Attachment 02 QASP.docx
DOCX document 61 KB Posted
- Solicitation number
- N68520-25-RFPREQ-QK00000-0063-DraftRFP
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for Fleet Readiness Center Aviation Support Equipment (FRCASE) Maintenance, Repair, Overhaul & Logistic Support (MROL) services. The QASP outlines the government's method for monitoring and evaluating contractor performance across multiple performance metrics, including maintenance production standards, inventory management, kit assembly, logistics response time, and transaction reporting.
Key performance standards include maintaining a 95% first pass fill rate from inventory, achieving 98% inventory accuracy, ensuring timely kit shipments, completing scheduled maintenance within established work standards, and documenting NAVSUP transactions within 24 hours. The government will conduct monthly performance evaluations using a scoring system that rates contractor performance as below standard (-1), standard (0), or above standard (+1) across 16 different evaluation criteria. These assessments will be recorded in the Contractor Performance Assessment Reporting System (CPARS) and may impact future contract opportunities.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
Quality Assurance Surveillance Plan (QASP) Fleet Readiness Center Aviation Support Equipment (FRCASE) Maintenance, Repair, Overhaul & Logistic Support (MROL)
1. Purpose This Quality Assurance Surveillance Plan (QASP) is a government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the services contract in accordance with the Performance Work Statement (PWS) / Statement of Work (SOW). This contract requirement is for Maintenance, Repair, Overhaul, and Logistics Support of Fleet Readiness Aviation Support Equipment (FRCASE) in Solomons, MD and the other FRCASE locations. The intent is to ensure that the Contractor performs in accordance with the metrics identified herein and the Government receives the quality of services called for in the contract.
2. Authority Authority for the issuance of this QASP is provided under clause 52.246-5 Inspection of Services Cost-Reimbursement, which provides for inspections and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer or a duly authorized representative in accordance with FAR subpart 46.4.
3. Scope To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and QASP. The Contractor, not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth in the contract.
The QASP, on the other hand, is put in place to provide Government surveillance oversight of the Contractor’s efforts to ensure that they are timely, effective, and are delivering the results specified in the contract.
4. Government Resources The following definitions for Government resources are applicable to this QASP:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting service contract. The limitations of authority are contained in a written letter of appointment.
Alternate COR (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
5. Responsibilities The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer who assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance
Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. In addition to the continuous monitoring of performance, the COR will also submit an annual assessment in the Navy’s Contractor Performance Assessment Reporting System (CPARS). For CPARS, the COR assesses general quality of the product or service, schedule, cost control, business relations, management, small business compliance, and other important areas. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
Alternate COR (ACOR) – In the absence of the COR, the ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
6. Methods of QA Surveillance Contractor Performance Assessment Report System (CPARS) – The marketplace for maintenance, repair and overhaul support services is very competitive. As such, the successful Offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. This evaluation will be one determinant in performance of each sequential period. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, and future orders, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
QASP - The below listed methods of surveillance shall be used by the COR and ACOR(s) in the technical administration of this QASP.
7. Surveillance Enclosure 1, incorporated by reference into this QASP, sets forth the performance standards, definitions, and surveillance methods for the Contractor and COR/ACORs. Updates to Enclosure 1 that affect performance standards shall require a contract modification to ensure enforceability. Failure to meet performance standards will be addressed following paragraphs (d) and (e) of 52.246-5"
Each permanent site will submit a Contractor Monthly Performance Evaluation to the FRCASE COR, unless otherwise delineated in the SOW.
Circumstances or external influences beyond the control of the Contractor that impact the ability of the Contractor to meet performance standards will not affect Contractor performance measures (FAR 52-249-14) The Performance Standard Definitions section of this QASP describes the metrics used to measure Contractor schedule and performance. Performance data will be provided by each FRCASE ACOR / Government Site Lead o the COR, who will then calculate one score per metric. Once measured, these metrics will be used to arrive at a monthly composite score for the Contractor based on whether Contractor performed the work in an above standard, standard or below standard manner in accordance with the stated goals. All performance evaluations will be entered into the CPARS database by the COR.
Contractor work accomplished at FRCASE sites will be scored based upon the types of workload being conducted at each of the FRCASE Sites. Each of the types of workload and their associated performance and/or schedule criteria are outlined in the Performance Standard Definitions of this QASP.
The Government Site Lead will evaluate compliance with the Contractor’s QAPP through inspections and reviews on an unscheduled basis and conducted without any delays to the schedule and provide to the COR/ACOR.
8. Documentation In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract (FAR 4.7). The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
Enclosure 1
PERFORMANCE STANDARDS AND DEFINITIONS
| PWS Ref |
| Requirement |
(Desired Outcome)
| Acceptable Quality Level (AQL) |
| Monitoring Method |
| Frequency |
3.1.2.2.1 – 3.3.3.5.22
| All CDRL deliverables in response to the PWS /SOW shall be accurate and timely |
| Timeliness: delivered on or ahead of schedule at least 95% of the time. |
Quality: delivered without errors > 95% of the time
| Government Review and Approval as described in the CDRL. |
| As Required by the CDRL |
3.5.1
| Quality Control activities, inspections, and corrective actions completed as required by the Plan. |
| 100% Compliance with the Contractor’s Quality Control Plan. |
| Government Quality Assurance Representative |
| Quarterly Inspections |
| Combatting Trafficking In Persons (CTIP) |
| 100% Compliance with 52.222-50 Combating Trafficking in Persons |
| COR |
| Annual check IAW paragraph (h)(5) of the clause |
3.1.2.2.6
| Staffing |
| 100% Compliance with Contractor’s requirement to backfill positions within 45 days |
| Government Review of Labor Hours clin CDRL |
| As described in the CDRL |
3.3.1.1 Maintenance, Repair, and Overhaul (MRO) Production meets Workload Standards
(High Volume: > 10 CNUMs per year) Meet Workload Standard ≥ 95% of the time for each end item NIIN (e.g. P-25 Fire Trucks, Spotting Dollies, Towbars) This metric will be applied discretely for each individual end item NIIN.
| Government Review of Production Status Reports based on Support Equipment Management System (SEMS) |
| Monthly |
3.3.1.1 Maintenance, Repair, and Overhaul (MRO) Production meets Workload Standards (Low Volume: ≤ 10 CNUMs per year) Meet Workload Standard ≥ 75% of the time for each end item NIIN (e.g. Crash Cranes) This metric will be applied discretely for each individual end item NIIN.
| Government Review of Production Status Reports based on Support Equipment Management System (SEMS) data |
| Monthly |
3.3.3.5.28
| First Pass Fill Rate from Inventory adequately meets production demands |
| Contractor achieves a First Pass Fill Rate from Inventory of at least 95% for each month. |
| Government Supply Lead Review of data in Business Office Enterprise (BOE) |
| Monthly |
3.3.3.5.23
| Inventory Accuracy meets government property management requirements. |
| Contractor maintains an Inventory Accuracy rate equal to 98% for each reporting category (e.g. OM&S, NWCF-SM) |
| Government Review of data in Property Management Automated Report Tool (PMART) |
| Annual Report with monthly updates |
3.3.3.5.23
| Inventory of consumable material adequately meets production demands |
| Contractor shall not incur monthly inventory losses greater than 2% of the total inventory quantity of warehouse items. |
| Government Review of data in Property Management Automated Report Tool (PMART) |
| Monthly |
3.3.3.5.21
| Inventory of unused material is minimized. |
| Contractor shall maintain an Inventory Turn Rate of two years or less. |
| Government Supply Lead Review of data in Business Office Enterprise (BOE) |
| Monthly |
| Artisans have the parts and kits necessary to complete repairs in a timely and efficient manner. |
| Contractor-assembled kits are shipped in 100% complete condition |
Contractor maintains a Monthly Kit Effectiveness score of at least 95%. Monthly Kit Effectiveness score
| Government Supply Lead Review of data in Business Office Enterprise (BOE) |
| Monthly |
| Artisans have the parts and kits necessary to complete repairs in a timely and efficient manner. |
| Contractor shall maintain a Monthly Kit Average Days to Ship score of 2 business days on a monthly basis. |
Monthly Kit Average Days to Ship
| Government Supply Lead Review of data in Business Office Enterprise (BOE) |
| Monthly |
3.3.1.2
| 7R workload must be tracked to meet NAVSUP WSS accountability requirements. |
| Contractor shall ensure that all NAVSUP WSS transactions are documented via Transaction Item Reporting (TIR) within 1 business day of the transaction occurrence at least 97% of the time. |
| Government Review of data in Commercial Asset Visibility - Organic Repairable Module (CAV-ORM) |
| Monthly |
| 7R message traffic; AAI requisitions must be tracked |
| All data on 7R requisitions received acceptable. |
| Navy message traffic |
| Monthly |
| 3.4.3.10 |
| IMRL tracking of new AAIs |
| Receive all new SE allowances for new AAIs acceptable |
| SEMS/LAMS Report |
| Monthly |
| ID # |
| Criterion |
| Below Standard (-1) |
| Standard (0) |
| Above Standard (+1) |
| 1 |
| Task Performance |
| Issuance of one or more PQDR(s) within the month. |
| No issuance of a PQDR within the month. |
| N/A. Either meets or is Below Standard and is NRFI. |
| 2 |
| Staffing |
| Contractor provides marginally qualified or unqualified personnel. Lapses in coverage occur regularly. |
| Contractor provides qualified personnel. Lapses in coverage may occasionally occur and are managed per individual contract policy. |
| Contractor provides highly qualified personnel. Contractor reassigns personnel to ensure proper coverage. Contractor ensures staff training remains current. |
| 3 |
| Schedule |
| Contractor frequently misses deadlines or schedules and is slow / non-responsive to government requirements. |
| Contractor routinely meets deadlines or schedules and provides a timely response to government requirements. |
| Contractor always meets deadlines, schedules, and responds immediately to government requests. |
| 4 |
| Contract Deliverables (CDRLs) |
| Contract CDRLs are provided late or not at all. Contract CDRLs do not meet DID requirements. Quality of contract CDRLs are not acceptable. |
| All contract CDRLs are delivered on time. Contract CDRLs routinely meet DID requirements. Quality of contract CDRLs routinely are at acceptable levels. |
| All contract CDRLs are provided immediately. Contract CDRLs always meets DID requirements. Quality of contract CDRLs frequently exceed acceptable levels. |
| 5 |
| Corrective Action Requests (CARs) |
| Contractor receives two or more CARs within the month. *Issuance of a Level II CAR is an automatic -1 score. |
| Contractor receives no more than one Level I CAR per month. |
| Contractor has not received any CARs within the month. |
| 6 |
| Workload Standard (WLS) |
| Contractor completes the SE in number of hours above the established WLS. |
| Contractor completes the SE in a number of hours within the established WLS. |
| Contractor completes the SE in a number of hours lower than the established WLS. |
| 7 |
| SE Scheduled Maintenance Execution |
| Contractor completes less than or equal to 79% of the required scheduled maintenance during the month. |
| Contractor completes 80 – 89% of the required scheduled maintenance during the month. |
| Contractor completes 90 – 100% of the required scheduled maintenance during the month. |
| 8 |
| Contractor shall maintain a First Pass Fill Rate from Inventory of 95% on a monthly basis. (PWS/SOW Reference 3.50 Material Issues) |
| Contractor achieves a First Pass Fill Rate from Inventory less than 95% for the month. |
| Contractor achieves a First Pass Fill Rate from Inventory of 95% for the month. |
| Contractor achieves a First Pass Fill Rate from Inventory greater than 95% for the month. |
| 9 |
| Contractor shall maintain an Inventory Accuracy rate of 98% or higher at all times for OM&S. |
(PWS/SOW Reference 3.45 Inventory Accuracy)
| Contractor maintains an Inventory Accuracy rate of less than 98% for OM&S. |
| Contractor maintains an Inventory Accuracy rate equal to 98% for OM&S. |
| Contractor maintains an Inventory Accuracy rate greater than 98% for OM&S. |
| 10 |
| Contractor shall maintain an Inventory Accuracy rate of 98% or higher at all times for NWCF-SM. (PWS/SOW Reference 3.45 Inventory Accuracy) |
| Contractor maintains an Inventory Accuracy rate of less than 98% for NWCF-SM. |
| Contractor maintains an Inventory Accuracy rate equal to 98% for NWCF-SM. |
| Contractor maintains an Inventory Accuracy rate greater than 98% for NWCF-SM. |
| 11 |
| Contractor shall not incur monthly inventory losses greater than 2% of the total inventory quantity. |
(PWS/SOW Reference 3.47 Inventory Losses and Gains)
| Contractor incurs monthly inventory losses greater than 2% of the total inventory quantity. |
| Contractor incurs monthly inventory losses equal to 2% of the total inventory quantity. |
| Contractor incurs monthly inventory losses less than 2% of the total inventory quantity. |
| 12 |
| Contractor shall maintain an Inventory Turn Rate of two years or less. |
(PWS/SOW Reference 3.43 Inventory Turn Rate)
| More than 5% of stocked items have inventory turn rates greater than two years. |
| 5% of stocked items have inventory turn rates greater than two years. |
| Less than 5% of stocked items have inventory turn rates greater than two years. |
| 13 |
| Contractor shall ensure that kits assembled are shipped in 100% complete condition and maintaining a Monthly Kit Effectiveness score of 95%. |
(PWS/SOW Reference 3.54 Kit Missing Item)
| Contractor achieves a Monthly Kit Effectiveness score less than 95%. |
| Contractor achieves a Monthly Kit Effectiveness score of 95%. |
| Contractor achieves a Monthly Kit Effectiveness score greater than 95%. |
| 14 |
| Contractor shall maintain a Monthly Kit Average Days to Ship score of 2 business days on a monthly basis. |
(PWS/SOW Reference 3.50 Material Issues)
| Contractor achieves a Monthly Kit Average Days to Ship score greater than 2 business days. |
| Contractor achieves a Monthly Kit Average Days to Ship score of 2 business days. |
| Contractor achieves a Monthly Kit Average Days to Ship score of less than 2 business days. |
| 15 |
| Contractor shall maintain a Monthly Average Logistics Response Time (ALRT II) of two business days between the receipt of a material request and the placing of the order in Navy ERP. |
Contractor achieves a Monthly ALRT II score averaging greater than three business days for items to be acquired via DD-1348/N-ERP.
| Contractor achieves a Monthly ALRT II score averaging three business days for items to be acquired via DD-1348/N-ERP. |
| Contractor achieves a Monthly ALRT II score averaging two business days or less for items to be acquired via DD-1348/N-ERP. |
| 16 |
| Contractor shall ensure that all |
NAVSUP WSS transactions are documented via Transaction Item Reporting (TIR) within 24 hours of the transaction occurrence 97% of the time or greater.
Contractor documents NAVSUP WSS transactions via Transaction Item Reporting (TIR) within 24 hours of the transaction occurrence less than 97% of the time.
Contractor documents NAVSUP WSS transactions via Transaction Item Reporting (TIR) within 24 hours of the transaction occurrence 97% of the time.
Contractor documents NAVSUP WSS transactions via Transaction Item Reporting (TIR) within 24 hours of the transaction occurrence greater than 97% of the time.
PERFORMANCE STANDARD DEFINTIONS
1 – Task Performance Self Explanatory
2 – Staffing Self Explanatory
3 – Schedule Self Explanatory
4 – Contract Deliverables (CDRLs) Self Explanatory
5 – Corrective Action Requests (CARs) Self Explanatory
6 – Workload Standard (WLS) Self Explanatory 7 –SE Scheduled Maintenance Execution
Performance measurement will be based on Workload Standard (WLS), Support Equipment Available for Tasking, Scheduled Maintenance Execution, and Direct Labor Yield.
Performance measurement will be assessed on all SE Rework workload based upon the WLS associated with each CNUM/Maximo Work Order, and NIIN, by Site. All items identified as completed and ready for return to the Fleet in a “Ready for Use/Issue” condition, at the close of business the last working day of the month will be used for the calculation of this measurement. The actual number of hours expended will be compared to the planned WLS hours.
The Government Site Leads and the COR/ACOR will score each item of SE completed during the month using a SE Rework Site Performance Worksheet. Upon the completion of each item, the Government will enter the following information into the worksheet: Date Completed, CNUM / Maximo Work Order, Planned Workload Standard and Actual Hours Expended. The Performance measurement will be scored as follows:
To receive a score of “+1”, or exceeds standard, the Contractor must complete the SE being scored in a number of hours 15% lower than the established WLS.
To receive a score of “0”, or meets standard, the Contractor must complete the SE being scored within the established WLS.
To receive a score of “-1” or unacceptable, the Contractor must complete the SE being scored in a number of hours 15% above the established WLS.
Each site’s individual CNUM/Maximo Work Order Scores are then grouped by NIIN and added to determine each NIIN Score. Each of the individual NIIN scores are then added together to identify a Site NIIN Total. The Site NIIN Total is then scored as follows: if the sum is zero, the score is “0”; if the sum is a positive number, the score is “+1”; if the sum is a negative number, the score is “-1”. The result of the scoring becomes the Site’s Monthly Score.
This Metric will be weighted according to type of workload by the COR on the Contractor's Monthly Performance Measurement Report.
All FRCASE workload to include NAVAIR Support Equipment Rework Control Numbers (CNUM) NAVSUP Quick Engine Change and Component Repair program Transaction Item Reporting (TIR) numbers and other workload will be included in the monthly performance evaluation. Once measured, these metrics will be used to arrive at a monthly score for the Contractor based on whether they did not meet, met, or exceeded the stated goals. Only items identified as completed and ready for return to the Fleet in a “Ready for Use/Issue” condition, at the close of business the last working day of the month will be used for the calculation of this measurement.
8 - SE Available for Tasking - Sail Plan (Applies only to BIC)
For each site that is conducting workload associated with the Sail Plan, the Government will monitor the associated workload utilizing the SE Available for Tasking Worksheet. The SE Available for Tasking Worksheet identifies the quantity of each type of equipment planned for upload to each ship and the quantity of each type of equipment available for redeployment/upload at the end of the maintenance evolution. A score for this work is assigned based upon the percentage of total amount of equipment available for redeployment/upload. This metric is only reported in the month that the SE reload is completed. The Government Off-Site Leads and the COR will determine the scores as follows:
To receive a score of “+1”, or exceeds standard, the Contractor shall have completed the required scheduled maintenance and have 98-100% of the SE ready for reload/upload according to the Sail Plan.
To receive a score of “0”, or meets standard, the Contractor shall have completed the required scheduled maintenance and have 95 – 97% of the support equipment ready for reload/upload according to the Sail Plan.
To receive a score of “-1”, or unacceptable, the Contractor shall have completed the required scheduled maintenance and have less than 95% of the support equipment ready for reload/upload according to the Sail Plan.
Note: Reporting on the availability of SE to meet ship schedules will only be reported at the end of the month in which all work associated to a specific Sail Plan has been completed.
This Metric will be weighted according to the type of workload by the COR on the Contractor’s Monthly Performance Measurement Report.
9 - First Pass Fill Rate Measured by taking the total number of inventory requisitions issued upon first pass from inventory stock divided by the total number of inventory requisitions for materials issued during the month.
10 through 11 - Inventory Accuracy Rate Measured by taking the total number of accurate items inventoried divided by the total number of items inventoried.
12 - No Losses in Excess of 2% Measured by taking the total number of items inventoried with losses divided by the total number of items inventoried.
13 - Reorder Points (ROPs) and Economic Order Quantities (EOQs) Self-Explanatory
14 - Inventory Turn Rate Measured by the number of times an item is issued from the warehouse.
15 - Monthly Kit Effectiveness Measured by taking the number of kits shipped during the month with 100% of the required contents divided by the total number of kits shipped during the month.
16 - Monthly Average Logistics Response Time II (ALRT II) Measured by taking the total number of requisitions ordered during the month via the N-ERP DD-1348 process divided by the total number of days to place all requisitions during the month on order via the N-ERP DD-1348 process. This metric is measured from the time the Purchase Requisition is created and in Approved status (APPR) until the time that it is recorded as ordered in Maximo.
17 - Transaction Item Reporting (TIR) for NAVSUP WSS Measured by taking the total number of NAVSUP WSS transactions changing status and reported via TIR within 24 hours of changing status divided by the total number status changes reported during the period. Data Source for this information is the Certificate of Completion and Acceptance (COCA) form.
All PWS/SOW/CDRL efforts will be assessed focusing on the following:
Quality of Product or Service – Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program efforts, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule – Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address the significance of scheduled events, discuss causes, and assess the effectiveness of Contractor corrective actions.
Cost Control – Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the Contractor experiencing cost growth or underrun? If so, discuss the causes and Contractor-proposed solutions for the cost overruns. For contract where task or contract sizing is based upon Contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals as required by the SBA 8(a) requirement. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activities needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Utilization of Small Business – Assess the Contractor’s success in utilizing and meeting small business goals / concerns.
Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.