y 8 SITEID/SITEID
Asset Y 25 ASSETNUM/ASSETNUM
Meter Y 15 METER NAME/METER NAME
Observation Y 2 OBSERVATION/LASTREADING
Measurement Date Y 10 MEASUREDATE/LASTREADINGD
ATE
Inspector Y 30 INSPECTOR /
LASTREADINGINSPCTR
Observation Values
Facilities (DCR):
A (Amber)
A+ (Amber Plus)
A- (Amber Minus)
G (Green)
G+ (Green Plus)
G- (Green Minus)
R (Red)
R+ (Red Plus)
R- (Red Minus)
Utilities (UCR):
1 (Best/Highest CI Ranking)
5 (Worst/Lowest CI Ranking)
Attachment J-0200000-09
NAVFAC Maximo Data Reporting
PURPOSE AND OVERVIEW:
The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the
Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for
NAVFAC MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated
NAVFAC business process and procedures for how data is to be submitted.
GENERAL TYPES OF DATA:
Work Order Data:
Work order data includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program or as part of IMP), and work issued as IDIQ.
Asset Data:
Asset data includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected.
When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset.
Condition Assessment Data:
Condition assessment data includes all necessary information for the accurate condition rating of all assets in support of the Infrastructure Condition Assessment Program (ICAP). Specific NAVFAC MAXIMO fields required for condition assessment data are listed on the Characteristic Meter Reading Information spreadsheet provided in J-0200000-09.
METHODS FOR DATA SUBMISSION:
The Contractor shall provide work order, asset, specification, and condition assessment data via Direct Entry.
Direct Data Entry:
The Contractor shall obtain authorized access as specified in Section C and directly enter data into NAVFAC
MAXIMO. Detailed guidance on NAVFAC MAXIMO System Access Procedures is provided in Annex 0200000
Management and Administration, Spec Item 2.6.6.1 System Access. All reference value verification is provided by NAVFAC MAXIMO.
All Contractors personnel who obtain authorized access will be granted entry only within the applicable NAVFAC
MAXIMO screens necessary to enter work order, asset, specification and condition assessment data. Contractors are only authorized to view, edit, report or otherwise access data related to their work. Any unauthorized attempt to do otherwise may be grounds for removal of access privileges. Contractors will be assigned a specific work center code for their work and shall utilize this code for all such data entry and retrieval.
NAVFAC MAXIMO Flat File Data Exchange
NOTE: This Contract specifies that the contractor shall input data into MAXIMO via direct entry, however during times of unavailability; the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .