Government QA Responses.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
ASE Maintenance, Repair, Overhaul & Logistics (MROL) Support Services DRAFT RFP
Solicitation number
N68520-25-RFPREQ-QK00000-0063-DraftRFP
Issued by

About this file

The file contains Government Q&A Responses for a Draft Request for Proposal (RFP) for Naval Air Systems Command's Fleet Readiness Center Aviation Support Equipment (FRCASE) Maintenance, Repair, Overhaul & Logistics (MROL) Support Services. The solicitation is an 8(a) set-aside with potential flexibility for SDVOSB or WOSB set-asides under a FAR Part 19 Class Deviation, targeting Aviation Support Equipment (ASE) maintenance and logistics services across 13 work locations (12 CONUS and 2 OCONUS in Japan).

Key details include a single Key Personnel requirement, a proposed Period of Performance from 04 Jan 2027 to 03 Jan 2032, and a transition period anticipated to be at least 45 calendar days. The government will conduct a Post Award Conference to initiate the transition, and the Phase-In Transition Plan will be part of the first ordering period. Potential offerors must submit proposals using specific formatting guidelines, including Times New Roman font, and include a completed Attachment L-2 for the proposed Key Personnel. The final solicitation will provide updated details on technical document access, award date, and specific evaluation criteria.

View the file

Other files

File Type Posted
Attachment L-1 Vol 1 KA Tables.xlsx XLSX spreadsheet
Attachment L-3 CRM.docx DOCX document
Attachment Question Submittal Form.xlsx XLSX spreadsheet
Attachment 06 - MROL Data Item Transmittal Form.docx DOCX document
Attachment 13b CBA SOLM MOA.pdf PDF
Attachment 17 - CBA NOLA.pdf PDF
Att 20 2015-4281_MarylandCalvertCo_Rev33_25Apr2025.pdf PDF
Att 21 2015-4341_VirginiaWilliamsburgCo_Rev30_25Apr2025.pdf PDF
Att 24 2015-5231_TexasTarrantCo_Rev29_15May2025.pdf PDF
DRAFTRFP - N6852026R1001.pdf PDF
Solicitation Sections LandM.docx DOCX document
Attachment L-2 Key Personnel Qualification Matrix.docx DOCX document
Attachment L-4 FRCASE Cost.xlsx XLSX spreadsheet
Section J - List of Documents Exhibits and Other Attachments.xlsx XLSX spreadsheet
Exhibit A - CDRLS.docx DOCX document
Attachment 03 Workload Standards.xlsx XLSX spreadsheet
Attachment 12 - CBA El Centro.pdf PDF
Attachment 13 - CBA SOLM.pdf PDF
Att 22 2015-4539_FloridaDuvalCo_Rev27_23May2025.pdf PDF
Att 28 2015-5781_NorthCarolinaCravenCo_Rev26_29Apr2025.pdf PDF
Att 29 2015-5799_SouthCarolinaBeaufortCo_Rev29_30Apr2025.pdf PDF
Attachment 02 QASP.docx DOCX document
Attachment 07 - FRC ASE Capability.xlsx XLSX spreadsheet
Attachment 11 - CBA NTHI.pdf PDF
Attachment 19 - CBA BFT.pdf PDF
Att 25 2015-5535_WashingtonSnohomishCo_Rev25_20May2025.pdf PDF
Att 26 2015-5607_CaliforniaImperialCo_Rev26_30May2025.pdf PDF
Attachment 04 Team Complement Table.xlsx XLSX spreadsheet
Attachment 01 PWS.docx DOCX document
Attachment 05 - List of Key Personnel.docx DOCX document
Attachment 08 - MROL OCI.docx DOCX document
Attachment 09 - Minimum Tool Box Rqmnt.docx DOCX document
Attachment 14 - CBA LMR.pdf PDF
Attachment 15 CBA NNSY.pdf PDF
Attachment 16 - CBA CPNC.pdf PDF
Attachment 18 - CBA JAX.pdf PDF
Att 23 2015-5189_LouisianaOrleansCo_Rev30_15May2025.pdf PDF
Att 27 2015-5635_CaliforniaSanDiegoCo_Rev27_02June2025.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions

General Information
Requirement:FRCASE MROL
Notice/SAM.gov ID:N68520-25-RFPREQ-QK00000-0063-DraftRFP
#Document:

Draft RFP, PWS, Attachments, etc.

Reference ParagraphQuestionProprietary (Yes/No)Government Response
1Solicitation Sections L and MSection L – Instructions to BiddersThe Sources Sought identified the requirement as an 8(a) set-aside, but with the FAR Part 19 Class Deviation (RFO-2025-19) the Government now has greater flexibility in determining set-aside strategy. Agencies may now consider SDVOSB and WOSB set-asides under FAR 19.14 when the Rule of Two is satisfied. Has NAVAIR formally adopted this FAR 19 deviation? If so, will the acquisition team consider structuring ASE MROL as an SDVOSB or WOSB set-aside in alignment with this authority?
NoYes, the government does recognize the FAR Part 19 Class Deviation (RFO-2025-19), however; we have established this as an 8(a) set-aside with authority through the Small Busness Office.
2Solicitation Sections L and M1.2 Proposed Workshare Summary; Table KA-1, Proposed Workshare SummaryTable KA-1 asks for the entity CAGE Code/DUNS; however, DUNS numbers have been replaced with Unique Entity Identifiers (UEI). Does the Government want the DUNS or the UEI?NoThe Goverment will want the CAGE Code and UEI with the final proposal. Please see the final solicitation for this update.
3Attachment L-4 FRCASE Cost.xlsxInstruction tab
Touch Labor PB Hours CLIN X100 tabTouch Labor LOE Hours CLIN X200 tabSurge Labor Hours CLIN X900 tabLabor Hours Summary tabInstruction tab of Attachment L-4 FRCASE stated "All labor hours shall be carried out no further than the whole hour. No decimal places.", while those hours tabs has hours with decimals. Will the Government provide the entire update Att. L-4 with the hours rounded to the nearest whole number please?NoThe referenced Attachment L-4 will be corrected for a whole number in the appropriate places. Please see the final solicitation for this update.
4Attachment 04 Team Complement Table.xlsxInstruction tab of Attachment L-4 FRCASE stated "All labor hours shall be carried out no further than the whole hour. No decimal places". Will the Government provide the entire update Attachment 04 with the hours rounded to the nearest whole number please?NoThe referenced Attachment L-4 will be corrected for a whole number in the appropriate places. Please see the final solicitation for this update.
5Draft RFPSection FWill the government confirm the Period of Performance for this effort is 04 Jan 2027 To 03 Jan 2032?NoThe final Solicitation when released will reflect the correct Period of Performance.
6Attachment 01 PWS Attachment L-4 FRCASE Cost.xlsx3.1.10.1 Transition In (CLIN X100)Attachment 01 PWS, Section 3.1.10.1: "The mobilization period for the incoming transition of the successful contractor will be from date of contract award to the beginning of the period of performance (PoP) (anticipated minimum 45 calendar days)".
How will the successful Offeror be notified of award?NoThe successful Offeror will be notifed of contract award via email.
7Attachment 01 PWS Attachment L-4 FRCASE Cost.xlsx3.1.10.1 Transition In (CLIN X100)Will the Government have an official kick-off meeting to initiate the transition period?NoYes, please see the PWS, Section 3.1.3.2.1 for information on the Post Award Conference.
8Attachment 01 PWS Attachment L-4 FRCASE Cost.xlsx3.1.10.1 Transition In (CLIN X100)Will the Phase-In Transition be included in Ordering Period 1? If not, will the government update Attachment L-4 to add Phase-In Transition please?NoYes, the Phase-In Transition Plan will be part of the first ordering period under CLIN 0100.
9Solicitation Sections L and M4.3.2Section L, Paragraph 4.3.2 states under Instructions for Offerors "Offerors shall utilize a composite CBA Rate (e.g., 7 months for 05/1/25 and 5 months for 05/1/26 and so forth) for the CBA Specified Rates." The reference to the 5 months or 7 months are listed in most rows regardless of the CBA's POP. Can the Government please clarify that this is only an example?NoYes, the information is provided as an example only.
10Section L - Instructions, Conditions and Notices to BiddersL.2.1 Proposal FormatThe Government states the proposal should be formatted using Times New Roman 12-point normal font. The solicitation then states the Offeror may use 10-point font for Table and Graphics. Does the Government want the Table and Graphics font in Times New Roman or can another font type such as Arial Narrow be used?NoPlease see the final solicitaion.
11Section L - Instructions, Conditions and Notices to BiddersL.4.1 4.1 ELECTRONIC PROPOSAL SUBMISSION (Unclassified Data Only)CC18:F18Can the Government expand on the procedures to be taken if an Offeror's local connectivity is down? Is there another option for submitting the proposal? If so, what is that option? How does the Government want the Offeror to communicate that the proposal has been submitted?NoPlease see section L, 4.1 for proposal submittal instructions.
12Solicitation Sections L and ML.2. Volume 2 - Prerequisite - Key Personnel M.3. Prerequisite - Key PersonnelGiven the importance of Key Personnel to successful, low risk operations during performance would the Government consider changing the Key Personnel Requirement from Pass/Fail to an Adjectively rated section? This would allow the Government the ability to score each Offerors Key Personnel in a more granular fashion and award merit to the best suited candidate based on their experience managing similar work.NoPlease refer to the Final soliciatation for evaluation criteria.
13Attachment_01_PWS.docx3.1.1 SE Re-workThe fourth sentence in this section refers to "…paragraph 3.1.2.1, Work Location". We believe this should read "...Section 3.1.3.1, Work Location". Respectfully request clarification from the Government.NoYes, the PWS section should be 3.1.3.1. Please refer to the final soliciatation for update for this change.
14Attachment_01_PWS.docx3.1.3.1 Work LocationThe PWS lists 13 work locations/sites in scope for this effort. There are 12 CONUS sites, which are all listed in Attachment_04_Team_Complement_Table.xlsx. The 13th location listed is actually two potential OCONUS sites in Sasebo and Yokosuka, Japan which are not listed as sites with personnel in Attachment_04_Team_Complement_Table.xlsx. Are offerors to assume that these sites are unmanned and therefore are listed as example TDY locations as required and as mentioned in sections 3.1.1 and 3.1.7.2?NoYes, there are no manning requirements for the OCONUS sites, only material support. Please see the final solicitaion.
15Section L&M4.3Govt. guidance directs industry to request access to tech documents in the PWS to contracting.NoThe final Solicitation when released will reflect the correct method to request access to the Technical Library.
16Section L&MWhat is the anticipated award date?NoSee the final Solicitation for the anticipated award date.
17SF33CTXT.237-9501; Page 7 of 22Can the government confirm there is only a requirement for one key personnelNoYes, at this time there is one Key Personnel. Please refer to the final solicitation.
18SF33CTXT.237-9501; Page 7 of 22Can the government confirm there is only a requirement for one resume to be submitted with the proposal submission?NoThe Section L requirements for Key Personnel mandate that an Offeror submit a completed Attachment L-2 for the proposed Key personnel.
19Section L&M4.2Performed search in PIEE for N6852025R1001; no results. Is this solicitation # in PIEE?NoThe final solicitation will be in PIEE.
20Section L&MVOLUME 1 - MODEL CONTRACT 1.6Model contract - Can we provide our SAM document in lieu of the fill-ins or can we reference SAM? Also identify NAVAIR fill ins?NoThe requirement for the Model Contract documents is listed in Section L Paragraph 1.6. All of the required fill-ins are listed in the contract.
21PWS3.1.1Update work locations from para. 3.1.2.1 to para 3.1.3.1NoThe current citation in PWS Paragraph 3.1.1 has been updated. See the Final solicitation for updated files.
22Section L&M / VOLUME 4-COST/PRICEAttachment+L-4+FRCASE+COSTCan the government clarify that it is directing industry to add additional/multiple rows based on each labor categories & each sites after row 9 because the fringe would be different by site. For example, there is an administrative assitant listed at 6 different sites; also 9 GSE workers at different sites.NoYes, if additional rows are needed then offerors should create new rows to accommodate their rate structure, see the worksheet instructions in Attachment L-4.