Amendment0001.pdf
PDF 211 KB Posted
- Solicitation number
- N6945013R3587
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0002.pdf | ||
| J-1502000-02_Site_Map.pdf | ||
| J-1502000-05.xlsx | XLSX spreadsheet | |
| Amendmt0001-Bldg_1032_ATS_Info.pdf | ||
| J-1502000-03-Amend0001.pdf | ||
| Amendmt0001-Bldg_1032_ATS_Drawings.pdf | ||
| Amendment0003.pdf | ||
| J_1502000_Dwgs_26-32.pdf | ||
| N69450-13-R-3587.pdf | ||
| J_1502000_Dwgs_71-73.pdf | ||
| J_1502000_Dwgs_46-55.pdf | ||
| J_1502000_Dwgs_16-25.pdf | ||
| J_1502000_Dwgs_65-70.pdf | ||
| J_1502000_Dwgs_33-36.pdf | ||
| J_1502000_Dwgs_1-7.pdf | ||
| J_1502000_Dwgs_37-45.pdf | ||
| J_1502000_Dwgs_8-15.pdf | ||
| Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| Amend0004-J-B3-01_ELINS_Gen_NAVO.xlsx | XLSX spreadsheet | |
| Amendment_0004.pdf | ||
| Amend0004-J-1502000-06_Minimum_PM_HVAC_and_CRUs.pdf | ||
| Amend0004-J-1502000-04_Equipment_Inventory_REVISED_18_July_2013.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR3230868
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2 for details of Amendment. The proposal due date is not changed.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Jul-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-13-R-3587
X 9B. DATED (SEE ITEM 11)
19-Jun-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jul-2013
CODE
NAVFAC SOUTHEAST
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N69450-13-R-3587
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
1. The purpose of this Amendment is to:
a. Provide the Pre-Proposal Conference/Site Visit Attendance Roster and Agenda.
b. Remove the Rapid Gate requirements identified in Section L, paragraph L.7 (Solicitation
Page 130).
c. Implement Department of Labor All Agency Memorandum #214 dated 18 June 2013 by increasing the Health & Welfare rates (Solicitation Page 87) as stated below:
FROM TO
Per Hour $ 3.71 $ 3.81 Per Week $148.40 $152.40 Per Month $643.07 $660.40
d. Clarify that, as was noted during the Site Visit, the CEP bus on the electrical side is parallel - see Electrical Dwg B-1011.
e. Provide revision to Section C-1502000, paragraph 3.2, for clarification that For Bldg
1011, at least two generators and associated switchgear equipment must remain operable at all time.
f. Provide a revised Attachment J-1502000-04 Equipment Inventory to add a 100 Ton York Chiller for Bldg 1011 and a Kohler Automatic Transfer Switch at Bldg 1032. Equipment Data sheets for the new ATS are also provided.
g. Provide a revised Attachment J-1502000-03/Minimum Preventive Maintenance for Generators.
h. Remove the system generated maximum quantities for FFP CLINs.
i. Provide responses to the below questions:
Q: Please provide information for what security levels will be provided to access each location/equipment.
A: All technicians must have a Secret clearance in accordance with Section C – 0200000, paragraph 2.8.6.
Q: Please provide information on how to obtain those security clearances (where, who, cost, etc).
A: We are researching and will provide response by future amendment.
Q: Please clarify at what frequency each piece of equipment needs to be inspected. There are a lot of sheets for each equipment type that states different things but just a quick snap shot of everything on one sheet would be great.
A: Please see revised Attachment J-1502000-03. Consolidation of the data is not practical.
Q: On attachment J-1502000-03, generators line 1 – it is stated to check the generators 6 times a week. Should this be 5 times a week?
A: Please see revised Attachment J-1502000-03.
Q: Onsite staffing requirements. It does not appear the contractor has to provide a person to be onsite for any fixed length of time. Please confirm what your expectations are.
A: Contractors are required to meet the specified response times and all other contract requirements. Manning is at the Contractor’s discretion.
Q: Workspace and storage. Please confirm what workspace such as a office or desk will be provided if any. Please confirm the storage areas for parts and materials that will be available. Please confirm if these workspaces and storage areas will be secure for contractors use only or are they open storage areas.
A: Yes there is a work space that is outfitted with office and desk. It is a secure office space.
Only the contractor will be in the area. Storage area is available in the Plant along the wall.
The designated work space area may also be used for storage.
Q: Can you provide more clarification of a Integrated Maintenance Plan (IMP)? (definition, purpose, examples, etc).
A: Specification Section C-1502000, paragraph 2.1.6 (Solicitation Page 36) and paragraph
3.4 (Solicitation Page 43) provide definition of, information and requirements for the IMP.
Q: In the ELINS worksheet, the base period and option years has 4 ELIN’s priced per month.
Will we be billing you monthly based on the monthly total of ELIN 1- 4?
A: Yes for the Firm Fixed Price portion of the contract.
2. All other terms and conditions remain unchanged.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The pricing detail quantity has decreased by 463,520.00 from 463,520.00 to 0.00.
CLIN 0003
The pricing detail quantity has decreased by 712,662.00 from 712,662.00 to 0.00.
CLIN 0004
The pricing detail quantity has decreased by 730,479.00 from 730,479.00 to 0.00.
CLIN 0005
The pricing detail quantity has decreased by 748,741.00 from 748,741.00 to 0.00.
CLIN 0006
The pricing detail quantity has decreased by 767,459.00 from 767,459.00 to 0.00.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SECTION C-1502000
Section C – ANNEX 15 1502000 – Facility Investment Table of Content Spec Item
Title
1 General Information
1.1 Concept of Operations
2 Management and Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification and Training
2.3 Workmanship and Material Standards
2.4 Records and Reports
3 FFP Work
3.1 Trouble Calls / Service Calls
3.2 Preventive Maintenance
3.2.1 HVAC and Refrigeration Systems
Spec Item
Title
3.2.2 Centralized UPS/Generator Plant
3.3 Reporting
3.3.1 Monthly Reporting
3.3.2 Quarterly Reporting
3.3.3 Annual Reporting
3.4 Integrated Maintenance Program (IMP)
4 IDIQ Work
1502000 – Facility Investment
Item
Title Description
1 General Information
The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform Facility Investment services, more specifically provide the services of generator, UPS, and HVAC Maintenance at Building 1011 at the Naval Oceanographic Office (NAVO) at John C. Stennis Space Center (SSC), MS, 39529, as outlined below and described in this Performance Work Statement (PWS). This is a combination firm-fixed price (FFP) and indefinite delivery-indefinite quantity (IDIQ).
1.1 Concept of
Operations
The intent of 1502000 Facility Investment is to specify the requirements for the Sustainment, Restoration and Modernization (SRM) sub-functions only. The SRM requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of sustainment.
The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:
-Generators -Uninterruptible Power Systems (UPS) -HVAC and Refrigeration Systems -(See J-1502000-04 for the Equipment list )
Spec Item Title Description 2 Management and
Administration For Contract N69450-13-M-3587
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed herein.
2.1.1 ANSI American National Standards Institute
2.1.2 ASHRAE American Society Heating, Refrigerating and Air Conditioning Engineers
2.1.3 HVAC Heating, Ventilation, and Air Conditioning
2.1.4 IBC International Building Code
2.1.5 IDS Intrusion Detection Systems
2.1.6 Integrated
Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
2.1.7 NFPA National Fire Prevention Association
2.1.8 OEM Original Equipment Manufacturer
2.1.9 Preventive
Maintenance PM consists primarily of inspection, testing, cleaning, lubrication, adjustment, calibration, and minor part and component replacement (such as filters, batteries, belts, (PM) hoses, fluids, oil and grease) as required to verify proper system operation; minimize malfunction, breakdown, and deterioration of systems and equipment; and maximize useful life.
2.1.10 Service Call Service calls are classified as emergency or routine work requests. Service calls are called into the work reception center by building occupants or generated by designated Government or Contractor representatives; are brief in scope; and do not reasonably require detailed job planning. Multiple maintenance, repair, and minor construction requirements received for the same trade in the same building or structure at the same time will be combined into one service call as long as the service call threshold is not exceeded.
2.1.10.1 Emergency
Service Call
Emergency service call is work requiring immediate action to correct or prevent loss or damage to Government property and assets, restore disrupted essential services, or eliminate life-threatening hazards to personnel or property.
2.1.10.2 Routine Service
Call
Service calls that are not an emergency in nature.
2.1.11 SRM Sustainment, Restoration and Modernization
2.1.12 UFC Unified Facilities Criteria
2.1.13 UPV Unfired Pressure Vessel
2.1.13 UPS Uninterruptible Power Supply
2.1.14 VTE Vertical Transportation Equipment
2.1.15 Weight Handling
Equipment
(WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers).
2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operation, maintenance and repair within the Facility Investment (FI) function.
2.2.1 Certification and
Training
All maintenance and repair shall be performed by personnel trained and certified by the OEM.
Personnel inspecting, witnessing tests, preparing reports, and issuing certificates for boilers and UPVs must be qualified per UFC 3-430-07.
Personnel working on systems, equipment or components containing chlorofluorocarbons (CFCs) and/or hydro-chlorofluorocarbons (HCFCs) must be certified under an Environmental Protection Agency (EPA) approved technical certification program per OPNAVINST 5090.1 Chapter 6.
Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200.
Personnel performing work in HAZMAT/HAZWASTE must complete the HAZMAT/HAZWASTE handling course or have a minimum of one year of experience working with HAZMAT/HAZWASTE.
All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.
2.3 Workmanship
and Material Standards
Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.
Workmanship for maintenance and repair shall include all work necessary to complete system restoration, including operational checks. Upon completion of work, the Contractor shall ensure all systems, and equipment are free of missing components or defects, which would affect the safety, appearance, or habitability of the facilities or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes.
The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.
2.4 Records and
Reports
Records and reports are listed in Section F of the solicitation. The Contractor shall submit accurate and complete documents within the required timeframes.
1502000 – Facility Investment Spec Item Title Performance
Objective Related Information Performance
Standard 3 FFP Work The Contractor shall maintain, repair, and alter facilities, systems, and equipment to ensure they are fully functional and operational.
A system consists of the equipment listed in inventory, as well as all associated piping, wiring, ductwork, controls, and ancillary equipment.
The work will consist of development and implementation of Repair, PM, Reporting, and full responsibility IMP programs, and other recurring services.
The Contractor shall maintain current all facility maintenance data and warranty records in the technical library and CMMS per Annex 2. The KO may request a report at any time and the Contractor shall provide the detailed report within 24 hours.
The current facility inventory is provided in J-1502000-04.
Site maps are provided in J- 1502000-02.
Battery replacement as an integral part of UPS back-up systems is excluded from FFP work. Any and all battery replacement will be completed either by IDIQ or a separate contract.
Facilities, systems, and equipment are in an operable condition and function properly in accordance with specified standards.
Maintenance or repair items outside the scope of FPP work are identified for service either by IDIQ, shops personnel, or separate contract.
3.1 Trouble Calls/ The Contractor shall The Contractor shall receive Service/ trouble calls
Service Calls perform trouble call work in a timely manner.
The Contractor will be totally responsible for all equipment under the IMP up to the Limit of Liability (LOL) of $3,000 labor and material cost per piece of equipment per occurrence.
If there is a repair or replacement of a piece of equipment required, the LOL of $3,000 will be deducted from the cost to the Government.
trouble calls in accordance with the work reception requirements in Annex 2.
The Contractor shall schedule and perform trouble calls in a way that minimize disruptions to customers and Government operations.
The Contractor shall perform trouble calls to accomplish any work identified within the entire boundary of the installation and will include a wide variety of work.
The Contractor shall maintain sufficient materials and equipment on hand to support trouble call work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete trouble call work within the time limits specified.
The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one trouble call as long as the trouble call threshold is not exceeded.
FFP Service and Emergency Trouble calls costs shall not exceed $3,000 per occurrence.
The Contractor shall notify the KO upon identification that the trouble call will exceed the limit listed above in accordance with reporting requirements in Annex 2. IDIQ work may be issued for repairs exceeding the trouble call limit.
responded to within one hour of receipt of call.
Service/ trouble calls completed within 48 hours of receipt of call.
Work is continued without interruption until emergent condition is mitigated.
Building 1011 equipments are restored to normal working condition, including recertification if applicable.
When repair is complete the Building 1011 equipment does not present danger to personnel or other equipment.
3.2 Preventive
Maintenance:
The Contractor shall develop and implement a PM program for systems and equipment to ensure proper operation, to minimize breakdowns, and to
The Contractor shall submit a PM program to the KO to validate completeness. The PM program shall be developed based on an economical approach, manufacturers’ recommended procedures, OEM standards, and
The Contractor’s PM program is submitted with their technical proposal.
PM is accomplished per the Contractor's maximize useful life.
For Bldg 1011,at least two generators and associated switchgear equipment must remain operable at all time.
maintenance required to satisfy equipment warranties.
As a minimum, the work described in J-1502000-03 will be provided to all systems.
The systems and equipment, including associated inventories that shall be included in the PM program are addressed in the PM Spec Items below.
The Contractor shall perform any repairs up to $3,000 per PM occurrence.
Notification of repair work exceeding the PM limit shall be submitted to the KO by close of business the following day of identification.
IDIQ work may be issued for repairs exceeding the PM limit;
however, the Government will only be liable for the amount of cost exceeding the Contractor’s liability limit. ($3,000.00)
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.
The Contractor shall submit a monthly PM schedule and unaccomplished PM report.
program and work schedule.
No unscheduled system outages due to PM work.
3.2.1 HVAC and
Refrigeration Systems
The Contractor shall perform PM for HVAC and refrigeration systems and equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The HVAC and refrigeration system inventory is provided in J- 1502000-04.
As a minimum, the work described in J-1502000-06 will be provided to all systems.
The Contractor shall not vent or otherwise dispose of any Class I ozone-depleting refrigerant in a manner that will permit its release into the environment. These
PM is accomplished per the Contractor's program and work schedule.
Repairs within the PM limit are accomplished prior to PM completion.
Notification of repair work exceeding the PM limit is submitted to the refrigerants shall be captured and recycled in accordance with all Federal, state, and local environmental regulations.
The Contractor shall perform any repairs up to $3,000 per PM occurrence.
Notification of repair work exceeding the PM limit shall be submitted to the KO by close of business the following day of identification.
IDIQ work may be issued for repairs exceeding the PM limit;
however, the Government will only be liable for the amount of cost exceeding the Contractor’s liability limit. ($3,000.00)
KO within the specified time limit.
3.2.1.1 3.2.1.1 HVAC
Seasonal Start- Up and Shutdown
The Contractor shall perform seasonal start-up and shutdown to ensure HVAC systems are prepared and activated at the start of each season and deactivated and preserved at the end of each season.
The Contractor shall perform start-up and shutdown of those HVAC systems identified in J-1502000-04.
The air conditioning systems listed are normally shutdown during the months of October or November, and started up during the months of April or May; however, the length of the season will vary and no adjustment in the contract price will be made regardless of the actual length of the season.
The KO will advise the Contractor of the specific date or dates when such services should begin to be accomplished.
Fall shutdown shall include securing and winterizing the air conditioning system and activating steam, electric, or gas heating system and resetting all thermostats as required.
Spring start-up shall include activating the air conditioning system and securing and preserving all heating coils or heat exchangers and resetting all
Seasonal start-up and shutdown work must be completed within three working days of the specified start date for equipment in individual buildings, or within ten working days if services are ordered for all systems at the same time.
Repairs within the PM limit are accomplished prior to PM completion.
Notification of repair work exceeding the PM limit is submitted to the KO within the specified time limit.
thermostats as required.
A service call will be issued for a repeat startup and shutdown of each designated HVAC system.
3.2.1.2 HVAC Water
Treatment Services
The Contractor shall provide and implement a HVAC Water Testing and Treatment Program to ensure optimum equipment operation and to maximize useful life.
The Contractor shall develop a HVAC Water Testing and Treatment Program for water-cooled chillers and cooling towers per equipment manufacturer’s specifications and ASHRAE standards for applicable equipment.
The Contractor shall submit the HVAC Water Testing and Treatment Program within 30 calendar days following contract award to the KO to validate completeness.
Sampling and testing is accomplished per the Contractor's program and schedule.
Test results confirm that cooling or chilled water meets the chemical residual limits per the Contractor’s HVAC Water Testing and Treatment Program.
3.2.2 Centralized
UPS/Generator Plant
The Contractor shall perform PM on equipment in new power plant to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The equipment in power plant inventory is provided in J- 1502000-04.
All maintenance and repair shall be performed by personnel trained and certified by the OEM.
Maintenance shall comply with all OEM requirements and standards.
The Contractor’s PM program shall include periodic startup, run and load test of all emergency generators to ensure operability.
PM is accomplished per the Contractor's program and work schedule.
Repairs within the PM limit are accomplished prior to PM completion.
Notification of repair work exceeding the PM limit is submitted to the KO within the specified time limit.
Electrical power is provided in a timely manner to meet the demand following a power outage.
3.3 Reporting The Contractor shall
complete all reporting accurately and on time.
The minimum reporting shall be as described in J-1502000-05.
All reporting is completed accurately on time with no omissions or deletions.
3.3.1 Monthly
Reporting
The Contractor shall complete Monthly reporting accurately and on time
The minimum reporting shall be as described in J-1502000-05.
All Monthly Reporting is completed accurately on time with no omissions or deletions.
3.3.2 Quarterly
Reporting
The Contractor shall complete all Quarterly reporting accurately and on time.
The minimum reporting shall be as described in J-1502000-05.
All Quarterly Reporting is completed accurately on time with no omissions or deletions.
3.3.3 Annual The Contractor shall The minimum reporting shall be as All Annual Reporting is
Reporting complete Annual reporting accurately and on time.
described in J-1502000-05. completed accurately on time with no omissions or deletions.
3.4 Integrated
Maintenance Program
(IMP)
The Contractor shall develop and implement an IMP for systems and equipment to ensure they are safe, fully functional, and operational.
The Contractor shall submit an IMP to the KO to validate completeness. The IMP shall include the Contractor’s approach for Integrated Maintenance, including maintenance and inspection tasks, schedules for planned work accomplishment, plan for minimizing occurrence of repair and downtime, process for the identification of the need for repairs, and the process for scheduling and completing repair work.
The systems and equipment, including associated inventories, that shall be included in the IMP are addressed in the IMP Spec Items below.
As part of the IMP, the Contractor has full responsibility for any individual occurrence of repair, including replacement, up to and including the Contractor’s liability limit, $3,000 in direct material and labor cost.
The Contractor shall, per Annex 2, notify the KO upon identification that the repair will exceed the liability limit listed above. If the estimated cost of the repair exceeds the Contractor’s liability limit, the Government may order the work under the IDIQ section of this contract; however, the Government will only be liable for the amount of cost exceeding the Contractor’s liability limit.
The Contractor shall perform all repairs, whether identified as part of their routine IMP accomplishment, QC inspections, or notification from the Government that a breakdown or malfunction has occurred.
The Contractor’s IMP is submitted with their technical proposal.
IMP is accomplished per Contractor's program and work schedule.
When a problem or a need for repair is identified, the Contractor shall respond within one hour and complete the repair within two working days.
Systems and equipment are maintained and repaired to sustain a fully functional and operable condition in accordance with OEM specifications.
Work is accomplished per Spec Item 2.4, Workmanship and Material Standards.
When repair is complete the facility, system, or equipment does not present any hazard or danger to personnel.
If the Government identifies a problem or a need for repair, the Government will notify the Contractor.
Service calls will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
There is no Historical data on IMP repairs because the equipment and facility is new.
The Contractor shall submit a monthly IMP schedule and IMP Maintenance and Repair Status Report.
Item
Title Performance Objective
Related Information Performance Standard
4 IDIQ Work IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the
PROCEDURES FOR
ISSUING ORDERS
clause in Section G.
The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to IDIQ ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for IDIQ work will be the same as those in Spec Item 3 where applicable.
IDIQ work will initially consist of Unit Priced Labor (UPL) work;
however, Unit Priced Tasks (UPT) may be established post-award by contract modification for ordering by the Government, as required.
The following have been deleted:
SECTION C-0200000
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-OCT-2013 TO
30-JUN-2014
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335 FOB: Destination
N69450
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-OCT-2013 TO
30-JUN-2014
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item for CLIN 0002 has been changed from:
POP 01-OCT-2013 TO
30-JUN-2018
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
POP 01-OCT-2013 TO
30-JUN-2018
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item for CLIN 0003 has been changed from:
POP 01-JUL-2014 TO
30-JUN-2015
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
POP 01-JUL-2014 TO
30-JUN-2015
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item for CLIN 0004 has been changed from:
POP 01-JUL-2015 TO
30-JUN-2016
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
POP 01-JUL-2015 TO
30-JUN-2016
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item for CLIN 0005 has been changed from:
POP 01-JUL-2016 TO
30-JUN-2017
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
POP 01-JUL-2016 TO
30-JUN-2017
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item for CLIN 0006 has been changed from:
POP 01-JUL-2017 TO
30-JUN-2018
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
POP 01-JUL-2017 TO
30-JUN-2018
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
SECTION F - DELIVERIES/ PERFOR
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
REV WAGE DETE - AMENDMENT 0001
ATTACHMENT J‐0200000‐02
WAGE DETERMINATION
WD 05-2301 (Rev.-12) was first posted on www.wdol.gov on 06/19/2012
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2301 Diane C. Koplewski Division of | Revision No.: 12 Director Wage Determinations| Date Of Revision: 06/13/2012 State: Mississippi
Area: Mississippi Counties of George, Hancock, Harrison, Jackson, Pearl River, Stone **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 12.39 01012 - Accounting Clerk II 15.08 01013 - Accounting Clerk III 16.77 01020 - Administrative Assistant 18.76 01040 - Court Reporter 14.61 01051 - Data Entry Operator I 10.76 01052 - Data Entry Operator II 12.08 01060 - Dispatcher, Motor Vehicle 15.59 01070 - Document Preparation Clerk 11.31 01090 - Duplicating Machine Operator 11.31 01111 - General Clerk I 11.03 01112 - General Clerk II 12.04 01113 - General Clerk III 13.67 01120 - Housing Referral Assistant 16.29 01141 - Messenger Courier 9.56 01191 - Order Clerk I 12.09 01192 - Order Clerk II 14.67 01261 - Personnel Assistant (Employment) I 13.54 01262 - Personnel Assistant (Employment) II 15.14 01263 - Personnel Assistant (Employment) III 16.89 01270 - Production Control Clerk 18.74 01280 - Receptionist 11.19 01290 - Rental Clerk 10.82 01300 - Scheduler, Maintenance 13.06 01311 - Secretary I 13.06 01312 - Secretary II 14.61 01313 - Secretary III 16.29 01320 - Service Order Dispatcher 12.47 01410 - Supply Technician 18.10 01420 - Survey Worker 13.80 01531 - Travel Clerk I 11.65 01532 - Travel Clerk II 12.37 01533 - Travel Clerk III 12.97 01611 - Word Processor I 13.29 01612 - Word Processor II 14.92 01613 - Word Processor III 16.69 05000 - Automotive Service Occupations
05005 - Automobile Body Repairer, Fiberglass 21.73 05010 - Automotive Electrician 17.59 05040 - Automotive Glass Installer 16.90 05070 - Automotive Worker 16.90 05110 - Mobile Equipment Servicer 15.49 05130 - Motor Equipment Metal Mechanic 18.27 05160 - Motor Equipment Metal Worker 16.90 05190 - Motor Vehicle Mechanic 19.39 05220 - Motor Vehicle Mechanic Helper 14.84 05250 - Motor Vehicle Upholstery Worker 16.20 05280 - Motor Vehicle Wrecker 16.90 05310 - Painter, Automotive 17.59 05340 - Radiator Repair Specialist 16.90 05370 - Tire Repairer 12.36 05400 - Transmission Repair Specialist 18.27 07000 - Food Preparation And Service Occupations 07010 - Baker 11.15 07041 - Cook I 10.34 07042 - Cook II 11.28 07070 - Dishwasher 8.77 07130 - Food Service Worker 8.41 07210 - Meat Cutter 13.16 07260 - Waiter/Waitress 8.83 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 16.50 09040 - Furniture Handler 13.10 09080 - Furniture Refinisher 16.50 09090 - Furniture Refinisher Helper 13.94 09110 - Furniture Repairer, Minor 15.20 09130 - Upholsterer 16.50 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 9.14 11060 - Elevator Operator 9.14 11090 - Gardener 12.62 11122 - Housekeeping Aide 10.53 11150 - Janitor 10.53 11210 - Laborer, Grounds Maintenance 10.96 11240 - Maid or Houseman 8.89 11260 - Pruner 10.35 11270 - Tractor Operator 12.20 11330 - Trail Maintenance Worker 10.96 11360 - Window Cleaner 11.11 12000 - Health Occupations 12010 - Ambulance Driver 14.53 12011 - Breath Alcohol Technician 15.99 12012 - Certified Occupational Therapist Assistant 18.30 12015 - Certified Physical Therapist Assistant 16.64 12020 - Dental Assistant 13.64 12025 - Dental Hygienist 26.82 12030 - EKG Technician 24.24 12035 - Electroneurodiagnostic Technologist 24.24 12040 - Emergency Medical Technician 14.53 12071 - Licensed Practical Nurse I 14.30 12072 - Licensed Practical Nurse II 15.99 12073 - Licensed Practical Nurse III 17.83 12100 - Medical Assistant 13.23 12130 - Medical Laboratory Technician 13.98 12160 - Medical Record Clerk 12.63 12190 - Medical Record Technician 14.22 12195 - Medical Transcriptionist 13.85 12210 - Nuclear Medicine Technologist 30.24 12221 - Nursing Assistant I 9.73 12222 - Nursing Assistant II 10.94 12223 - Nursing Assistant III 11.94 12224 - Nursing Assistant IV 13.40 12235 - Optical Dispenser 15.66 12236 - Optical Technician 12.82 12250 - Pharmacy Technician 13.17 12280 - Phlebotomist 13.52 12305 - Radiologic Technologist 21.02
12311 - Registered Nurse I 22.23 12312 - Registered Nurse II 25.94 12313 - Registered Nurse II, Specialist 27.19 12314 - Registered Nurse III 32.89 12315 - Registered Nurse III, Anesthetist 32.89 12316 - Registered Nurse IV 39.42 12317 - Scheduler (Drug and Alcohol Testing) 19.82 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 16.83 13012 - Exhibits Specialist II 20.86 13013 - Exhibits Specialist III 25.61 13041 - Illustrator I 16.83 13042 - Illustrator II 20.86 13043 - Illustrator III 25.61 13047 - Librarian 23.09 13050 - Library Aide/Clerk 9.77 13054 - Library Information Technology Systems 20.86 Administrator 13058 - Library Technician 12.78 13061 - Media Specialist I 15.05 13062 - Media Specialist II 16.83 13063 - Media Specialist III 18.77 13071 - Photographer I 12.74 13072 - Photographer II 14.25 13073 - Photographer III 17.66 13074 - Photographer IV 21.74 13075 - Photographer V 26.13 13110 - Video Teleconference Technician 14.62 14000 - Information Technology Occupations 14041 - Computer Operator I 14.48 14042 - Computer Operator II 16.20 14043 - Computer Operator III 18.76 14044 - Computer Operator IV 20.07 14045 - Computer Operator V 22.22 14071 - Computer Programmer I (see 1) 20.43 14072 - Computer Programmer II (see 1) 25.30 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 14.48 14160 - Personal Computer Support Technician 20.07 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 27.76 15020 - Aircrew Training Devices Instructor (Rated) 33.59 15030 - Air Crew Training Devices Instructor (Pilot) 40.14 15050 - Computer Based Training Specialist / Instructor 27.76 15060 - Educational Technologist 34.22 15070 - Flight Instructor (Pilot) 40.14 15080 - Graphic Artist 19.42 15090 - Technical Instructor 19.73 15095 - Technical Instructor/Course Developer 22.52 15110 - Test Proctor 15.92 15120 - Tutor 15.92 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 8.97 16030 - Counter Attendant 8.97 16040 - Dry Cleaner 10.38 16070 - Finisher, Flatwork, Machine 8.97 16090 - Presser, Hand 8.97 16110 - Presser, Machine, Drycleaning 8.97 16130 - Presser, Machine, Shirts 8.97 16160 - Presser, Machine, Wearing Apparel, Laundry 8.97 16190 - Sewing Machine Operator 11.00 16220 - Tailor 11.65 16250 - Washer, Machine 9.36 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 18.58 19040 - Tool And Die Maker 21.01
21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 15.50 21030 - Material Coordinator 18.74 21040 - Material Expediter 18.74 21050 - Material Handling Laborer 11.36 21071 - Order Filler 11.80 21080 - Production Line Worker (Food Processing) 15.50 21110 - Shipping Packer 12.52 21130 - Shipping/Receiving Clerk 12.52 21140 - Store Worker I 14.79 21150 - Stock Clerk 16.50 21210 - Tools And Parts Attendant 15.50 21410 - Warehouse Specialist 15.50 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 24.47 23021 - Aircraft Mechanic I 23.29 23022 - Aircraft Mechanic II 24.47 23023 - Aircraft Mechanic III 25.68 23040 - Aircraft Mechanic Helper 18.92 23050 - Aircraft, Painter 22.06 23060 - Aircraft Servicer 20.66 23080 - Aircraft Worker 21.56 23110 - Appliance Mechanic 18.58 23120 - Bicycle Repairer 12.36 23125 - Cable Splicer 22.88 23130 - Carpenter, Maintenance 17.95 23140 - Carpet Layer 14.76 23160 - Electrician, Maintenance 19.75 23181 - Electronics Technician Maintenance I 20.75 23182 - Electronics Technician Maintenance II 21.51 23183 - Electronics Technician Maintenance III 22.25 23260 - Fabric Worker 17.20 23290 - Fire Alarm System Mechanic 20.09 23310 - Fire Extinguisher Repairer 16.49 23311 - Fuel Distribution System Mechanic 21.51 23312 - Fuel Distribution System Operator 16.76 23370 - General Maintenance Worker 14.91 23380 - Ground Support Equipment Mechanic 23.29 23381 - Ground Support Equipment Servicer 20.66 23382 - Ground Support Equipment Worker 21.56 23391 - Gunsmith I 16.49 23392 - Gunsmith II 17.92 23393 - Gunsmith III 19.91 23410 - Heating, Ventilation And Air-Conditioning 18.90 Mechanic 23411 - Heating, Ventilation And Air Contditioning 19.16 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 18.79 23440 - Heavy Equipment Operator 16.03 23460 - Instrument Mechanic 19.91 23465 - Laboratory/Shelter Mechanic 18.58 23470 - Laborer 11.36 23510 - Locksmith 18.22 23530 - Machinery Maintenance Mechanic 20.21 23550 - Machinist, Maintenance 18.65 23580 - Maintenance Trades Helper 15.22 23591 - Metrology Technician I 19.91 23592 - Metrology Technician II 20.59 23593 - Metrology Technician III 21.20 23640 - Millwright 19.82 23710 - Office Appliance Repairer 16.72 23760 - Painter, Maintenance 15.08 23790 - Pipefitter, Maintenance 18.47 23810 - Plumber, Maintenance 17.40 23820 - Pneudraulic Systems Mechanic 19.91 23850 - Rigger 19.91 23870 - Scale Mechanic 17.92 23890 - Sheet-Metal Worker, Maintenance 18.08 23910 - Small Engine Mechanic 13.96 23931 - Telecommunications Mechanic I 24.20
23932 - Telecommunications Mechanic II 27.78 23950 - Telephone Lineman 20.70 23960 - Welder, Combination, Maintenance 17.57 23965 - Well Driller 18.90 23970 - Woodcraft Worker 19.91 23980 - Woodworker 17.07 24000 - Personal Needs Occupations 24570 - Child Care Attendant 8.61 24580 - Child Care Center Clerk 11.40 24610 - Chore Aide 11.01 24620 - Family Readiness And Support Services 15.82 Coordinator 24630 - Homemaker 12.19 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 19.60 25040 - Sewage Plant Operator 16.13 25070 - Stationary Engineer 19.60 25190 - Ventilation Equipment Tender 15.23 25210 - Water Treatment Plant Operator 15.97 27000 - Protective Service Occupations 27004 - Alarm Monitor 13.21 27007 - Baggage Inspector 11.23 27008 - Corrections Officer 12.80 27010 - Court Security Officer 15.40 27030 - Detection Dog Handler 15.38 27040 - Detention Officer 12.80 27070 - Firefighter 17.64 27101 - Guard I 11.23 27102 - Guard II 15.38 27131 - Police Officer I 15.75 27132 - Police Officer II 17.50 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 11.14 28042 - Carnival Equipment Repairer 12.75 28043 - Carnival Equpment Worker 9.60 28210 - Gate Attendant/Gate Tender 14.28 28310 - Lifeguard 12.19 28350 - Park Attendant (Aide) 15.97 28510 - Recreation Aide/Health Facility Attendant 11.66 28515 - Recreation Specialist 19.61 28630 - Sports Official 12.72 28690 - Swimming Pool Operator 17.32 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 20.56 29020 - Hatch Tender 19.81 29030 - Line Handler 19.81 29041 - Stevedore I 19.70 29042 - Stevedore II 21.36 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 35.77 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 24.66 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 27.16 30021 - Archeological Technician I 17.91 30022 - Archeological Technician II 20.08 30023 - Archeological Technician III 24.82 30030 - Cartographic Technician 26.10 30040 - Civil Engineering Technician 18.35 30061 - Drafter/CAD Operator I 18.63 30062 - Drafter/CAD Operator II 21.06 30063 - Drafter/CAD Operator III 23.45 30064 - Drafter/CAD Operator IV 28.86 30081 - Engineering Technician I 16.25 30082 - Engineering Technician II 18.24 30083 - Engineering Technician III 20.44 30084 - Engineering Technician IV 25.28 30085 - Engineering Technician V 31.68 30086 - Engineering Technician VI 37.41 30090 - Environmental Technician 23.70 30210 - Laboratory Technician 18.70 30240 - Mathematical Technician 25.12
30361 - Paralegal/Legal Assistant I 15.77 30362 - Paralegal/Legal Assistant II 19.54 30363 - Paralegal/Legal Assistant III 23.91 30364 - Paralegal/Legal Assistant IV 28.92 30390 - Photo-Optics Technician 25.12 30461 - Technical Writer I 24.33 30462 - Technical Writer II 27.26 30463 - Technical Writer III 32.98 30491 - Unexploded Ordnance (UXO) Technician I 22.74 30492 - Unexploded Ordnance (UXO) Technician II 27.51 30493 - Unexploded Ordnance (UXO) Technician III 32.97 30494 - Unexploded (UXO) Safety Escort 22.74 30495 - Unexploded (UXO) Sweep Personnel 22.74 30620 - Weather Observer, Combined Upper Air Or (see 2) 23.45 Surface Programs 30621 - Weather Observer, Senior (see 2) 25.12 31000 - Transportation/Mobile Equipment Operation Occupations 31020 - Bus Aide 9.59 31030 - Bus Driver 14.48 31043 - Driver Courier 12.79 31260 - Parking and Lot Attendant 8.66 31290 - Shuttle Bus Driver 13.37 31310 - Taxi Driver 10.09 31361 - Truckdriver, Light 13.37 31362 - Truckdriver, Medium 15.35 31363 - Truckdriver, Heavy 18.33 31364 - Truckdriver, Tractor-Trailer 18.33 99000 - Miscellaneous Occupations 99030 - Cashier 8.64 99050 - Desk Clerk 9.43 99095 - Embalmer 22.74 99251 - Laboratory Animal Caretaker I 13.56 99252 - Laboratory Animal Caretaker II 13.95 99310 - Mortician 22.74 99410 - Pest Controller 12.79 99510 - Photofinishing Worker 11.95 99710 - Recycling Laborer 14.77 99711 - Recycling Specialist 16.34 99730 - Refuse Collector 13.46 99810 - Sales Clerk 11.54 99820 - School Crossing Guard 13.99 99830 - Survey Party Chief 16.49 99831 - Surveying Aide 10.91 99832 - Surveying Technician 14.98 99840 - Vending Machine Attendant 13.25 99841 - Vending Machine Repairer 15.07 99842 - Vending Machine Repairer Helper 12.35
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $3.81 per hour or $152.40 per week or $660.40 per month
VACATION: 1 week paid vacation after 1 year of service with a contractor or successor; 2 weeks after 2 years; 3 weeks after 5 years; and 4 weeks after 15 years.
Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE FOLLOWING:
1) COMPUTER EMPLOYEES: Under the SCA at section 8(b), this wage determination does not apply to any employee who individually qualifies as a bona fide executive, administrative, or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals, (29 C.F.R. 541.
400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition, because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds $27.63 per hour conformances may be necessary for certain nonexempt employees. For example, if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate, then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.
Additionally, because job titles vary widely and change quickly in the computer industry, job titles are not determinative of the application of the computer professional exemption. Therefore, the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:
(1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications;
(2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications;
(3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or
(4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400).
2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS - NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic pay for any hours worked between 6pm and 6am.
If you are a full-time employed (40 hours a week) and Sunday is part of your regularly scheduled workweek, you are paid at your rate of basic pay plus a Sunday premium of 25% of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .