This is Amendment 0002 to Solicitation N6883627R0001, issued by NAVSUP Fleet Logistics Center Jacksonville on November 20, 2026, for service craft operations and maintenance at Naval Destroyer Sea Trial Center (NDSTC).
The amendment extends the solicitation response due date from December 3, 2026 to December 7, 2026 and addresses questions received during the November 17, 2026 question period closing. Key changes include: (1) addition of Technical Subfactor 4 evaluating the Continuation of Essential Contractor Services Plan; (2) tailoring of DFARS clauses 252.237-7023 and 252.237-7024, designating all contract services as essential contractor services; (3) removal of Wage Determination 2010-0147 and attachment of revised Wage Determinations 2015-0213 Rev 42 and 2015-4559 Rev 34; and (4) revision of the Performance Work Statement reflecting question clarifications. Offerors must submit offers via email in three volumes: Volume I (Price, unlimited pages), Volume II (Technical Capability, 25-page limit addressing staffing, key personnel qualifications, transition plan, and essential services continuity), and Volume III (Past Performance, 10-page limit with up to three relevant references). The incumbent contractor is Metson Marine Services under Contract N68836-22-C-0006. Historical staffing includes 1 Program Manager, 1 Senior Maintenance Engineer, 1 Boat House Supervisor, 2 YDT Craftmasters, 2 YDT Duty Engineers, 2 YDT Apprentice Engineers, 2 YDT Able Seamen, 2 YDT Ordinary Seamen, 10 Coxswains, and 3 Outboard Mechanics. Evaluation will employ best-value trade-off methodology with Technical and Past Performance rated as approximately equal and significantly more important than Price; proposals must achieve "Acceptable" ratings on all four technical subfactors to remain in consideration. Offerors must hold prices firm for 120 calendar days from the offer receipt date.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this amendment it to:
1. Address additional questions received in response to solicitation N6883627R0001 and make any applicable changes. The Question period ended Tuesday, 17 November 2026, at 10:00 AM ET.
2. The solicitation due date has been extended to 07 December 2026.
3. The Questions and Answers document has been attached to the solicitation.
4. Section L and M changes have been highlighted.
5. Technical Subfactor 4: Continuation of Essential Contractor Services Plan has been added.
6. DFARS 252.237-7023 and 252.237-7024 have been tailored. All services under this contract are considered essential.
7. The PWS has been revised to reflect answers/clarifications from questions. Changes highlighted.
8. WD 2010-0147 has been removed from the solicitation.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 03 Dec 2026 07 Dec 2026
N6883627R00010002
Section I - Contract Clauses
Additional Information/Notes
The following clauses were added:
DFARS Clauses Incorporated by Full Text
252.237-7023 Continuation of Essential Contractor Services. (Tailored) (Oct 2010)
CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010)
(a . As used in this clause- ) Definitions
(1) "Essential contractor service" means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, including ships owned, leased, or operated in support of military missions or roles at sea; associated support activities, including installation, garrison, and base support services; and similar services provided to foreign military sales customers under the Security Assistance Program. Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.
(2) "Mission-essential functions" means those organizational activities that must be performed under all circumstances to achieve DoD component missions or responsibilities, as determined by the appropriate functional commander or civilian equivalent. Failure to perform or sustain these functions would significantly affect DoD's ability to provide vital services or exercise authority, direction, and control.
(b) The Government has identified all of the contractor services performed under this contract as essential contractor services in support of mission essential functions.
(c)(1) The Mission-Essential Contractor Services Plan submitted by the Contractor, is incorporated in this contract.
(2) The Contractor shall maintain and update its plan as necessary. The Contractor shall provide all plan updates to the Contracting Officer for approval.
(3) As directed by the Contracting Officer, the Contractor shall participate in training events, exercises, and drills associated with Government efforts to test the effectiveness of continuity of operations procedures and practices.
(d)(1) Notwithstanding any other clause of this contract, the contractor shall be responsible to perform those services identified as essential contractor services during crisis situations (as directed by the Contracting Officer), in accordance with its Mission-Essential Contractor Services Plan.
(2) In the event the Contractor anticipates not being able to perform any of the essential contractor services identified in accordance with paragraph (b) of this section during a crisis situation, the Contractor shall notify the Contracting Officer or other designated representative as expeditiously as possible and use its best efforts to cooperate with the Government in the Government's efforts to maintain the continuity of operations.
(e) The Government reserves the right in such crisis situations to use Federal employees, military personnel or contract support from other contractors, or to enter into new contracts for essential contractor services.
(f) . The Contractor shall segregate and separately identify all costs incurred in continuing performance of essential services in a crisis Changes situation. The Contractor shall notify the Contracting Officer of an increase or decrease in costs within ninety days after continued performance has been directed by the Contracting Officer, or within any additional period that the Contracting Officer approves in writing, but not later than the date of final payment under the contract. The Contractor's notice shall include the Contractor's proposal for an equitable adjustment and any data supporting the increase or decrease in the form prescribed by the Contracting Officer. The parties shall negotiate an equitable price adjustment to the contract price, delivery schedule, or both as soon as is practicable after receipt of the Contractor's proposal.
(g) The Contractor shall include the substance of this clause, including this paragraph (g), in subcontracts for the essential services.
(End of clause)
The following clauses were deleted:
DFARS Clauses Incorporated by Full Text
252.237-7023 Continuation of Essential Contractor Services. (Oct 2010)
CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010)
(a . As used in this clause- ) Definitions
(1) "Essential contractor service" means a service provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, including ships owned, leased, or operated in support of military missions or roles at sea; associated support activities, including installation, garrison, and base support services; and similar services provided to foreign military sales customers under the Security Assistance Program. Services are essential if the effectiveness of defense systems or operations has the potential to be seriously impaired by the interruption of these services, as determined by the appropriate functional commander or civilian equivalent.
(2) "Mission-essential functions" means those organizational activities that must be performed under all circumstances to achieve DoD component missions or responsibilities, as determined by the appropriate functional commander or civilian equivalent. Failure to perform or sustain these functions would significantly affect DoD's ability to provide vital services or exercise authority, direction, and control.
(b) The Government has identified all or a portion of the contractor services performed under this contract as essential contractor services in support of mission essential functions. These services are listed in attachment , Mission-Essential Contractor Services, dated .____ ____
(c)(1) The Mission-Essential Contractor Services Plan submitted by the Contractor, is incorporated in this contract.
(2) The Contractor shall maintain and update its plan as necessary. The Contractor shall provide all plan updates to the Contracting Officer for approval.
(3) As directed by the Contracting Officer, the Contractor shall participate in training events, exercises, and drills associated with Government efforts to test the effectiveness of continuity of operations procedures and practices.
(d)(1) Notwithstanding any other clause of this contract, the contractor shall be responsible to perform those services identified as essential contractor services during crisis situations (as directed by the Contracting Officer), in accordance with its Mission-Essential Contractor Services Plan.
(2) In the event the Contractor anticipates not being able to perform any of the essential contractor services identified in accordance with paragraph (b) of this section during a crisis situation, the Contractor shall notify the Contracting Officer or other designated representative as expeditiously as possible and use its best efforts to cooperate with the Government in the Government's efforts to maintain the continuity of operations.
(e) The Government reserves the right in such crisis situations to use Federal employees, military personnel or contract support from other contractors, or to enter into new contracts for essential contractor services.
(f) . The Contractor shall segregate and separately identify all costs incurred in continuing performance of essential services in a crisis Changes situation. The Contractor shall notify the Contracting Officer of an increase or decrease in costs within ninety days after continued performance has been directed by the Contracting Officer, or within any additional period that the Contracting Officer approves in writing, but not later than the date of final payment under the contract. The Contractor's notice shall include the Contractor's proposal for an equitable adjustment and any data supporting the increase or decrease in the form prescribed by the Contracting Officer. The parties shall negotiate an equitable price adjustment to the contract price, delivery schedule, or both as soon as is practicable after receipt of the Contractor's proposal.
(g) The Contractor shall include the substance of this clause, including this paragraph (g), in subcontracts for the essential services.
(End of clause)
Section J - List of Attachments
The following attachments were added:
Amendment 02 Questions & Answers Performance Work Statement
The following attachments were deleted:
Performance Work Statement (PWS) Wage Determination 2010-0147 Rev 26
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
ADDENDUM 52.212-1, Instructions to Offerors--Commercial Products and Commercial Services.
The following provisions are incorporated into 52.212-1 as an addendum to this solicitation:
The Government intends to post solicitation N6883627R0001 and all amendments to the Government Point of Entry via SAM.gov.
QUESTIONS
All questions and clarifications regarding this solicitation must be submitted via email to Mr. Joseph Rojas at Joseph.a.rojas14.civ@us.navy.mil and Mr. Harold Melton at Harold.m.melton.civ@us.navy.mil; subject line to read: Questions/Clarifications for N6883627R0001. Each question or comment should reference the applicable document, page number, and paragraph number. Offerors shall not include any proprietary information in a question, because the Government will provide the question and answer to all potential offerors. All questions must be submitted no later than 17 November 2026 at 1000 ET.
The Government reserves the right not to respond to any questions received concerning this solicitation after the questions receipt date above.
Accordingly, offerors are encouraged to carefully review all solicitation requirements and submit questions to the Government early in the proposal timeframe.
HISTORICAL DATA
Incumbent: Metson Marine Services, Contract number N68836-22-C-0006
Historical Resources: The below information illustrates the Historical Labor Mix utilized on past contracts and is provided as a tool to assist in establishing resources. It is the Contractor's sole responsibility to determine appropriate resources needed to accomplish work. See PWS section 5.16 for staffing required for this requirement.
Position Location FTE
Program Manager NDSTC 1
Senior Maintenance Engineer NDSTC 1
Boat House Supervisor NDSTC 1
YDT Craftmaster NDSTC 2
YDT Duty Engineer NDSTC 2
YDT Apprentice Engineer NDSTC 2
YDT Able Seaman NDSTC 2
1.
2.
3.
4.
5.
1.
2.
3.
1.
2.
3.
4.
YDT Ordinary Seaman NDSTC 2
Coxswain NDSTC 10
Outboard Mechanic NDSTC 3
Offerors must submit offers in PDF format by volume as described below. Each (a) Submission of offers.
volume shall contain a cover sheet (excluded from Volume page limitations) with #1 and #3 below. Although not required, Table of Contents if included, are excluded from Volume page and/or List of Acronyms, limitations.
All offers in response to the solicitation must be submitted via email to Mr. Joseph Rojas at Joseph.a.rojas14.civ@us.navy.mil and Mr. Harold Melton at Harold.m.melton.civ@us.navy.mil; subject line to read: Offer for N6883627R0001.
The offer shall contain the following information:
The solicitation number;
Name, address, and telephone number of the offeror;
The Offeror's Unique Entity Identifier (UEI) and, if applicable, Electronic Funds Transfer (EFT) indicator;
Information necessary to evaluate the factors contained in the provision at 52.212-2 or as described in the solicitation; and Responses to provisions that require the Offeror completion of information, representations, and certifications (other than those collected via the System for Award Management (SAM).
Offers shall be submitted in volumes as follows:
Volume I - Price There is no page limit for Volume I submission
Offeror must submit the following:
Standard Form (SF) 1449. Blocks 17a, 30a, 30b, and 30c of page one of SF 1449 shall be completed and signed to show the Offeror has read and agrees to comply with all terms, conditions, and instructions provided in the solicitation document.
SF 30 (Amendments), if applicable. Blocks 8, 15a, 15b, and 15c of page one of the SF30 must be completed and signed to show the Offeror has read and agrees to comply with all terms, conditions, and instructions provided in the solicitation Price Offer. The Offeror must fill in the price schedule and include unit prices. The unit price should be evenly incremented so that it adds up to the total price without rounding past the second digit right of the decimal point for total prices for all contract line items (CLINs). Pricing shall be structured in accordance with the contract line items identified in the SF 1449 bid schedule. Do not submit pricing for line items marked "NOT SEPARATELY PRICED" or "DO NOT SUBMIT PRICING ON THIS CLIN".
Volume II - Technical Capability Volume II is limited to 25 pages
Offerors must demonstrate an understanding of the solicitation requirements by providing the following:
Staffing Operations and Maintenance Plan IAW PWS Section 5 Key Personnel Qualifications IAW PWS Section 1.13 - submit resumes for Key Personnel; resumes are limited to 2 pages per resume and do not count towards the 20 page limit Transition Plan IAW PWS Section 1.16 Continuation of Essential Contractor Services Plan IAW DFARS 252.237-7024
Each technical capability element must provide sufficient evidence that the Offeror has a clear understanding of the solicitation and are able to meet the minimum requirements and qualifications set forth in the PWS.
Volume III - Past Performance Volume III is limited to 10 pages
The Offeror must provide a maximum of three relevant past performance evaluations of similar size, scope and complexity to services set forth in the PWS, with at least one year complete within the past three years from RFP issuance (See Block 8 of the SF1449). If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available which meets the requirements identified above, it shall be submitted with the offer. If a CPARS evaluation is not available, then the Offeror must submit a completed CPARS reports do not count towards the page limit.
Past Performance Questionnaire (PPQ) (Attachment 09) for each reference submitted. At the PPQ customer/client's request, PPQs may be submitted directly to the Government's POC, Contract Specialist, Joseph Rojas at Joseph.a.rojas14.civ@us.navy.mil and Contracting Officer, Harold Melton at Harold.m.melton.civ@us.navy.mil on the date and time offers are due. Offers shall not incorporate by reference PPQs previously submitted for other solicitations. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. The Offeror is responsible for providing the PPQ to its references for completion.
Offerors may submit a combination of delivery orders (DOs), task orders (TOs), technical direction letters (TDLs), and/or technical area tasks (TATs) placed under an Indefinite Delivery type contract or BPA as one of the examples of past performance, however, no more than five total combined as one submission will be reviewed. Each individual example in the combination must meet the requirements listed above.
If Offerors submit past performance examples where they served as a subcontractor, they must clearly identify their role as a subcontractor.
Additionally, the Offeror must demonstrate that the scope, complexity, and magnitude of its work as a subcontractor on the referenced past performance are substantially similar to the requirements outlined in the solicitation.
If no recent (currently ongoing with at least one year complete or completed within the past three years prior to solicitation release date), relevant past performance is available; the Offeror must affirmatively state that it possesses no recent or relevant past performance.
For Joint Ventures (JV), only a single set of up to three (3) references shall be submitted. For all JVs, the proposal shall clearly identify the parts of the PWS which each JV member will perform. If the offeror does not provide this information, the JV member reference will not be considered.
Note: An incomplete PPQ may not be evaluated.
Failure to submit all required documentation may render an offer non-responsive and the offer may not be considered for award.
(b) Period for acceptance of offers. Offeror agrees to hold their prices firm for a period of 120 calendar days from date specified for receipt of offers, unless another time period is specified in an amendment to the solicitation.
(c) Late submissions, modifications, revisions, and withdrawals of offers. Not modified.
(d) Contract award. Not modified.
(e) Debriefing. Not modified.
ATTACHMENTS: The following documents are provided as attachments and are considered part of this solicitation:
Attachment 01: Technical Exhibit 1 NDSTC Inventory of Government Furnished Craft Attachment 02: Technical Exhibit 2 NDSTC Inventory of Government Furnished Tools Attachment 03: Technical Exhibit 3 NDSTC Inventory of Yellow Gear (Pumps and Hydraulic Gear) Attachment 04: Technical Exhibit 4 NDSTC Oil Analysis Program Attachment 05: Technical Exhibit 5 Area Map Attachment 06: Technical Exhibit 6 Consumable List Attachment 07: Technical Exhibit 7 Destructive Weather Instructions Attachment 08: Performance Work Statement Attachment : 09 Wage Determination 2015-0213 Rev 42 Attachment : 10 Wage Determination 2015-4559 Rev 34 Attachment : Past Performance Questionnaire11
The following clauses were added:
DFARS Clauses Incorporated by Full Text
252.237-7024 Notice of Continuation of Essential Contractor Services. (Tailored) (Oct 2010)
NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010)
(a . "Essential contractor service" and "mission-essential functions" have the meanings given in the clause at 252.237-7023, ) Definitions Continuation of Essential Contractor Services, in this solicitation.
(b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services during periods of crisis. The offeror shall-
(1) Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;
(2) Address in the plan, at a minimum-
(i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;
(ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site;
(iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home;
(iv) Any established alert and notification procedures for mobilizing identified "essential contractor service" personnel; and
(v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.
(End of provision)
The following clauses were deleted:
DFARS Clauses Incorporated by Full Text
252.237-7024 Notice of Continuation of Essential Contractor Services. (Oct 2010)
NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES (OCT 2010)
(a . "Essential contractor service"and "mission-essential functions" have the meanings given in the clause at 252.237-7023, ) Definitions Continuation of Essential Contractor Services, in this solicitation.
(b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in attachment , Mission Essential Contractor Services, dated , during periods of crisis. The offeror shall-____ ____
(1) Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;
(2) Address in the plan, at a minimum-
(i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;
(ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site;
(iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home;
(iv) Any established alert and notification procedures for mobilizing identified "essential contractor service" personnel; and
(v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis.
(End of provision)
Section M - Evaluation Factors for Award
The following clauses were added:
FAR Clauses Incorporated by Full Text
52.212-2 Evaluation-Commercial Products and Commercial Services. (Deviation 2026-O0038) (Tailored)
(Feb 2026)
Evaluation-Commercial Products and Commercial Services (Feb 2026) (Deviation 2026-O0038)
Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose proposal conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The Government will make a single award using best value trade-off with Technical Capability assessed as either acceptable basis and no additional credit will be assessed for technical capability beyond the acceptable rating. Technical and Past Performance are approximately equal. When combined, Technical and Past Performance are significantly more important than Price IAW RFO FAR 15.104(d)(1). Tradeoff is between Past Performance and Price among all technically acceptable proposals.
(a) The following factors will be used to evaluate offers:
Factor 1: Technical The technical capability will be evaluated on an Acceptable/Unacceptable basis at both the subfactor and factor level.
Technical Evaluation Ratings
Rating Description
Acceptable Proposal clearly meets the minimum requirements of the solicitation and reflects a complete understanding of the PWS.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation nor reflect a complete understanding of the PWS.
The proposals shall be evaluated against the three subfactors below. The subfactors are considered equal in importance and will be evaluated as either Acceptable or Unacceptable. An unacceptable rating at the subfactor level will result in a proposal being deemed unacceptable at the overall factor level. Technically unacceptable proposals will be removed from further award consideration.
Subfactor 1: Staffing Operations and Maintenance Plan To be rated "Acceptable", the offeror's Staffing Operations and Maintenance Plan must demonstrate sufficient management, supervision and staffing to support the performance requirements identified in the PWS Section 5. An acceptable Staffing Operations and Maintenance Plan shall be submitted that:
Demonstrates, with narrative, adequate staffing with the necessary skill sets and sufficient management to ensure the requirements of PWS Section 5 are met.
The offeror must submit an organization chart which identifies all on-site management and supervisory positions, the number of personnel assigned and skill set being provided (see PWS Section 5).
Subfactor 2: Key Personnel Qualifications To be rated "Acceptable", the offeror must present resumes that will be evaluated; resumes must demonstrate that the key personnel listed in PWS Section 1.13 meet the corresponding qualifications identified in the PWS Section 1.12.9. Only one resume for each position is required. Proposal must include a signed commitment letter for the Program Manager position. No additional credit will be assessed for qualifications beyond the minimum required in the PWS.
Subfactor 3: Transition Plan To be rated "Acceptable", the offeror's Transition Plan must demonstrate sufficient management, supervision and staffing to meet the requirements identified in PWS Section 1.16.
Continuation of Essential Contractor Services PlanSubfactor 4:
To be rated "Acceptable", the offeror's Continuation of Essential Contractor Services Plan must address the requirements of DFARS 252.237-7024.
Factor 2: Past Performance Using the information submitted in Volume III, Past Performance Questionnaires submitted by the offerors' points of contact (POC) for the same or similar work with at least one year complete within the last three years from RFP issuance and other information independently obtained from Government or commercial sources. The Government will assign an overall confidence assessment for each offeror whose past performance is evaluated IAW the rating tables below. The purpose of the past performance evaluation is to allow the Government to assess the offeror's ability to perform the effort described in this RFP, based on the offeror's demonstrated present and past performance. Each Past Performance effort will be evaluated based on recency, relevancy, and quality.
The Government will begin its evaluation by first determining the recency and then the relevancy of each past performance effort. To be considered a recent effort, the effort must have been performed within the last three years from the solicitation release date and at least one year completed. The Government will perform an independent assessment of relevancy of the data provided or obtained. To be considered relevant, the Offeror's past performance information will be assessed on the similarity of the scope, magnitude, and complexity of the Offeror's prior or ongoing contracts to this solicitation's performance requirements. The relevancy of each contract reference will be considered in the overall confidence assessment rating for the offeror. The following ratings will be utilized in evaluating the relevancy of each past performance effort:
Past Performance Relevancy Rating Method
Adjectiv al Rating
Description
Very Relevant
(VR)
Present/past performance effort involved essentially the same this solicitation scope and magnitude of effort and complexities requires.
Relevant (R)
Present/past performance effort involved similar this solicitation requires.scope and magnitude of effort and complexities
Somewh at Relevant
(SR)
Present/past performance effort involved some of the this solicitation requires.scope and magnitude of effort and complexities
Not Relevant
(NR)
Present/past performance effort involved little or none of the this solicitation scope and magnitude of effort and complexities requires.
Scope Defined as providing service craft operations services to include maintenance and operation of multiple service craft and other watercraft, and manage port operations and waterfront administration.
Magnitu de
Experience managing maintenance and repair of multiple service craft and watercraft, port operations and waterfront administration with a dollar value greater than or equal to $3M per year.
Complex ity
Experience providing services in the functional areas of performance: Operations, preventive, predictive, and corrective maintenance of various watercrafts, boats and equipment, industrial marine repair services in support of assigned boats, waterfront equipment and operations.
The third aspect of past performance evaluation is to establish the overall quality of the offeror's past performance. The Past Performance Evaluation Team will review all past performance information collected and determine the quality of the offeror's performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment. A separate quality assessment rating is not required; rather the past performance rating, using the confidence assessment rating method below is based on the offeror's overall record of recency, relevancy, and quality of performance (Ref: DoD Source Selection Procedures). One of the following overall Past Performance Confidence Assessment ratings will be assigned to each offeror using the following definitions:
Past Performance Confidence Rating Method
Rating Description
Substantial Confidence
Based on the offeror's recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror's recent/relevant performance record, the Government has a Reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror's recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror's recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available, or the offeror's performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Past performance as the prime contractor will be considered more relevant in assigning the overall past performance confidence assessment than that as a subcontractor. Offerors with no recent/relevant performance record shall receive the rating "Neutral Confidence" meaning the rating is treated neither favorably nor unfavorably. Past performance ratings of "Substantial Confidence" or "Satisfactory Confidence" will be considered more favorably than a "Neutral Confidence" rating in conducting the trade-off.
For Joint Ventures (JV), the JV past performance will be given weight proportional to the scope and magnitude of the aspects of the work under the solicitation for which each JV member is proposed to perform. It is the offeror's responsibility to adequately explain the relevance of a reference provided for a JV member's past performance to the effort that the JV member is proposed to perform under the solicitation.
Factor 3: Price Price Evaluation. Price analysis will be conducted in accordance with RFO FAR 15.404-1. An offeror's proposed prices will be determined by multiplying the quantities identified in the Schedule by the proposed unit price for each contract line item number to confirm the extended amount for each. Offerors must ensure each CLIN is priced, except those line items marked "NOT SEPARATELY PRICED" or "DO NOT SUBMIT PRICING
ON THIS CLIN".
The Government will evaluate price to determine the following:
Completeness: All price information/data required in the RFP has been submitted. For all items in the schedule, the unit price will be multiplied by the quantity for each line item for the base and all option years.
Reasonableness: Price is fully justified and supported and is considered fair under current market conditions, reasonable to the Offeror and reasonable to the Government. Reasonableness may also be determined by comparison with the Government estimated and/or other offers received. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government. In accordance with RFO FAR 15.404-6(b) price analysis will be conducted on the individual CLIN to determine whether unbalanced pricing occurred.
(b) . The Government will evaluate offers for award purposes by adding the total price for all options, to include RFO FAR 52.217-8, to the Options total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced.
The evaluation of options does not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
The following clauses were deleted:
FAR Clauses Incorporated by Full Text
52.212-2 Evaluation-Commercial Products and Commercial Services. (Deviation 2026-O0038) (Tailored)
(Feb 2026)
Evaluation-Commercial Products and Commercial Services (Feb 2026) (Deviation 2026-O0038)
Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose proposal conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The Government will make a single award using best value trade-off with Technical Capability assessed as either acceptable basis and no additional credit will be assessed for technical capability beyond the acceptable rating. Technical and Past Performance are approximately equal. When combined, Technical and Past Performance are significantly more important than Price IAW RFO FAR 15.104(d)(1). Tradeoff is between Past Performance and Price among all technically acceptable proposals.
(a) The following factors will be used to evaluate offers:
Factor 1: Technical The technical capability will be evaluated on an Acceptable/Unacceptable basis at both the subfactor and factor level.
Technical Evaluation Ratings
Rating Description
Acceptable Proposal clearly meets the minimum requirements of the solicitation and reflects a complete understanding of the PWS.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation nor reflect a complete understanding of the PWS.
The proposals shall be evaluated against the three subfactors below. The subfactors are considered equal in importance and will be evaluated as either Acceptable or Unacceptable. An unacceptable rating at the subfactor level will result in a proposal being deemed unacceptable at the overall factor level. Technically unacceptable proposals will be removed from further award consideration.
Subfactor 1: Staffing Operations and Maintenance Plan To be rated "Acceptable", the offeror's Staffing Operations and Maintenance Plan must demonstrate sufficient management, supervision and staffing to support the performance requirements identified in the PWS Section 5. An acceptable Staffing Operations and Maintenance Plan shall be submitted that:
Demonstrates, with narrative, adequate staffing with the necessary skill sets and sufficient management to ensure the requirements of PWS Section 5 are met.
The offeror must submit an organization chart which identifies all on-site management and supervisory positions, the number of personnel assigned and skill set being provided (see PWS Section 5).
Subfactor 2: Key Personnel Qualifications To be rated "Acceptable", the offeror must present resumes that will be evaluated; resumes must demonstrate that the key personnel listed in PWS
Section 1.13 meet the corresponding qualifications identified in the PWS Section 1.12.9. Only one resume for each position is required. Proposal must include a signed commitment letter for the Program Manager position. No additional credit will be assessed for qualifications beyond the minimum required in the PWS.
Subfactor 3: Transition Plan To be rated "Acceptable", the offeror's Transition Plan must demonstrate sufficient management, supervision and staffing to meet the requirements identified in PWS Section 1.16.
Factor 2: Past Performance Using the information submitted in Volume III, Past Performance Questionnaires submitted by the offerors' points of contact (POC) for the same or similar work with at least one year complete within the last three years from RFP issuance and other information independently obtained from Government or commercial sources. The Government will assign an overall confidence assessment for each offeror whose past performance is evaluated IAW the rating tables below. The purpose of the past performance evaluation is to allow the Government to assess the offeror's ability to perform the effort described in this RFP, based on the offeror's demonstrated present and past performance. Each Past Performance effort will be evaluated based on recency, relevancy, and quality.
The Government will begin its evaluation by first determining the recency and then the relevancy of each past performance effort. To be considered a recent effort, the effort must have been performed within the last three years from the solicitation release date and at least one year completed. The Government will perform an independent assessment of relevancy of the data provided or obtained. To be considered relevant, the Offeror's past performance information will be assessed on the similarity of the scope, magnitude, and complexity of the Offeror's prior or ongoing contracts to this solicitation's performance requirements. The relevancy of each contract reference will be considered in the overall confidence assessment rating for the offeror. The following ratings will be utilized in evaluating the relevancy of each past performance effort:
Past Performance Relevancy Rating Method
Adjectiv al Rating
Description
Very Relevant
(VR)
Present/past performance effort involved essentially the same this solicitation scope and magnitude of effort and complexities requires.
Relevant (R)
Present/past performance effort involved similar this solicitation requires.scope and magnitude of effort and complexities
Somewh at Relevant
(SR)
Present/past performance effort involved some of the this solicitation requires.scope and magnitude of effort and complexities
Not Relevant
(NR)
Present/past performance effort involved little or none of the this solicitation scope and magnitude of effort and complexities requires.
Scope Defined as providing service craft operations services to include maintenance and operation of multiple service craft and other watercraft, and manage port operations and waterfront administration.
Magnitu de
Experience managing maintenance and repair of multiple service craft and watercraft, port operations and waterfront administration with a dollar value greater than or equal to $3M per year.
Complex ity
Experience providing services in the functional areas of performance: Operations, preventive, predictive, and corrective maintenance of various watercrafts, boats and equipment, industrial marine repair services in support of assigned boats, waterfront equipment and operations.
The third aspect of past performance evaluation is to establish the overall quality of the offeror's past performance. The Past Performance Evaluation Team will review all past performance information collected and determine the quality of the offeror's performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment. A separate quality assessment rating is not required; rather the past performance rating, using the confidence assessment rating method below is based on the offeror's overall record of recency, relevancy, and quality of performance (Ref: DoD Source Selection Procedures). One of the following overall Past Performance Confidence Assessment ratings will be assigned to each offeror using the following definitions:
Past Performance Confidence Rating Method
Rating Description
Substantial Confidence
Based on the offeror's recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror's recent/relevant performance record, the Government has a Reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror's recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror's recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available, or the offeror's performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Past performance as the prime contractor will be considered more relevant in assigning the overall past performance confidence assessment than that as a subcontractor. Offerors with no recent/relevant performance record shall receive the rating "Neutral Confidence" meaning the rating is treated neither favorably nor unfavorably. Past performance ratings of "Substantial Confidence" or "Satisfactory Confidence" will be considered more favorably than a "Neutral Confidence" rating in conducting the trade-off.
For Joint Ventures (JV), the JV past performance will be given weight proportional to the scope and magnitude of the aspects of the work under the solicitation for which each JV member is proposed to perform. It is the offeror's responsibility to adequately explain the relevance of a reference provided for a JV member's past performance to the effort that the JV member is proposed to perform under the solicitation.
Factor 3: Price Price Evaluation. Price analysis will be conducted in accordance with RFO FAR 15.404-1. An offeror's proposed prices will be determined by multiplying the quantities identified in the Schedule by the proposed unit price for each contract line item number to confirm the extended amount for each. Offerors must ensure each CLIN is priced, except those line items marked "NOT SEPARATELY PRICED" or "DO NOT SUBMIT PRICING
ON THIS CLIN".
The Government will evaluate price to determine the following:
Completeness: All price information/data required in the RFP has been submitted. For all items in the schedule, the unit price will be multiplied by the quantity for each line item for the base and all option years.
Reasonableness: Price is fully justified and supported and is considered fair under current market conditions, reasonable to the Offeror and reasonable to the Government. Reasonableness may also be determined by comparison with the Government estimated and/or other offers received. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government. In accordance with RFO FAR 15.404-6(b) price analysis will be conducted on the individual CLIN to determine whether unbalanced pricing occurred.
(b) . The Government will evaluate offers for award purposes by adding the total price for all options, to include RFO FAR 52.217-8, to the Options total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced.
The evaluation of options does not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
| IDCode: J |
| Page: 1 |
| Pages: 16 |
| AmendNo: 0002 |
| EffDate: 20 Nov 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N68836 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR JACKSONVILLE |
JACKSONVILLE FL 32212-0097
JACKSONVILLE, FL 32212-0097
UNITED STATES
JOSEPH ROJAS, Email: joseph.a.rojas14.civ@us.navy.mil Telephone: 9046065877 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6883627R0001 |
| SolDate: 03 Nov 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Harold Melton |
| ContDate: |
| CODate: 20 Nov 2026 |
File details come from the government source that posted it. Updated .