ATTACHMENT L-3 - PRICE COST SUMMARY.xlsx
XLSX spreadsheet 1 MB Posted
- Solicitation number
- N6852022R0042
About this file
This document package includes a price cost summary template and related federal contract opportunity notice for fleet readiness center support services. The price cost summary template provides instructions for offerors to submit fixed-price proposals for aviation support equipment maintenance and repair labor categories over a five year ordering period. Labor categories include a program manager, mechanics, workers, coordinators and technicians. The contract will be awarded on a 100% small business 8(a) set-aside basis. Offerors must submit all proposal volumes electronically by the deadline of October 28, 2022 specified in the solicitation. The federal contract opportunity is solicitation number N6852022R0042 seeking proposals for Fleet Readiness Center Southeast support equipment maintenance and repair services awarded on a firm-fixed price basis by the Command Fleet Readiness Centers procurement group.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions | |
| Contractor: | |
| 1 | Any cell colored "blue" contains a formula and should not be edited. |
| 2 | All dollar figures shall be carried out no further than two decimal places. |
| 3 | All dollar figures shall be carried out no further than two decimal places. |
| 4 | In Column A, for the prime contractor P6 submittal, the Government Labor Categories are listed by location (Green lines). For each subcontractor (yellow lines), enter the Government Labor category by location. If subcontractor P6 submittal, please change cell A25 to subcontractor name |
| 5 | In Cell B7 enter the period of performance on each worksheet. |
| 6 | In Column D, for the prime (or subcontractor's direct P6 submittal) own workforce, the field is colored "green" indicating no input needed. (This reflects that the prime contractor is proposing its own employees, contingency hires-, or prospective hires - it does not include any subcontractors.) The subcontractors fields are in yellow and are prenumbered. Please note if more subcontractors are needed, the contractor may add additional Sections and rows to accommodate them, but ensure integrity of the formulas. |
| 7 | In column F, identify for each individual proposed whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 8 | In column I (prime P6 or subcontractor direct P6 submittal to formulate cost build-up): |
| 9 | (a) enter the unburdened labor rate for each individual |
| 10 | (b)Insert the full-time fringe rate, if it is not included in its overhead rate. |
| 11 | (c) Insert the part-time fringe rate, if it is not included in its overhead rate. |
| 12 | (d) Insert the overhead rate for work performed at the Government's facility. |
| 13 | (e) Insert the G&A rate being applied. |
| 14 | (f) Beginning with Cell G26, the prime shall enter the fully burdened labor rates for all individuals proposed by subcontractors. The fully burdened labor rate includes fixed fee, per labor CLIN/Appropriation. |
| 15 | (g) Insert the prime's subcontractor handling charge, if any. |
| 16 | (h) Insert the prime's fixed fee rate applied to its labor cost excluding subcontractor labor. |
| 17 | (i) Insert the prime's fixed fee rate applied to the subcontractor labor, if any. |
| 18 | (j) Insert the prime's material handling and G&A rates, respectively, that will be applied to the Material CLIN. If not applying a material handling or G&A, these cells should be left blank. |
| 19 | (k) Insert the prime's G&A rate that will be applied to the Travel CLIN. If not applying a G&A rate, the cell should be left blank. |
| 20 | In column K (prime P6 or subcontractor direct P6 submittal to formulate cost build-up): |
| 21 | (a) Enter the hours proposed for each individual labor category for column H |
| 22 | (b) Insert the "labor base" to apply the full-time fringe rate, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 23 | (c) Insert the "labor base" to apply the part-time fringe rate, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 24 | (d) Insert the "labor base" to apply the contractor's facility overhead rate. |
| 25 | (e) Insert the "labor base" to apply the Client/Gov't site overhead rate. |
| 26 | (f) Insert the "labor base" to apply the G&A rate. |
| 27 | (g) Insert the "labor base" to the fixed fee rate for prime P6 submittal or subcontractor direct P6 submittal (if prime P6 submittal, this shall exclude subcontractor labor). |
| 28 | (h) Insert the prime contractor's subcontractor "labor base" to apply its fixed fee rate, if any. |
| 29 | Column "M" automatically calculated the total hours. |
| 30 | Column "N" is a summation of the costs. |
| 31 | If there is not going to be any data entry in a row or group of rows, hide the rows. Do not delete any rows or columns. |
| 32 | The summary sheet calculates by pulling in data from the specified corresponding cells in each worksheet, ensure that the labor categories rows are consistent on each worksheet and with the Summary Sheet. |
| 33 | When submitting this file, the instructions may be deleted. |
| 34 | Note: Cell and row numbering above may change if more rows are added in prime contractor and/or subcontractor sections. |
Summary SOLICITATION N68520-22-R-0042 SOLICICITATION TYPE: Firm Fixed Price (FFP)
| IGCE | Labor Hours (Prime) | Labor Cost (Prime) | Total Fringe | Total Overhead | Total G&A | Total Labor (Prime) | Labor Hours (Sub) | Fee/Profit | Total Labor and Sub | Total Cost |
| BASE YEAR | 1,920 | $ 11,520.00 | $ - 0 | $ - 0 | $ - 0 | $ 11,520.00 | 0 | $ - 0 | $ - 0 | $ - 0 |
| OPTION YEAR 1 | 1,920 | $ 11,520.00 | $ - 0 | $ - 0 | $ - 0 | $ 11,520.00 | 0 | $ - 0 | $ - 0 | $ - 0 |
| OPTION YEAR 2 | 1,920 | $ 11,520.00 | $ - 0 | $ - 0 | $ - 0 | $ 11,520.00 | 0 | $ - 0 | $ - 0 | $ - 0 |
| OPTION YEAR 3 | 1,920 | $ 11,520.00 | $ - 0 | $ - 0 | $ - 0 | $ 11,520.00 | 0 | $ - 0 | $ - 0 | $ - 0 |
| OPTION YEAR 4 | 1,920 | $ 11,520.00 | $ - 0 | $ - 0 | $ - 0 | $ 11,520.00 | 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL | 9,600 | 57,600 | 0 | 0 | 0 | 57,600 | 0 | 0 | 0 | $ - 0 |
BP
| SOLICITATION | N68520-22-R-0042 | SOLICICITATION TYPE: Firm Fixed Price (FFP) | ||||||||||
| Offeror/Company Name | ||||||||||||
| Offerors/Company Address | ||||||||||||
| Point of Contact & Phone Number | ||||||||||||
| Cage Code | ||||||||||||
| Base Year 1 (BP1) | CLIN 0001 | |||||||||||
| Period of Performance | ||||||||||||
| SERVICES - PRIME CONTRACTOR | ||||||||||||
| LABOR CATEGORIES (* = key) | Gov't Skill Type | Offeror's Proposed Number of Whole Heads FFP (FTEs) | Full Time (F) or Part Time (P) | FFP Regular Labor Hours Per Year | Total Labor Hours | Rate | Rate * Labor Hours | Subtotal | SUM | Total | ||
| 1920 | ||||||||||||
| ***Program / Operations Manager | 11-1021 | N/A | 1 | 1,920 | 1,920 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | ||
| Ground Support Equipment (GSE) Mechanic | N/A | 23380 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Ground Support Equipment (GSE) Worker | N/A | 23382 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Material Coordinator (Hazard / Non Hazard) | 43-5061 | 21030 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Production Control Clerk | N/A | 1270 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Supply Technician | 43-5061 | 1410 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Subtotal | 11,520 | $ 1,920.00 | $ 11,520.00 | $ - 0 | $ 11,520.00 | $ - 0 | ||||||
| Indirect Cost - Fringe Fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Indirect Cost - Fringe Part Time | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Base | ||||||||||||
| Overhead | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Total Labor | $ - 0 | $ - 0 | ||||||||||
| SUB CONTRACTOR | ||||||||||||
| Labor Categories | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | |||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Subtotal | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Subcontractors | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||
| Subcontractor Handling | 0.00% | $ - 0 | $ - 0 | |||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Fee/Profit - prime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| prime's fee/profit on subcontractor | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | ||
| Fee/Profit Pool | $ - 0 | $ - 0 | ||
| Total Labor and Subcontractor | 1,920.0 | $ - 0 | -0 | $ - 0 |
Grand Total Services & Cost - 0 $ - 0
Attachment_P6_CLIN_Breakout_Spreadsheet (RFP# N6852022R0001 &A
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0031
OP1
| SOLICITATION | N68520-22-R-0042 | SOLICICITATION TYPE: Firm Fixed Price (FFP) | ||||||||||
| Offeror/Company Name | ||||||||||||
| Offerors/Company Address | ||||||||||||
| Point of Contact & Phone Number | ||||||||||||
| Cage Code | ||||||||||||
| Option Period 1 (OP1) | CLIN 0002 | |||||||||||
| Period of Performance | ||||||||||||
| SERVICES - PRIME CONTRACTOR | ||||||||||||
| LABOR CATEGORIES (* = key) | Gov't Skill Type | Offeror's Proposed Number of Whole Heads FFP (FTEs) | Full Time (F) or Part Time (P) | FFP Regular Labor Hours Per Year | Total Labor Hours | Rate | Rate * Labor Hours | SUM | Total | |||
| 1920 | ||||||||||||
| ***Program / Operations Manager | 11-1021 | N/A | 1 | 1,920 | 1,920 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | ||
| Ground Support Equipment (GSE) Mechanic | N/A | 23380 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Ground Support Equipment (GSE) Worker | N/A | 23382 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Material Coordinator (Hazard / Non Hazard) | 43-5061 | 21030 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Production Control Clerk | N/A | 1270 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Supply Technician | 43-5061 | 1410 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Subtotal | 11,520 | $ 1,920.00 | $ 11,520.00 | $ - 0 | $ 11,520.00 | $ - 0 | ||||||
| Indirect Cost - Fringe Fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Indirect Cost - Fringe Part Time | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Base | ||||||||||||
| Overhead | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Total Labor | $ - 0 | $ - 0 | ||||||||||
| SUB CONTRACTOR | ||||||||||||
| Labor Categories | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | |||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Subtotal | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Subcontractors | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||
| Subcontractor Handling | 0.00% | $ - 0 | $ - 0 | |||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Fee/Profit - prime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| prime's fee/profit on subcontractor | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | ||
| Fee/Profit Pool | $ - 0 | $ - 0 | ||
| Total Labor and Subcontractor | 1,920.0 | $ - 0 | -0 | $ - 0 |
Grand Total Services & ODCs - 0 $ - 0
Attachment_P6_CLIN_Breakout_Spreadsheet (RFP# N6852022R0001
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0031
OP2
| SOLICITATION | N68520-22-R-0042 | SOLICICITATION TYPE: Firm Fixed Price (FFP) | ||||||||||
| Offeror/Company Name | ||||||||||||
| Offerors/Company Address | ||||||||||||
| Point of Contact & Phone Number | ||||||||||||
| Cage Code | ||||||||||||
| Option Period 2 (BP2) | CLIN 0003 | |||||||||||
| Period of Performance | ||||||||||||
| SERVICES - PRIME CONTRACTOR | ||||||||||||
| LABOR CATEGORIES (* = key) | Gov't Skill Type | Offeror's Proposed Number of Whole Heads FFP (FTEs) | Full Time (F) or Part Time (P) | FFP Regular Labor Hours Per Year | Total Labor Hours | Rate | Rate * Labor Hours | SUM | Total | |||
| 1920 | ||||||||||||
| ***Program / Operations Manager | 11-1021 | N/A | 1 | 1,920 | 1,920 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | ||
| Ground Support Equipment (GSE) Mechanic | N/A | 23380 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Ground Support Equipment (GSE) Worker | N/A | 23382 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Material Coordinator (Hazard / Non Hazard) | 43-5061 | 21030 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Production Control Clerk | N/A | 1270 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Supply Technician | 43-5061 | 1410 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Subtotal | 11,520 | $ 1,920.00 | $ 11,520.00 | $ - 0 | $ 11,520.00 | $ - 0 | ||||||
| Indirect Cost - Fringe Fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Indirect Cost - Fringe Part Time | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Base | ||||||||||||
| Overhead | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Total Labor | $ - 0 | $ - 0 | ||||||||||
| SUB CONTRACTOR | ||||||||||||
| Labor Categories | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | |||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Subtotal | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Subcontractors | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||
| Subcontractor Handling | 0.00% | $ - 0 | $ - 0 | |||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Fee/Profit - prime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| prime's fee/profit on subcontractor | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | ||
| Fee/Profit Pool | $ - 0 | $ - 0 | ||
| Total Labor and Subcontractor | 1,920.0 | $ - 0 | -0 | $ - 0 |
Grand Total Services & ODCs - 0 $ - 0
Attachment_P6_CLIN_Breakout_Spreadsheet (RFP# N6852022R0001
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0031
OP3
| SOLICITATION | N68520-22-R-0042 | SOLICICITATION TYPE: Firm Fixed Price (FFP) | ||||||||||
| Offeror/Company Name | ||||||||||||
| Offerors/Company Address | ||||||||||||
| Point of Contact & Phone Number | ||||||||||||
| Cage Code | ||||||||||||
| Option Period 2 (BP2) | CLIN 0004 | |||||||||||
| Period of Performance | ||||||||||||
| SERVICES - PRIME CONTRACTOR | ||||||||||||
| LABOR CATEGORIES (* = key) | Gov't Skill Type | Offeror's Proposed Number of Whole Heads FFP (FTEs) | Full Time (F) or Part Time (P) | FFP Regular Labor Hours Per Year | Total Labor Hours | Rate | Rate * Labor Hours | SUM | Total | |||
| 1920 | ||||||||||||
| ***Program / Operations Manager | 11-1021 | N/A | 1 | 1,920 | 1,920 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | ||
| Ground Support Equipment (GSE) Mechanic | N/A | 23380 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Ground Support Equipment (GSE) Worker | N/A | 23382 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Material Coordinator (Hazard / Non Hazard) | 43-5061 | 21030 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Production Control Clerk | N/A | 1270 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Supply Technician | 43-5061 | 1410 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Subtotal | 11,520 | $ 1,920.00 | $ 11,520.00 | $ - 0 | $ 11,520.00 | $ - 0 | ||||||
| Indirect Cost - Fringe Fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Indirect Cost - Fringe Part Time | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Base | ||||||||||||
| Overhead | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Total Labor | $ - 0 | $ - 0 | ||||||||||
| SUB CONTRACTOR | ||||||||||||
| Labor Categories | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | |||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Subtotal | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Subcontractors | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||
| Subcontractor Handling | 0.00% | $ - 0 | $ - 0 | |||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Fee/Profit - prime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| prime's fee/profit on subcontractor | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | ||
| Fee/Profit Pool | $ - 0 | $ - 0 | ||
| Total Labor and Subcontractor | 1,920.0 | $ - 0 | -0 | $ - 0 |
Grand Total Services & ODCs - 0 $ - 0
Attachment_P6_CLIN_Breakout_Spreadsheet (RFP# N6852022R0001
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0031
OP4
| SOLICITATION | N68520-22-R-0042 | SOLICICITATION TYPE: Firm Fixed Price (FFP) | ||||||||||
| Offeror/Company Name | ||||||||||||
| Offerors/Company Address | ||||||||||||
| Point of Contact & Phone Number | ||||||||||||
| Cage Code | ||||||||||||
| Option Period 2 (BP2) | CLIN 0005 | |||||||||||
| Period of Performance | ||||||||||||
| SERVICES - PRIME CONTRACTOR | ||||||||||||
| LABOR CATEGORIES (* = key) | Gov't Skill Type | Offeror's Proposed Number of Whole Heads FFP (FTEs) | Full Time (F) or Part Time (P) | FFP Regular Labor Hours Per Year | Total Labor Hours | Rate | Rate * Labor Hours | SUM | Total | |||
| 1920 | ||||||||||||
| ***Program / Operations Manager | 11-1021 | N/A | 1 | 1,920 | 1,920 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | ||
| Ground Support Equipment (GSE) Mechanic | N/A | 23380 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Ground Support Equipment (GSE) Worker | N/A | 23382 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Material Coordinator (Hazard / Non Hazard) | 43-5061 | 21030 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Production Control Clerk | N/A | 1270 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Supply Technician | 43-5061 | 1410 | 1,920 | 0 | $ - 0 | $ - 0 | $ - 0 | 1,920.0 | $ - 0 | |||
| Subtotal | 11,520 | $ 1,920.00 | $ 11,520.00 | $ - 0 | $ 11,520.00 | $ - 0 | ||||||
| Indirect Cost - Fringe Fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Indirect Cost - Fringe Part Time | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Base | ||||||||||||
| Overhead | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Total Labor | $ - 0 | $ - 0 | ||||||||||
| SUB CONTRACTOR | ||||||||||||
| Labor Categories | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | |||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 0 | 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Subtotal | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Total Subcontractors | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||
| Subcontractor Handling | 0.00% | $ - 0 | $ - 0 | |||||||||
| Subtotal | $ - 0 | $ - 0 | ||||||||||
| Fee/Profit - prime | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| prime's fee/profit on subcontractor | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | ||
| Fee/Profit Pool | $ - 0 | $ - 0 | ||
| Total Labor and Subcontractor | 1,920.0 | $ - 0 | -0 | $ - 0 |
Grand Total Services & ODCs - 0 $ - 0
Attachment_P6_CLIN_Breakout_Spreadsheet (RFP# N6852022R0001
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0031
File details come from the government source that posted it. Updated .