Amendment_0004.pdf
PDF 757 KB Posted
- Solicitation number
- N6945013R3587
About this file
Amendment 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0002.pdf | ||
| J-1502000-02_Site_Map.pdf | ||
| J-1502000-05.xlsx | XLSX spreadsheet | |
| Amendmt0001-Bldg_1032_ATS_Info.pdf | ||
| J-1502000-03-Amend0001.pdf | ||
| Amendmt0001-Bldg_1032_ATS_Drawings.pdf | ||
| Amendment0003.pdf | ||
| Amendment0001.pdf | ||
| J_1502000_Dwgs_26-32.pdf | ||
| N69450-13-R-3587.pdf | ||
| J_1502000_Dwgs_71-73.pdf | ||
| J_1502000_Dwgs_46-55.pdf | ||
| J_1502000_Dwgs_16-25.pdf | ||
| J_1502000_Dwgs_65-70.pdf | ||
| J_1502000_Dwgs_33-36.pdf | ||
| J_1502000_Dwgs_1-7.pdf | ||
| J_1502000_Dwgs_37-45.pdf | ||
| J_1502000_Dwgs_8-15.pdf | ||
| Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0005.pdf | ||
| Amend0004-J-B3-01_ELINS_Gen_NAVO.xlsx | XLSX spreadsheet | |
| Amend0004-J-1502000-06_Minimum_PM_HVAC_and_CRUs.pdf | ||
| Amend0004-J-1502000-04_Equipment_Inventory_REVISED_18_July_2013.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR3230868
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to add maintenance of Computer Room Units as Optional Firm Fixed Price Bid Items. Revised Attachments J-B3-01 ELINS; J-1502000-04 Equipment Inventory; and J-1502000-06 Minimum PM HVAC and CRUs are provided, accordingly. The Section J Table of Contents is modified to reflect the revised titling of the above attachments. The Contract Line Item Numbering is revised to incorporate Optional FFP pricing of this w ork. These items w ere included in the site visit held previously. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jul-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-13-R-3587
X 9B. DATED (SEE ITEM 11)
19-Jun-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jul-2013
CODE
NAVFAC SOUTHEAST
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N69450-13-R-3587
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from BASE YEAR - FIRM FIXED PRICE (FFP) to BASE PERIOD -
FIRM FIXED PRICE (FFP).
The CLIN extended description has changed from Provide maintenance services for identified generators and related systems at Stennis Space Center, MS, in accordance with the terms and conditions of the contract.
Proposed price shall be the total from Attachment J-B.3-01 Exhibit Line Item Numbers (ELINs) for the Base Period
- FFP. The Firm Fixed Price portion of the contract shall be funded on Task Order 0001, which shall satisfy the Government's obligation for a minimum guarantee. to Provide maintenance services for identified generators and related systems (excluding Optional Bid Items/CRUs) at Stennis Space Center, MS, in accordance with the terms and conditions of the contract. Proposed price shall be the total from Attachment J-B.3-01 Exhibit Line Item Numbers (ELINs) for the Base Period - FFP. The Firm Fixed Price portion of the contract shall be funded on Task Order 0001, which shall satisfy the Government's obligation for a minimum guarantee..
CLIN 0002
This CLIN has been renumbered to CLIN 0003.
CLIN 0003
This CLIN has been renumbered to CLIN 0004.
CLIN 0004
This CLIN has been renumbered to CLIN 0006.
CLIN 0005
This CLIN has been renumbered to CLIN 0008.
CLIN 0006
This CLIN has been renumbered to CLIN 0010.
CLIN 0002 is added as follows:
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 Each
OPTION BASE PERIOD - OPTIONAL FFP
FFP
Provide maintenance services for Optional Bid Items (CRU's) identified on page 2 of the Equipment Inventory at Stennis Space Center, MS, in accordance with the terms and conditions of the contract. Proposed price shall be the total from Attachment J-B.3-01 Exhibit Line Item Numbers (ELINs) for the Base Period - Opt FFP.
FOB: Destination
MAX
NET AMT
CLIN 0005 is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0005 Each
OPTION OPTION YEAR ONE - OPT FFP
FFP
Provide maintenance services for Optional Bid Items (CRU's) identified on page 2 of the Equipment Inventory at Stennis Space Center, MS, in accordance with the terms and conditions of the contract. Proposed price shall be the total from Attachment J-B.3-01 Exhibit Line Item Numbers (ELINs) for the Option Year One - Opt FFP.
CLIN 0007 is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0007 Each
OPTION OPTION YEAR TWO - OPT FFP
FFP
Provide maintenance services for Optional Bid Items (CRU's) identified on page 2 of the Equipment Inventory at Stennis Space Center, MS, in accordance with the terms and conditions of the contract. Proposed price shall be the total from Attachment J-B.3-01 Exhibit Line Item Numbers (ELINs) for the Option Year Two - Opt FFP.
CLIN 0009 is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0009 Each
OPTION OPTION YEAR THREE - OPT FFP
FFP
Provide maintenance services for Optional Bid Items (CRU's) identified on page 2 of the Equipment Inventory at Stennis Space Center, MS, in accordance with the terms and conditions of the contract. Proposed price shall be the total from Attachment J-B.3-01 Exhibit Line Item Numbers (ELINs) for the Option Year Three - Opt FFP.
CLIN 0011 is added as follows:
UNIT UNIT PRICE MAX AMOUNT
0011 Each
OPTION OPTION YEAR FOUR - OPT FFP
FFP
Provide maintenance services for Optional Bid Items (CRU's) identified on page 2 of the Equipment Inventory at Stennis Space Center, MS, in accordance with the terms and conditions of the contract. Proposed price shall be the total from Attachment J-B.3-01 Exhibit Line Item Numbers (ELINs) for the Option Year Four - Opt FFP.
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0002:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for CLIN 0005:
The following Acceptance/Inspection Schedule was added for CLIN 0007:
The following Acceptance/Inspection Schedule was added for CLIN 0009:
The following Acceptance/Inspection Schedule was added for CLIN 0011:
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule Item has been deleted from CLIN 0002:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-OCT-2013 TO
30-JUN-2018
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
N69450
The following Delivery Schedule item has been added to CLIN 0002:
POP 01-OCT-2013 TO
30-JUN-2014
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule Item has been deleted from CLIN 0003:
POP 01-JUL-2014 TO
30-JUN-2015
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule Item has been deleted from CLIN 0004:
POP 01-JUL-2015 TO
30-JUN-2016
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule Item has been deleted from CLIN 0005:
POP 01-JUL-2016 TO
30-JUN-2017
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item has been added to CLIN 0005:
POP 01-JUL-2014 TO
30-JUN-2015
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule Item has been deleted from CLIN 0006:
POP 01-JUL-2017 TO
30-JUN-2018
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item has been added to CLIN 0007:
POP 01-JUL-2015 TO
30-JUN-2016
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item has been added to CLIN 0009:
POP 01-JUL-2016 TO
30-JUN-2017
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
The following Delivery Schedule item has been added to CLIN 0011:
POP 01-JUL-2017 TO
30-JUN-2018
N/A NAVFAC SOUTHEAST
CARA L MORANO
PWD GULFPORT FEAD
2401 UPPER NIXON ROAD, BLDG 322
GULFPORT MS 39501-5001
228-871-3335
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
SECTION J TABLE OF CONTENTS
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-B.3-01 EXHIBIT LINE ITEM NUMBERS
J-0200000-01 ACRONYMS and DEFINITIONS
J-0200000-02 WAGE DETERMINATION
J-0200000-03 REFERENCES, INSTRUCTIONS, DIRECTIVES
J-0200000-04 INVOICING PROCEDURES
J-0200000-05 FORMS
J-0200000-06 GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
J-1502000-01 FACILITIES PROPERTY AND SYSTEMS INVENTORY (DRAWINGS)
J-1502000-02 SITE MAPS
J-1502000-03 MINIMUM PREVENTIVE MAINTENANCE FOR GENERATORS
J-1502000-04 EQUIPMENT INVENTORY
J-1502000-05 MINIMUM REPORTING
J-1502000-06 MINIMUM PREVENTIVE MAINTENANCE FOR HVAC & CRU’S
(End of Summary of Changes)
Stennis A B C D E F
Manufacturer TAG DESIGNATION Equipment QTY. Model# Serial #
MGE UPS SYSTEMS UPS 1, UPS 2, UPS 3,
UPS 4, UPS 5
625KVA, 480V, 3P 5 72-131114-44 S07-10306, S07-10307, S07-10308,
S07-10309, S07-10310
MGE UPS SYSTEMS SSC 480V, 3P-4W, 4000A, 65 KAIC 1 99-18514-26 H07-10075
MGE UPS SYSTEMS BD1, BD2, BD3, BD4,
BD5
Battery Disconnects 1600A 5 72-132421-02 N/A
C&D Technologies Battery Banks 5 AT-27 Kohler G1, G2, G3 2MW, 13.8KV, Diesel 3 2250REOZDC 2183830, 2183831,2183832 Kohler Medium Voltage Paralleling Switchgear
13.8KV, 1200A, 500 SCMVA
1 Item # 285 ES-902218 & Item# 296 ES-
90219
Kohler Vibration Isolators 48 Kohler Silencers 3 Kohler Generator Batt Charger / DC Plant 125VDC, 50A, w/ 2kVA inverter
Square D Main Switchgear - Incoming 480V, 3P-4W, 4000A, 65 KAIC
1 Q2C23477145-045
Square D UPS Output Switchgear 480V, 3P-4W, 3200A, 65 KAIC
1 Q2C23477145-045
McQuay CH-1 Chiller - 100 Ton, Glycol & Pump Package Includes Air Separator & Glycol Feeder
1 AGZ120 STNU080200160
McQuay AHU-1, AHU-2, AHU-3, AHU-4, AHU-5, AHU-6
Air Handling Units 6 AHU1-2:
OAH004GDAC OAH004GDAC
AHU3-4:
OAH008GDAC OAH008GDAC
AHU5-6:
OAH045GDAC OAH045GDAC
AHU1-2
FBOU080101379
FBOU080101383
AHU3-4
FBOU080101390
FBOU080101392
AHU5-6
FBOU080101247
FBOU080101248
Cook EF-1, EF-2, EF-3 Exhaust Fans - Gemini Model 3 EF1-2 GC1000/1PH
EF-3 GN-124
Arrow United Industries
MOD-1,2,3,4,5,6,7,8 Dampers (4) 93,860 CFM & (3) 110,700
CFM, (1) 100 CFM
8 AFD-20
Arrow United Industries
L-1,2,3,4,5,6,7,8 Louvers 8 EA-615D (L1-7)
EA-415D (L8)
Reznor UH-1 - UH-11 Unit Heaters 11 Model F UH1-4 Size 75
BGL66W7N22257X, BGF66W7N73923X,
BGF66W7N73925X, BGF66W7N73926X, UH5-
8 Size 25
BGE66W7N62304X BGE66W7N62305X
BGE66W7N68241X BGE66W7N68244X UH-9
Size 75
BGL66W7N22261X
UH10-11 Size 100
BHA66W7N22522X BHA66W7N22520X
Lennox CU-1 Cooling Unit (Split Heat Pump) 1 13HPD-018-230 Lennox FCU-1 Fan Coil Unit 1 CB30M-21/26-4P York 100 ton air cooled chiller; outside Central
Energy Plant
1 YCAR0100SC46XAA 37697159-000 GJR
Kohler 1600 KW Generator; outside Building
1 1600REOZMB 2298915
Liebert 100 KVA UPS; building 1032, Room 1042A
1 NPOWER M08E3R0014
Kohler Automatic Transfer Switch #1; Building 1030, Room 1042A
1 KGS-DMVA-08005 K2208259
Kohler Automatic Transfer Switch #2; Building 1030, Room 1042A
1 KGS-DMVA-0150S K2208258
GM EMD 750 KW Generator; Outside Building 9322
1 5573914 66-J1-1021
YORK 100 Ton York Chiller at Building 1011 Eq Yard 1 YCAR011SC46 SALM-630900
KOHLER * ATS for Building 1032; Low Voltage Paralleling Switchgear, 480/277 VAC, 4W, 60Hz 300A BUSS/Neutral 1000KAIC
* New Equipment, see attached data from construction submittal
Equipment Inventory 1 of 2
J-1502000-04
Computer Room A/C Units (CRUs) - Optional Bid Items
A B C D E F
Manufacturer Location Equipment QTY. Model# Serial #
Liebert 1000 CRU 11 1 FH248CASEI 385470-001
Liebert 1000 CRU 12 1 FH740C-ASEI 385470-002
Liebert 1000 CRU 13 1 FH302C 962118-001
Liebert 1000 CRU 14 1 FH302C 962118-004
Liebert 1000 CRU 15 1 FH302C 962118-002
Liebert 1000 CRU 16 1 FH302C 962118-003
Liebert 1000 CRU 17 1 FH302C 962118-007
Liebert 1000 CRU 18 1 FH302C 962118-005
Liebert 1000 CRU 19 1 FH200C 962118-006
Liebert 1003 CRU 4 1 FH147C-AAH18484 C08A140493
Liebert 1003 CRU 5 1 FH147C-AAH18484 C08A140493
Liebert 1003 CRU 6 1 FH147C-AAH18484 C08A140063
Liebert 1003 CRU 10 1 UH147CCAH18484 C08A140014
Liebert 1003 CRU 11 1 UH147C-CAH18484 C08A140014
Liebert 1003 CRU 12 1 UH200C-AACS225 98225-001
Liebert 9322 CRU 1 1 BU067ADADEI427A N10L740079
Liebert 1002 CRU 1 1 FH302CASM 347612-001
Liebert 1002 CRU 2 1 FH147-A00 129791F
MovinCool 1002 SPOT COOLER 1 CLASSIC PLUS 26 0501-0670-260
Liebert 1032 CRU 1 1 UH376C-AAEI1255 C08F140039
Liebert 1032 CRU 2 1 UH200C-AAEI1255 C08F140038
Liebert 1032 CRU 3 1 UH147C-AAEI1255 C08F140037
Liebert 1032 CRU 4 1 CW114DC1A2A308 N11K150013
Liebert 1032 CRU 5 1 CW114DC1A2A308 N11K150014
Equipment Inventory Page 2 of 2
J-1502000-04
JOHN C. STENNIS SPACE CENTER
MAINTENANCE TASK SHEET # M-2
Reciprocating Chiller Task#1 Frequency- Annual (52weeks)
Step Description
1 Log chiller condition upon arrival to the job site and prior to start of any work. Inspect for vibrations, unusual noises, etc.
2 Pull oil sample and perform a complete oil analysis. Compile a report of the findings and evaluation of the data from the analysis (Shall meet requirements of EXHIBIT II).
3 Obtain refrigerant sample and perform a refrigerant analysis to check for acid and/or moisture.
4 Change oil and filter elements (oil and refrigerant), as determined by oil and refrigerant analysis.
5 Check all refrigerant, oil, chilled water, and condensing water operating temperatures, pressures and flows associated with the chiller during normal operation and verify that all are within manufacturer's recommended parameters. Verify chilled water and condenser water flows are within manufacturer's design. Test the operation of all flow switches, high/low oil switch, high/low compressor discharge and suction refrigerant pressure switches, and operation of all pump auxiliary contacts. Calibrate as needed.
6 Check all motor electrical connections, safety voltage and current devices, starters, etc. Perform thermography on motor controller and associated wiring and connections (from line feed terminals to the equipment load).
7 Meg test compressor motors.
8 Check motor shafts and alignment, as applicable.
9 Lubricate rotating and moving components, as applicable.
10 Switch the lead-lag compressor, as applicable.
11 Check for refrigerant and oil leaks.
12 Clean air cooled condenser coils (where applicable).
13 Check for proper refrigerant charge, superheat and subcooling.
14 Functionally check controls: chilled water temperature, hot gas bypass, J-1502000-06
Page 1 02 of 115
ATTACHMENT J-1502000-06
MINIMUM PREVENTIVE MAINTENANCE FOR HVAC
low ambient controls, condenser water cooling tower bypass, pump interlocks, etc., as applicable.
15 Check the equipment room, the chiller and associated equipment for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.
16 Remove trash, dust and debris from the equipment cabinets, surfaces and equipment room.
17 Check chilled water piping system and peripheral equipment for proper operation, for damage, leaks, rust and corrosion. Clean, paint and repair damaged or corroded equipment and components as applicable.
Task#2 Frequency- 5 Years (260 weeks)
The following requirements shall be performed on each chiller every five (5) years (maximum allowed time span between analysis for a chiller). This work shall be scheduled such that the procedures will be performed on approximately the same number of chillers each fiscal year, and all chillers shall be covered over a five year period.
1 Clean and check chiller tubirg banks: chilled water tubing and condenser water tubing (where applicable).
2 Perform eddie current tubing analysis.
3 Provide a complete inspection/analysis report relative to all work/task performed upon completion. Provide also a report of all discrepancies found as a result of all inspections and analysis along with recommended additional testing, corrections or modifications.
MAINTENANCE TASK SK ET # M Sl
Aar Handling Unit
Frequency- Quarterly (13weeks)
1 Check equipment for proper operation.
2 Replace throw-away filters or clean permanent filters.
Task#2 Frequency-Annual(52 weeks)
1 Clean and flush cooling coils, condensate drain pans and drain lines.
2 Clean heating coils, dampers, screens, plenums, etc., as applicable.
3 Check electrical connections.
4 Check fans and motors for excessive noise, vibration, heat, etc.
5 Lubricate electrical motors, as applicable.
6 Functionally check controls.
7 Check belts, replace as required.
8 Check guards and covers.
9 Check piping and valves for leaks.
10 Check for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.
11 Remove trash, dust and debris from equipment and equipment room .
Page 1 04 of 115
MAINTE;NANCE TASK SHEET # M-13
Gas Unit Heater
Frequency- Annual (52 weeks)
1 Functionally check controls and operation of the unit.
2 Visually inspect the unit for corrosion or damage which could lead to improper combustion or fire hazards.
3 Clean, paint and repair damaged or corroded surfaces and insulation.
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FMFS/Template_c...09-23-08/Hercules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt
Hercules MSDS - CORRSHIELD NMTIN4IM0U2M PREVENTIVE MAINTENANCE FOR HVAC
MATERIAL SAFETY DATA SHEET
BetzDearborn, Division of Hercules Incorporated 4636 Somerton Road Trevose, PA 19053 Business telephone: (215) 355-3300
EMERGENCY TELEPHONE (HEALTH/ACCIDENT)
(800) 877-1940 (USA)
ISSUE DATE: 16-NOV-2001
HMIS RATINGS (See Section 16 for additional information)
HEALTH:2
FLAMMABILITY:1
REACTIVITY:0
1 PRODUCT
IDENTIFICATION
PRODUCT NAME:
CORRSHIELD NT402
PRODUCT APPLICATION AREA:
CORROSION INHIBITOR.
2 COMPOSITION / INFORMATION ON INGREDIENTS
Information for specific product ingredients as required by the U.S. OSHA HAZARD COMMUNICATION STANDARD is listed. Refer to additional sections of this MSDS for our assessment of the potential hazards of this formulation.
HAZARDOUS INGREDIENTS:
CAS# CHEMICAL NAME
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FM...ules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt (1 of 7) [9/24/2008 15:33:18] file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FMFS/Template_c...09-23-08/Hercules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt
7632-00-0 SODIUM NITMIRNIIMTUMEPREVENTIVE MAINTENANCE FOR HVAC
Oxidizer; toxic (by ingestion); potential blood toxin
12179-04-3 BORIC ACID,DISODIUM
SALT,PENTAHYDRATE Irritant (abraded skin); slight irritant (respiratory)
No component is considered to be a carcinogen by the National Toxicology Program, the International Agency for Research on Cancer, or the Occupational Safety and Health Administration at OSHA thresholds for carcinogens.
3 HAZARDS IDENTIFICATION
******************* EMERGENCY OVERVIEW
WARNING
May cause moderate irritation to the skin. Severe irritant to the eyes. Mists/aerosols cause irritation to the upper respiratory tract.
DOT hazard: ORS (when container > RQ) Emergency Response Guide #31 Odor: Slight; Appearance: Yellow, Liquid
Fire fighters should wear positive pressure self-contained breathing apparatus(full face-piece type). Proper fire-extinguishing media:
Flood with water. Use of CO2 or foam may not be effective.
************** POTENTIAL HEALTH EFFECTS
ACUTE SKIN EFFECTS:
Primary route of exposure; May cause moderate irritation to the skin.
ACUTE EYE EFFECTS: Severe irritant to the eyes.
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FM...ules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt (2 of 7) [9/24/2008 15:33:18] file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FMFS/Template_c...09-23-08/Hercules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt
ACUTE RESPIRATORY EFFECMINTIMSU:M PREVENTIVE MAINTENANCE FOR HVAC
Mists/aerosols cause irritation to the upper respiratory tract.
INGESTION
EFFECTS: Toxic;
May cause gastrointestinal irritation with possible nausea, vomiting, headache, dizziness, unconsciousness and injury to the kidneys and liver.
TARGET ORGANS:
Prolonged or repeated exposures may cause CNS depression and/or toxicity to the liver, kidney, and blood system.
MEDICAL CONDITIONS
AGGRAVATED: Not known.
SYMPTOMS OF EXPOSURE:
May cause redness or itching of skin.
4 FIRST AID
MEASURES SKIN
CONTACT:
Remove contaminated clothing. Wash exposed area with a large quantity of soap solution or water for 15 minutes.
EYE CONTACT:
Immediately flush eyes with water for 15 minutes. Immediately contact a physician for additional treatment.
INHALATION:
Remove victim from contaminated area to fresh air. Apply appropriate first aid treatment as necessary.
INGESTION:
Do not feed anything by mouth to an unconscious or convulsive victim. Dilute contents of stomach. Induce vomiting by one of the standard methods. Immediately contact a physician.
NOTES TO
PHYSICIANS: No special instructions
5 FIRE FIGHTING MEASURES
FIRE FIGHTING INSTRUCTIONS:
Fire fighters should wear positive pressure self-contained breathing apparatus (full face-piece type). EXTINGUISHING MEDIA:
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FM...ules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt (3 of 7) [9/24/2008 15:33:18] file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FMFS/Template_c...09-23-08/Hercules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt
Flood with water. Use of CO2 or foam may not be effective.
HAZARDOUS DECOMPOSITIMOINNIMUPMRPOREDVEUNTCIVTE SMA:INTENANCE FOR HVAC
Thermal decomposition (destructive fires) yields elemental oxides.
FLASH POINT:
> 200F > 93C P-M(CC)
MISCELLANEOUS:
ORS (when container > RQ) NA3082;Emergency Response Guide #31
6 ACCIDENTAL RELEASE MEASURES
PROTECTION AND SPILL CONTAINMENT:
Ventilate area. Use specified protective equipment. Contain and absorb on absorbent material. Place in waste disposal container.
Flush area with water. Wet area may be slippery. Spread sand/grit.
DISPOSAL INSTRUCTIONS:
Water contaminated with this product may be sent to a sanitary sewer treatment facility,in accordance with any local agreement,a permitted waste treatment facility or discharged under a permit. Product as is - Incinerate or land dispose in an approved landfill.
7 HANDLING &
STORAGE HANDLING:
Contains an oxidizer. Avoid all contact with reducing agents, oils, greases, organics and acids. Do not allow to dry.
STORAGE:
Keep containers closed when not in use. Protect from freezing.
8 EXPOSURE CONTROLS /
PERSONAL PROTECTION
EXPOSURE LIMITS
CHEMICAL NAME
SODIUM NITRITE
PEL (OSHA): NOT DETERMINED
TLV (ACGIH): NOT DETERMINED
BORIC ACID,DISODIUM
SALT,PENTAHYDRATE PEL (OSHA): NOT
DETERMINED
TLV (ACGIH): 1 MG/M3
ENGINEERING CONTROLS:
Adequate ventilation to maintain air contamJi-1n5a02n0t0s0-0b6elow exposure limits.
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FM...ules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt (4 of 7) [9/24/2008 15:33:18] file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FMFS/Template_c...09-23-08/Hercules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt
PERSONAL PROTECTIVE EQUIPMENT:
Use protective equipment in acMcIoNIrMdUaMnPcReEVwENitThIVE2M9ACINFTERNA1N9C1E 0FOSRuHbVApCart I
RESPIRATORY PROTECTION:
A RESPIRATORY PROTECTION PROGRAM THAT MEETS OSHA'S 29 CFR
1910.134 AND ANSI Z88.2 REQUIREMENTS MUST BE FOLLOWED WHENEVER
WORKPLACE CONDITIONS WARRANT A RESPIRATOR'S USE.
USE AIR PURIFYING RESPIRATORS WITHIN USE LIMITATIONS ASSOCIATED
WITH THE EQUIPMENT OR ELSE USE SUPPLIED AIR-RESPIRATORS.
If air-purifying respirator use is appropriate, use a respirator with dust/mist filters.
SKIN PROTECTION:
rubber gloves-- Wash off after each use. Replace as necessary.
EYE PROTECTION:
splash proof chemical goggles
9 PHYSICAL & CHEMICAL PROPERTIES
Specific Grav.(70F,21C) 1.250 Vapor Pressure (mmHG) ~ 18.0 Freeze Point (F) < < 0 Vapor Density (air=1) < 1.00 Freeze Point (C) < -18
Viscosity(cps 70F,21C) 12 % Solubility (water) 100.0
Odor Slight Appearance Yellow Physical State Liquid Flash Point P-M(CC) > 200F > 93C pH As Is (approx.) 11.6 Evaporation Rate (Ether=1) < 1.00
NA = not applicable ND = not determined
10 STABILITY &
REACTIVITY STABILITY:
Stable under normal storage conditions.
HAZARDOUS POLYMERIZATION:
Will not occur.
INCOMPATIBILITIES:
May react with strong oxidizers.
DECOMPOSITION PRODUCTS:
Thermal decomposition (destructive fires) yJi-1e5l0d2s00e0-l0e6mental oxides.
BETZDEARBORN INTERNAL PUMPOUTP/CagLe 9EoAf 1N5
OUT CATEGORIES:
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FM...ules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt (5 of 7) [9/24/2008 15:33:18] file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FMFS/Template_c...09-23-08/Hercules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt
"B"
11 TOXICOLOGICAL INFORMATION
Oral LD50 RAT: ~275 mg/kg
NOTE - Estimated value Dermal LD50 RABBIT: >5,000 mg/kg
NOTE - Estimated value
12 ECOLOGICAL
INFORMATION AQUATIC
TOXICOLOGY
Daphnia magna 48 Hour Static Acute Bioassay LC50= 340; No Effect Level= 180 mg/L Fathead Minnow 96 Hour Acute Toxicity (Estimated) LC50= 1140; No Effect Level= 740 mg/L
Rainbow Trout 96 Hour Static Acute Bioassay LC50= 180; No Effect Level= 100 mg/L
BIODEGRADATI
ON BOD-28
(mg/g): 1
BOD-5 (mg/g): 0 COD (mg/g): 79 TOC (mg/g): 4
13 DISPOSAL CONSIDERATIONS
If this undiluted product is discarded as a waste, the US RCRA hazardous waste identification number is :
Not applicable.
Please be advised; however, that state and local requirements for waste disposal may be more restrictive or otherwise different from federal regulations. Consult state and local regulations regarding the proper disposal of this material.
14 TRANSPORT INFORMATION
DOT HAZARD: ORS (when container > RQ)
UN / NA NUMBER: NA3082
DOT EMERGENCY RESPONSE GUIDE #: 31
15 REGULATORY INFORMATION TSCA:
All components of this product are listed in the TSCA inventory. CERCLA AND/OR SARA REPORTABLE QPaUgeA10NofT15ITY (RQ):
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FM...ules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt (6 of 7) [9/24/2008 15:33:18] file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FMFS/Template_c...09-23-08/Hercules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt
32 gallons due to SODIUM NITRITE;
SARA SECTION 312 HAZARDMICNIMLUAMSPSRE:VENTIVE MAINTENANCE FOR HVAC
Immediate(acute);Delayed(Chronic)
SARA SECTION 302 CHEMICALS:
No regulated constituent present at OSHA thresholds
SARA SECTION 313 CHEMICALS:
CAS# CHEMICAL NAME RANGE
7632-00-0 SODIUM NITRITE 21.0-30.0%
CALIFORNIA REGULATORY INFORMATION
CALIFORNIA SAFE DRINKING WATER AND TOXIC
ENFORCEMENT ACT (PROPOSITION 65) CHEMICALS PRESENT:
MICHIGAN REGULATORY INFORMATION
16 OTHER INFORMATION
NFPA/HMIS CODE TRANSLATION
Health 2 Moderate Hazard Fire 1 Slight Hazard
Reactivity 0 Minimal Hazard Special NONE No special Hazard
(1) Protective Equipment B Goggles,Gloves
(1) refer to section 8 of MSDS for additional protective equipment recommendations.
CHANGE
LOG
EFFECTIVE
DATE REVISIONS TO SECTION: SUPERCEDES
MSDS status: 13-FEB-1997 ** NEW **
23-JUN-1997 13-FEB-1997
16-NOV-2001 15 23-JUN-1997
file:///Q|/NAVFAC_JAXS_NAVRAC/PWBL/PW/PW2-FM...ules%20MSDS%20-%20CORRSHIELD%20NT402%20 .txt (7 of 7) [9/24/2008 15:33:18] gG GE Betz
Fact Sheet
CorrShield™ NT402 Closed System Cooling Water Treatment
• Buffered, film-forming inhibitor
• Effective on steel, copper and mixed metallurgy systems
• Compatible with glycol and alcohol antifreeze solutions
DESCRIPTION AND USE
CorrShield™ NT402 is an alkaline, buffered, nitrite- based corrosion inhibitor which is designed for use in the treatment of closed water systems. Corrosion control is achieved by establishing a passive inhibitor film on the metal surfaces. This film contains nitrite and organic corrosion inhibitors.
TREATMENT AND FEEDING REQUIREMENTS
Typically the closed cooling water should be main- tained at a high pH with this inhibitor. Proper treat- ment levels for CorrShield NT402 depend on several factors such as the corrosion potential and conditions particular to a given installation. The product should be used in accordance with control procedures that GE Betz establishes for a specific application.
GENERAL PROPERTIES
Physical properties of CorrShield NT402 are shown on the Material Safety Data Sheet, a copy of which is available upon request.
PACKAGING INFORMATION
CorrShield NT402 is a liquid blend available in a wide variety of customized containers and delivery meth- ods.
Contact your GE Betz representative for details.
STORAGE
Protect from freezing. If this product is frozen during shipment or storage, slight mixing may be required to ensure homogeneity.
SAFETY PRECAUTIONS
A Material Safety Data Sheet containing detailed information about this product is available upon request.
PRICING
F.O.B. Destination. Minimum freight allowed.
PFC 541 0211
Page w11w2wo.gf e1b1e5tz.com
©2002, GE Betz, Inc. All rights reserved.
MAINTENANCTASK SHEET # M-8
Pump
Frequency- Quarterly (13 weeks)
Step Descriptic:m
1 Check pumps and components for excessive noise, vibration, overheating, etc.
2 Perform vibration analysis on pump and motor (shall meet requirements of EXHIBIT II).
3 Based on vibration analysis results, lubricate, realign, etc, as required.
4 Provide a complete analysis evaluation of the vibration testing, and enter into the signature database.
MAINTENANCE TASK SHEET# Me12
RTU, Packaged and Unitary Units (OX type units) Task #1 .
Frequency- Quarterly (13 weeks)
1 Check equipment for proper operation.
2 Check for signs of refrigerant leakage or loss, as applicable.
3 Replace throw-away filters or clean permanent filters.
Task#t Frequency- Annual.(52 weeks)
1 Clean and flush coils, condensate pans and drain lines.
2 Clean condenser coils, heating coils/elements, dampers, screens, plenums, etc., as applicable.
3 Check electrical connections.
4 Check fans, compressors and motors for excessive noise, vibration, heat, etc.
5 Lubricate electrical motors, as required.
6 Functionally check controls.
7 Check belts, as applicable.
8 Check guards and covers.
9 Check piping and valves for leaks.
10 Check refrigerant charge.
11 Check for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.
12 Remove trash, dust and debris from equipment and equipment room, as applicable.
MAINTENANCE TASK SHEET# M 14
Fan, Blower or Vent
Frequency- Annual (52 weeks)
1 Functionally check operation of the unit.
2 Visually inspect the unit for corrosion or damage. Clean, paint and repair damaged or corroded surfaces and insulation.
Computer Room Units (Quarterly PM Inspections)
1. Check unit for proper operation.
2. Replace throw-away filters or clean permanent filters.
Computer Room Units (Semi-Annual PM Inspections)
3. Check fans, compressors and motors for excessive noise, vibration, heat, etc.
4. Check cooling coils, heating coil/elements and condensate pans and drain lines.
5. Check condenser unit (where applicable).
6. Clean and check humidifier (where applicable).
7. Check belts.
8. Check piping and valves for leaks.
Computer Room Units (Annual PM Inspections)
3. Check fans, compressors and motors for excessive noise, vibration, heat, etc.
4. Check cooling coils, heating coil/elements and condensate pans and drain lines.
5. Check condenser unit (where applicable).
6. Clean and check humidifier (where applicable).
7. Check belts.
8. Check piping and valves for leaks. Clean and flush coils, condensate pans and drain lines.
9. Clean condenser coils, heating coils/elements, dampers, screens, plenums, etc., as applicable.
10. Clean and functionally check humidifier (where applicable).
11. Check electrical connections.
12. Lubricate electrical motors, as required.
13. Functionally check controls.
14. Check guards and covers.
15. Check refrigerant charge (where applicable).
16. Check for rust and corrosion. Clean, paint and repair damaged or corroded surfaces and insulation.
17. Remove trash, dust and debris from equipment and equipment room, as applicable.
| Amend0004-J-1502000-06 Minimum PM HVAC and CRUs.pdf |
| J-1502000-06 Minimum PM for HVAC |
| Computer Room Units task |