About this file

This is a presolicitation notice for an indefinite delivery indefinite quantity contract to provide information technology solutions support services to the Naval Air Systems Command, Naval Air Warfare Centers, Fleet Readiness Center Headquarters, and individual Fleet Readiness Centers. The scope of work includes activities across the software development life cycle, commercial off-the-shelf and software-as-a-service utilization, and support functions such as program management, systems engineering, and cybersecurity. The contract is set aside for small businesses with a size standard of $41.5 million and NAICS code 541330. The government anticipates a single award contract with a period of performance from November 2020 through contract award. Interested vendors must submit any questions by May 19, 2020 regarding the draft statement of work. The final request for proposals is scheduled for release in June 2020 with proposals due in July 2020 and contract award anticipated in November 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Information Technology (IT) Solutions Support, newest first.
File Type Posted
N6852021R0004 - Amendment 0002.docx DOCX document
Attachment L2 - Contract Reference Experience Information A2.xlsx XLSX spreadsheet
RFP N6852021R0004 Questions_Answers 22 April 2021.pdf PDF
Attachment 5 Navair CSIP.pdf PDF
Attachment L6 - CBO IT Toolsets and Enterprise Efforts A1.pdf PDF
Attachment L5 - Key Personnel Resume and Qualification Matrix A1.docx DOCX document
Attachment L2 - Contract Reference Experience Information A1.xlsx XLSX spreadsheet
N6852021R0004--Amendment 0001.pdf PDF
Attachment L10 - Cost_Price Spreadsheet-REV1.xlsx XLSX spreadsheet
Attachment L12 - Direct Labor Ranges- REV1.pdf PDF
RFP N6852021R0004 Questions 3_18_21.pdf PDF
Attachment L7 - Offer Letter.docx DOCX document
Attachment L1 - Corporate Experience Summary Tables_Amend.xlsx XLSX spreadsheet
Attachment 4 - OCI List.doc DOC document
Attachment L11- Key Personnel Acknowledgement of Commitment.docx DOCX document
Attachment L9 - Cost and Price Narrative.docx DOCX document
Attachment 5 ITSS CDRLs.pdf PDF
Attachment 2_N68520-21-R-0004 BID DD254 signed.pdf PDF
N6852021R0004 -IT SS RFP.docx DOCX document
Attachment L10 - Cost_Price Spreadsheet.xlsx XLSX spreadsheet
Attachment L2 - Contract Reference Experience Information.xlsx XLSX spreadsheet
Attachment L4 - Management Approach.doc DOC document
Attachment L5 - Key Personnel Resume and Qualification Matrix.docx DOCX document
Attachment 1_Contract Surveillance Plan.docx DOCX document
Attachment 3_ Data Item Transmittal Form.doc DOC document
Attachment L3 - Understanding and Approach.doc DOC document
Attachment L12 - Direct Labor Ranges.pdf PDF
Attachment L8 - CBO ITSS RFP N6852021R0004 Checklist.docx DOCX document
Attachment L6 - CBO IT Toolsets and Enterprise Efforts.docx DOCX document
QA N68520-20-R-0002-16 DEC2020.pdf PDF
Attachment L1 - Corporate Experience Summary Tables_Amend.xlsx XLSX spreadsheet
Attachment L11- Key Personnel Acknowledgement of Commitment.docx DOCX document
Attachment L3 - Understanding and Approach.doc DOC document
Attachment L7 - Offer Letter.docx DOCX document
Attachment L6 - CBO IT Toolsets and Enterprise Efforts.xlsx XLSX spreadsheet
Attachment L13 - CBO ITSS RFP N6852020R0002 Questions.xlsx XLSX spreadsheet
Attachment L12 - Direct Labor Rate Ranges.pdf PDF
Attachment L9 - Cost and Price Narrative.docx DOCX document
Attachment L5 - Key Personnel Resume and Qualification Matrix.docx DOCX document
Attachment L4 - Management Approach.doc DOC document
Attachment L10 - Cost_Price Spreadsheet.xlsx XLSX spreadsheet
Attachment L8 - CBO ITSS RFP N68520R0002 Checklist.docx DOCX document
Attachment L6 - CBO IT Toolsets and Enterprise Efforts.pdf PDF
Attachment L2 - Contract Reference Experience Information.xlsx XLSX spreadsheet
N6852020R0002 -CBO ITSS - DRAFT RFP.pdf PDF
IT Solutions Support - Draft SOW QA 01 - 04 Jun 2020.pdf PDF
DRAFT Statement of Work.pdf PDF
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6852021R0004

Section A - Solicitation/Contract Form

SECTION A

A.1 NOTICES TO OFFERORS

a) This is the DRAFT solicitation is for the Information Technology Solutions Support (ITSS) single award Indefinite Delivery Indefinite Quantity (IDIQ) with a five year ordering period.

b) Throughout this document, this procurement will be referred to as “ITSS.”

c) Offerors must follow the instructions set forth in this solicitation to be considered for award. Any amendment(s) to this solicitation will be posted to https://www.beta.sam.gov.

d) This solicitation is a Total Small Business Set-Aside in accordance with FAR 19.502-2.

e) This solicitation’s Small Business Size Standard is $41.5M and covers North American Industry Classification System (NAICS) code 541330.

SUMMARY OF AMENDMENT(S)

Summary of Amendment(s)

Amendment 2 (All changes are highlighted in green) The proposal due date has been extended to 2pm Eastern Time, 14 May 2021. The following section has been updated:

1. Updated Section L

(a) Part A - General Information, Paragraph 2.0 “Electronic Proposal Format”

(b) Part B – Specific Instructions, Paragraph 3.1 “Volume Content”

Amendment 1 (All changes are highlighted in orange) The proposal due date has been extended to 2pm Eastern Time, 6 May 2021. The following sections have been updated:

1. Updated Section C, Section 3.2.12.1 Cybersecurity Plan and 3.4.1 “Experience and Education Level Definitions”, "Junior" paragraph

2. Updated Section K, Clause 52.204-8 "Annual Representations and Certifications (MAR 2020). Updated to $41.5M

3. Updated Section J

4. Updated Section K, clause 52.204-8 Annual Representations and Certifications (MAR 2020)

5. Updated Section L:

(a) Section “Part A- General Information”, Paragraph 3.0 “Proposal Content and Volumes”, chart page limits

(b) Section “Part B-Specific Instructions”, Section 1.0 Volume 1: Corporate Experience (#1, #4, #4b)

(c) Section “Part B-Specific Instructions, Section 3.0 Volume 3: Price/Cost and General Information, Paragraph 3.5.2 Labor Hours

6. Updated Section M:

(a) Section Part B: Specific Information, Paragraph 1.0 Corporate Experience

All other terms and conditions remain unchanged.

Section B - Supplies or Services and Prices

SECTION B

B.1 BACKGROUND

a) The ITSS IDIQ is designed to address the need for a full range of ITSS in support of the Naval Air Systems Command (NAVAIR), Naval Air Warfare Centers (NAWC), Fleet Readiness Center (FRC) Headquarters and individual FRC’s Information Technology (IT) and related missions and initiatives. The full scope of services for the ITSS IDIQ is defined in Section C.

B.1.1 CONTRACT AND FUNDING TYPE(S)

a) This Non-Performance Based Level of Effort (LOE) Term IDIQ allows for cost reimbursable (no fee) and cost-plus fixed fee (CPFF) Contract Line Item Number (CLIN) types at the task order (TO) level. Additionally, TOs may include option periods.

b) The Contracting Officer will identify the applicable funding type for all CLINs in each TO. The Government anticipates, but is not limited to, using the following fund types: O&MN, OP, AP, and RDT&E.

B.1.2 MINIMUM GUARANTEE AND MAXIMUM CEILING

a) The Government will award a TO for $1,000.00 to attend a post award conference; this will satisfy the minimum guarantee under the ITSS IDIQ.

b) The cumulative total of all TOs issued pursuant to the IDIQ issued under this solicitation shall not exceed $TBD at time of contract award.

B.2 STREAMLINED ORDERING PROCEDURES

a) LOE Orders will be issued under this contract using the following streamlined ordering procedures in conjunction with NAVAIR Clause 5252.216-9534, TASK ORDER PROCEDURES:

1) For each proposed order, the ordering officer will provide the contractor with a Task Order (TO) and an Independent Government Cost Estimate (IGCE). The IGCE is an estimate of labor hours by labor category utilizing the estimated and negotiated composite labor rates, outlined in the table below, to calculate the total estimated cost for the proposed TO. The TO fixed fee is calculated using Section H Clause 5252.232-9510 PAYMENT OF FIXED FEE (NAVAIR).

2) These composite rates are estimates, and invoicing will be based upon actual costs incurred. Ceiling for Other Direct Costs (ODC) will be priced in accordance with the Government estimate. TOs crossing multiple years will be estimated by the Government using the composite rates for each year in proportion to the period of performance of the TO.

3)Within three (3) working days of receipt of the TO and IGCE, the contractor shall respond with the signed DD1155. If the requirement remains valid, the task order shall be considered negotiated and a bilaterally executed TO will be issued to the contractor.
(i)If the contractor does not agree with the TO and/or IGCE, a proposal will be submitted to the contracting officer within five (5) working days of receipt of the TO and IGCE, addressing only the specific areas of difference. Once the differences are resolved between the contracting officer and the contractor, the contracting officer determines the price to be fair and reasonable, and the requirement remains valid, a fully negotiated priced order will be issued to the contractor.

4) If the contractor fails to respond to the proposed order within five (5) working days of receipt of the TO, the contracting officer may unilaterally issue the TO or extend the deadlines above when in the best interest of the Government.

b) The composite rates in the “B.2 Estimated and Negotiated Labor Rates” table below will be used to develop the total estimated cost plus fixed fee for task orders. Fixed fee will be calculated based on fee per hour and in accordance with 5252.232-9510 Payment of Fixed Fee (NAVAIR) (OCT 2005). The fee per hour is the total fee proposed for all periods divided by the total number of hours for all periods (see 5252.211-9503 for total level of effort). The non-performance based fee per hour is $TBD at time of contract award.

c) Estimated and Negotiated Labor Rates (TBD at time of contract award)

Labor Category (On Contract)
Composite Fully Burdened Rates

(Regardless of Clearance Level or Performance Location)

Year 1
Year 2
Year 3
Year 4
Year 5

Program/Project Management Analyst, Senior (13-1111) (Key)

Program/Project Management Analyst, Journeyman (13-1111)

Data Scientist, Senior (15-2050) (Key)

Data Scientist, Journeyman (15-2050)

Software Developers, Senior (15-1252) (Key)

Software Developers, Journeyman (15-1252)

Software Quality Assurance Analyst and Testers, Senior (15-1253) (Key)

Software Quality Assurance Analyst and Testers, Journeyman (15-1253)

Software Engineer, Senior (17-2199) (Key)

Software Engineer, Journeyman (17-2199)

Information Security Analyst, Senior (15-1212) (Key)

Information Security Analyst, Journeyman (15-1212)

Information Security Analyst, Junior (15-1212)

Manager/Operations Managers, Senior (11-1021) (Key)

Manager/Operations Managers, Journeyman (11-1021)

Computer Programmer, Senior (15-1251 )(Key)

Computer Programmer, Journeyman (15-1251 )

Database Administrators, Senior (15-1242) (Key)

Database Administrators Journeyman (15-1242)

Network and Computer Systems Administrators, Senior (15-1244) (Key)

Network and Computer Systems Administrators, Journeyman (15-1244)

Network and Computer Systems Administrators, Junior (15-1244)

Web developer, Senior (15-1254) (Key)

Web developer, Journeyman (15-1254)

Cyber Security Specialist, Senior (15-1299) (Key)

Cyber Security Specialist, Journeyman (15-1299)

Cyber Security Specialist, Junior (15-1299)

Training and Development Manager, Senior (13-3131) (Key)

Training and Development Manager, Journeyman (13-3131)

Computer User Support Specialist, Journeyman (15-1232)

Technical Writers, Journeyman (27-3042)

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

Information Technology Support Labor

CPFF

All CPFF labor ceiling, inclusive of cost and fee. Includes, but is not limited to, the following fund types: O&MN, OP, AP, and RDT&E. Appropriation(s) to be determined at the Task Order Level.

FOB: Destination

PURCHASE REQUEST NUMBER: 1300801169

PSC CD: D318

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

ODCs

COST

Cost Travel and Material Ceiling. Includes, but is not limited to, the following fund types: O&MN, OP, AP, and RDT&E. Appropriation(s) to be determined at the Task Order Level.

FOB: Destination

PSC CD: D318

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Technical Data (NSP)

COST

Technical Data in Support of CLINs 0001 and 0002

ESTIMATED COST

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9503LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) - ALT I (JUN 2013)
(a) The level of effort estimated to be ordered during the term of this contract is 412,800 man-hours of direct labor including authorized subcontract labor, if any. The estimated composition of the total man-hours of direct labor by classification is as follows:

To be specified in individual task orders

(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(c) It is agreed that while the contractor's performance during the period set forth in paragraph (a) above is based upon an anticipated level of effort consisting of man-hours of direct labor (as may be described or defined elsewhere herein), such level of effort may fluctuate, either upward or downward, by no more than ten (10%) percent of the total anticipated man-hours. This fixed fee is agreed to be paid for man-hours expended from ninety (90%) percent to one hundred ten (110%) percent of the total anticipated man-hours. The fixed fee shall not vary with the cost of the actual effort supplied within this range. In the event that less than ninety (90%) percent of the anticipated level of effort is actually expended by the expiration date of the contract, the Government shall have the option of:
(1) requiring the contractor to continue to perform until the level of effort expended equals ninety (90%) percent of the anticipated level of effort; or
(2) effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than ninety (90%) percent of the anticipated level of effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.

Section C - Descriptions and Specifications

STATEMENT OF WORK

Statement of Work (SOW) For Information Technology Solutions Support (ITSS)

1.0 Introduction / Scope

1.1 Introduction: This Statement of Work (SOW) supports the mission(s) of the Naval Air Systems Command (NAVAIR), Naval Air Warfare Centers (NAWC), Fleet Readiness Center (FRC) Headquarters, and individual FRC’s Information Technology (IT) and related initiatives. Naval Aviation must be capable of responding quickly and operating effectively across a wide range of environments, which has solidified the importance of IT solutions. High readiness demands adequate, well-maintained equipment; realistic training; strategic mobility; and sufficient Naval Aviation support and sustainment capabilities. The rapid evolution of IT can enhance Naval Aviation’s speed to the fleet principles including capability, productivity, quality, and cost control. For Naval Aviation to maintain cutting edge, there is a need for restructuring by developing and implementing IT solutions to better align with the realities of the digital age. IT has fundamentally changed the relationship between people and knowledge, developing a need for advanced IT solutions. In order to maintain updated and current IT the Government will need to be able to provide solutions safely, quickly, and economically. Now more than ever, well-planned IT solution investments will provide timely, comprehensive, and detailed support to the U.S. Warfighter. The Navy is seeking a multi-faceted team with experience in existing NAVAIR Logistics, Maintenance, Analytical, and FRC IT solution sets that will enhance Naval Aviation’s ability in achieving speed to the fleet and affordability principles

1.2 Scope: The scope of this effort is to provide IT and related initiatives and solutions for NAVAIR, NAWC, FRC Headquarters, and FRC’s. This scope includes:

All activities of the Software Development Life Cycle (SDLC):

- Planning
- Systems Analysis and Requirements
- Systems Design
- Development
- Integration/Testing/Verification and Validation
- Deployment
- Operations and Maintenance

All activities associated with Commercial Off the Shelf (COTS) and Software-as-a-Service (SaaS) utilization:

· Software Requirements Analysis

· Evaluation

- Implementation

- Operations and Support

Support activities:

· Program/Project Management

· Software and Systems Engineering

· Enterprise Architecture

· IT Compliance/Network Security/Cyber Security

· Configuration Management

· Risk Management

· Data/Modeling/Analytics

· Database Administration

· Web Support

· Sustainment

· Education and Training

· Help/Service Desk

· Documentation

2.0 Applicable Documents: NOTE: Throughout the life of the contract, if any instruction or document referenced in section 2.0 is replaced or superseded, the replacement or superseding instruction or document shall be applicable to the requirements defined in this SOW.

2.1 Department of Defense Specifications.

2.1.1 DoD 5220.22-M, National Industrial Security Program Operating Manual, (NISPOM) 28 Feb 2006

2.1.2 SECNAV M-5510.36 Information Security Program, 30 Jun 2006

2.1.3 DoDM 5200.01 (DoD Information Security Program: Controlled Unclassified Information (CUI)) Vol. 4 (enclosure 3 pages 11-18) 24 Feb 2012

2.1.4 DoD 5400.7-R, Freedom of Information Program Chapter 3 (pages 31-42) Sep 1998

2.1.5 DoDD 5230.24 Distribution Statements on Technical Documents, Change 1, Effective 28 Apr 2016

2.1.6 SECNAV M-5510.30 Personnel Security Program Jun 2006

2.1.7 OPNAVINST 3440.17A Navy Installation Emergency Management Program, 1 Aug 2014

2.1.8 DoD 8570.01-M Information Assurance Workforce Improvement Program 19 Dec 2005

2.1.9 Cybersecurity Maturity Model Certification (CMMC) Version 1.0 31 Jan 2020

2.2 Department of Defense Standards.

A comprehensive list of Navy regulatory documents can be found at the DON Chief Information Officer (CIO) IT Policy and Guidance website http://www.doncio.navy.mil/.

The Contractor shall be responsible for researching and complying with any additional regulations applicable to the task areas in which they are involved.

2.3 Other Government documents (e.g. NAVAIR Documents)

None

2.4 Industry documents

None

3.0 Requirements

3.1 General Requirements

3.1.1 Compatibility - The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government IT environment through the security classification of SECRET up to and including TOP SECRET, unless otherwise noted herein. The current operating environment required for this contract includes:

Microsoft Windows 10 Microsoft Project 2010 Microsoft Office 2016 Adobe Acrobat XI (reader) Internet access

The Contractor shall maintain the ability to interface with and transfer data to and from requiring office software applications and their upgraded versions. The Contractor shall maintain state-of the-art anti-virus software and ensure that all media are virus free when delivered. The Contractor shall be capable of Internet and Local Area Network (LAN) communications with the Government Customers. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with the Government Customers during working hours whether at Contractor work site or on travel.

3.1.2 Work Location and Facilities

3.1.2.1 Work Location: Approximately 70 percent of work is anticipated to be performed at the Government site and 30 percent of work performed at the Contractor site based on Government requirements. During contract execution, task orders may be issued for either contractor facility or Government site depending on Government requirements. Government site(s) include NAVAIR Headquarters at Patuxent River, MD, the NAWCADs at Patuxent River, MD, Lakehurst, NJ, and Orlando, FL; the NAWCWDs located at China Lake, CA and Point Mugu, CA; and the In-Service Support Centers (ISSC) located at Jacksonville, FL, Cherry Point, NC, and North Island, CA. The following FRCs are applicable to this contract effort Commander Fleet Readiness Center, Patuxent River, MD (COMFRC), Fleet Readiness Center Southeast, Jacksonville, FL (FRC-SE), Fleet Readiness Center East, Cherry Point, NC (FRC-E), Fleet Readiness Center Southwest, North Island, CA (FRC-SW), Fleet Readiness Center, West, Lemoore, CA (FRC-W), Fleet Readiness Center, North West, Whidbey Island, WA (FRCNW), Fleet Readiness Center, and Western Pacific, Atsugi, Japan (FRCWP). This list is not all-inclusive as locations may change over the life of the contract. Contractors shall have facilities within 10 driving miles of Naval Air Station Patuxent River. Contractor personnel performing on-site support will be provided access to Government workspaces, telephones, printers, copy machines, shredders, computers, and network access including web servers and applicable databases or other applications necessary to carry out assigned tasks.

3.1.2.2 Meeting Support: In support of the tasking outlined in this SOW, the Prime Contractor’s facility shall be able to host/conduct meetings and training sessions with a location within 10 driving miles of Naval Air Station Patuxent River, MD. These efforts shall be supported at classification levels up to the UNCLASSIFIED level. The meeting / training room capacity shall support a minimum of thirty (30) persons utilizing NMCI network connected laptop assets (meeting attendees / students training will bring their own assets). The meeting / training room shall be configured with contractor furnished telephone, VTC capability, and computer networking capability as well as sufficient equipment to conduct meetings with presentations including compatible software in Paragraph 3.1.1. The Contractor shall provide simultaneous connection (computer-networking capability) to allow attendees to connect with NAVAIR’s NMCI work environment.

3.1.3 Work Schedule to include Compressed Work Schedule (CWS), overtime, holidays, and installation closure.

3.1.3.1 Work Schedule: The Contractor shall provide the required services and staffing coverage during normal working hours. Normal working hours are usually 8.5 hours (including a 30-minute lunch break), from 0800 to 1630 each Monday through Friday (except on the legal holidays specified in paragraph 3.1.4.1.2). Some supported Government offices have flexibility to start as early as 0600 and end as late as 1800, Monday – Friday.

3.1.3.1.1 Compressed Work Schedule (CWS): CWS is an alternative work schedule to the traditional five (5), 8.5-hour workdays (which includes a 30-minute lunch) worked per week. Under a CWS schedule, an employee completes the following schedule within a two-week period: eight (8) weekdays are worked at 9.5 hours each (which includes a 30-minute lunch), one (1) weekday is alternately worked as 8.5 hours (which includes a 30-minute lunch), and the employee does not work one (1) weekday. The result is 80 hours worked every two (2) weeks, with 44 work hours one week and 36 work hours the other.

The Contractor may allow its employees to work a CWS schedule provided the requirements of this SOW are met and CWS is approved by the Contracting Officer Representative (COR). If the Contractor chooses to allow its employees to work a CWS schedule in support of this contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this contract and will not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage by the Government.

3.1.3.1.2 Holidays: The Government observes the following holidays:

New Year’s Day,January 1
Martin Luther King’s Birthday,Third Monday in January
President’s Birthday,Third Monday in February
Memorial Day,Last Monday in May
Independence Day,July 4
Labor Day,First Monday in September
Columbus Day,Second Monday in October
Veteran’s Day,November 11
Thanksgiving Day,Fourth Thursday in November
Christmas Day,December 25

With the exception of the events in section 3.1.4.1.3 below, the Contractor is permitted to observe the above Holidays in accordance with its corporate policy.

3.1.3.1.3 Installation Closure: When Federal facilities are closed by the Government, or when Federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility related problem that prevents Federal personnel from working at the Government facility, the Contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company’s policies.

While generally Contractor personnel may not perform work on-site at a Government facility without oversight from Federal personnel, in very limited circumstances, work performed by Contractor personnel deemed mission essential and performance of such mission essential work is authorized to continue at the Government facility despite the facility otherwise closed for normal operations. The circumstances permitting work being performed by Contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant Contracting Officer must concur with any determination that work performed by Contractor personnel is mission essential.

3.1.3.1.4 Overtime: Overtime will be determined at the task order level when applicable and be executed in accordance with task order determined requirements.

3.1.4 Other Direct Costs:

3.1.4.1 Travel: Travel will be determined at the task order level when applicable and executed in accordance with 5252.232-9509.

3.1.4.2 Material: Material will be determined at the task order level when applicable and executed in accordance with 5252.242-9515.

3.1.5 Subcontractors and Consultants: Provisions stated herein shall be clearly and effectively communicated to all subcontractors and consultants providing support under this contract. All provisions of this SOW shall flow down to subcontractors and consultants providing support under this contract.

3.1.6 Management of Contractor Personnel: The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, individual Contractor employees. The Contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services.

3.1.7 Transition Out Strategy

The Contractor’s overall transition out strategy shall be built around maintaining the mission of NAVAIR, NAWC, and FRCs IT solutions with minimal impact, not only in terms of timeliness of performance but also to ensure that critical data and knowledge transfer occurs. Upon termination or expiration of the contract, the Contractor shall ensure an orderly transition of responsibilities, while minimizing impact to the operation. The Contractor shall submit a Transition Out Plan, to include the minimum elements listed below in accordance with CDRL A002, Transition Out Plan.

- Work Turnover. The Contractor shall provide a plan of action, which effectively transfers tasked work that is in process at the expiration, or termination of the contract. Establish and maintain effective communication with the incoming Contractor or Government personnel for the period of transition via weekly status meetings.

- Quality Assurance. The Contractor shall provide a plan of action to ensure continuation of quality review processes during the transition period.

- Risk Mitigation Strategies. The Contractor shall provide a plan of action to mitigate contract performance risks (quality and schedule) encountered during the transition period.

- Data/Information Transfer. The Contractor shall provide a plan of action for the efficient inventory and transfer of program data.

3.1.8 Contract Kick-Off

The contractor shall plan and execute a post-award kickoff and introduction meeting with ITSS CBO representatives within three (3) weeks after contract award at proposed facility location. The Prime Contractor will be required to provide a presentation introducing its members and a brief synopsis of capabilities. The exact time, location and presentation content will be provided at time of award. (CDRL A00J)

3.2 Security

3.2.1 Citizenship Requirements: Only U.S. citizens may perform under this contract. If the Contractor cannot find qualified U.S. citizens to perform the work, the Contractor shall submit a citizenship waiver request with justification to the Government Security Office. The waiver request should include:

a. The individual's name, date and place of birth, position title, and current citizenship.

b. A statement that a qualified U.S. citizen cannot be hired in sufficient time to meet the contractual requirements.

c. A statement of the unusual expertise possessed by the applicant.

d. A statement that access will be limited to a specific Government contract (specify contract number).

e. A statement that the Contractor has obtained an export license for the information required to perform the contract.

3.2.2 Investigative Requirements:

Classified: All Contractor personnel shall maintain security clearance eligibility commensurate with the level of classification of the work performed as annotated in the Contract's DD-254, Contract Security Classification Specification Form.

Contractor personnel may be required to access classified information in performance of this contract up to and including TOP SECRET dependent on order issued. The Contractor shall be responsible for ensuring all personnel receive the requisite investigation and are favorably adjudicated in accordance with DoDM 5220.22, National Industrial Security Program Operating Manual. Contractor employees who fail to meet security clearance requirements shall not access classified information or perform sensitive duties. In such cases, the Contractor employee shall not perform on the contract.

The Contractor shall comply with security requirements specified in the DD-254 attached to this contract. Information or data that the Contractor accesses shall be handled at the appropriate classification level. Unclassified information shall be handled in accordance with the appropriate designation (Controlled Unclassified Information; For Official Use Only; Covered Defense Information). Distribution is authorized to the Requiring Office's Organization and supported Activities only. Other requests for deliverables under this contract shall be referred to the COR/TOCOR of this contract/task order for approval.

Controlled Unclassified Information including For Official Use Only and Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoDM 5200.01 (DoD Information Security Program: Controlled Unclassified Information (CUI)) Vol. 4 (enclosure 3 pages 11-18) available at http://www.dtic.mil/whs/directives/corres/pdf/520001_vol4.pdf. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24 (Distribution Statements on Technical Documents); and have this statement displayed per DoDI 5230.24, Enclosure 3.

3.2.3 Common Access Card (CAC)/Public Key Infrastructure (PKI), System Authorization Access Request (SAAR-N).

3.2.3.1 SAAR-N: All Contractor personnel requiring access to Government IT systems shall have an approved SAAR-N Form OPNAV 5239/14 (Rev Sep 2011) on file, and complete required Annual Information Awareness Training. New employees must submit their SAAR forms within thirty-days of their first day of work. SAAR-N forms shall be submitted to the COR, TOCOR, or to the assigned Government Trusted Associate Sponsorship System (TASS) Trusted Associate.

3.2.3.2 Command Access Cards (CAC) / Local Badges: Contractor CACs and facility specific identification badges issued by the Government to on-site Contractor personnel shall be visible at all times while personnel are at the Government site. The Contractor shall furnish all requested information required to facilitate issuance of identification badges and shall conform to Regulations Governing admissions to the each Government facility location. All CACs and identification badges issued to Contractor employees shall be returned to the Government Security Department at the Government site in accordance with Regulations Governing admissions to each Government facility location, following completion of the contract, relocation, or termination of an employee, or upon request from the COR/TOCOR. The Government will provide the Contractor access to Government facilities for performance of tasks under this contract. The local instructions cited herein may be revised in each task order issued hereunder as determined by the location of the work to be performed.

3.2.4 Information Security. If the work is performed at the Contractor’s facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with DoD 5220.22-M (NISPOM) and SECNAV M-5510.36. If the work is performed at the Government's facility, the Contractor shall comply with the sites security procedures and controls.

3.2.4.1 Marking: All information generated by the Contractor shall be properly marked. For Official Use Only information generated and/or provided under this contract shall be marked in accordance with DoDM 5200.01. Technical information shall also be marked with appropriate Distribution Statements and Export Control warnings in accordance with DoDD 5230.24 and Program Security Classification Guidance.

3.2.4.2 Public Release: No information pertaining to this contract shall be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by the appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to release through the servicing agency’s Public Affairs Office via the PCO.

3.2.4.3 Loss, Compromise, and/or Electronic Spillage of Classified or Controlled Unclassified Information: All instances of loss, compromise, and electronic spillage of classified or controlled unclassified information shall be reported to the COR, TOCOR, and Government Security Office within 24 hours of the incident occurring.

3.2.5 Operations Security (OPSEC): The Contractor shall develop, implement, and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. This program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Decision Directive (NSDD) 298, and at a minimum shall include:

a. Assignment of responsibility for OPSEC direction and implementation.

b. Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.

c. Establishment of OPSEC education and awareness training.

d. Provisions for management, annual review, and evaluation of OPSEC programs.

e. Flow down of OPSEC requirements to subcontractors when applicable.

While performing aboard NAVAIR, NAWC or FRC sites, the Contractor shall comply with facility OPSEC program instructions and contribute to organization-level OPSEC efforts. Include OPSEC as part of its ongoing security awareness program and take all required Agency training. Be responsive to the Supporting OPSEC Manager on a non-interference basis. Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the RO and Contractor in support of the mission. (CDRL A007)

3.2.6 Anti-Terrorism Force Protection and Emergency Management: The work performed on this contract is not Emergency Essential in accordance with OPNAVINST 3440.17A and Government Emergency Management, Antiterrorism, and/or Continuity of Operations Plans. Contractor personnel shall comply with all Government Emergency Management, Antiterrorism, and/or Continuity of Operations Plans and directives. Contractor personnel shall not report for work at Government facilities upon declaration of Force Protection Condition CHARLIE or in any event or emergency where Government officials direct curtailment of operations to “Mission Essential Only.” All Contractor personnel assigned to a Government facility shall complete annual Antiterrorism (Level One) and Active Shooter training.

3.2.7 Classified COMSEC material is not releasable to Contractor employees who have not received a final security clearance at the appropriate level. Cryptologic keying materials and Controlled Cryptographic Items (CCI) are controlled by Department of the Navy, NISPOM, and National Security Agency (NSA) guidelines. The Contractor shall be guided by NSA/CSS Policy Manual 3-16 in the control and protection of COMSEC material/information at their facilities. When access is required at Government facilities, Contractor personnel shall adhere to COMSEC rules and regulations as mandated by DoD 5520.22-M, EKMS 1 (series) and Command policy and procedures. Written concurrence of the Government Contracting Activity (GCA) or Point of Contact (POC), identified in Block 16 of the DD254, or Contracting Officer Representatives required prior to adding/changing subcontractors.

3.2.8 Non-SCI: No Contractor access to Non-SCI intelligence information or Foreign Intelligence Information required (Secret Internet Protocol Network (SIPRNet) access requirement only). If additional access via SIPRNet is required, the Technical Point of Contact/Contracting Officer Representative must modify/revise the requirements of DD254 for Scientific Technical Intelligence Liaison Officer (STILO) approval and signature.

3.2.9 North Atlantic Treaty Organization (NATO) Information: To facilitate potential access to NATO classified information, to include NATO accredited SIPRNet terminals, all DoD military, civilian, and Contractor personnel who are briefed on their responsibilities for protecting U.S. classified military information, shall also be briefed on the requirements for protecting NATO information, per Deputy Under Secretary of Defense Policy Security Memo of 5 Dec 01. Written concurrence of the Contracting Officer/ is required prior to adding/changing subcontractors.

3.2.10 Classified Information/Material Access: All classified information/material shall be provided by the Contractor facility or Government Contracting Activity (GCA) and safeguarded at the approved actual performance site.

3.2.11 Program Unique Requirements

3.2.11.1 Physical Security: The Contractor shall be responsible for safeguarding all Government property provided for their use. At the end of each work period, all facilities, equipment, and materials shall be secured.

3.2.11.2 Performance Requirements: The Contractor shall have direct experience and thorough knowledge of Naval Aviation Enterprise (NAE) and NAVAIR IT policy, concepts, and toolsets, including but not limited to, NAVAIR Logistics, Maintenance, Analytical, and FRC IT solution sets, Navy Networks, and Mission Aligned Organization (MAO). Information Assurance Management (IAM) and Information Assurance Technical (IAT) level certifications (if required) shall be the responsibility of the contractor. An understanding of these policies and concepts shall be required to ensure stability and continuity of the workforce when hiring personnel and during execution of this SOW.

The Contractor shall comply with Command Initiatives. The Contractor shall perform in accordance with DoD, DoN, and NAVAIR initiatives, standards, policies, and mandates such as Application Portfolio Management, Defense Business Transformation Guidance, Navy Enterprise Application Developer’s Guide (NEADG), Clinger Cohen Act (CCA), Federal Information Security Management Act (FISMA), Web Enablement, and 508 Compliance. Any systems/applications or tools that will reside on NMCI, Continuity of Services Contract (COSC), Next Generation Enterprise Network (NGEN), or run on these workstations must be certified for NMCI, COSC, NGEN, and comply with NMCI, COSC, and NGEN policies.

3.2.11.3 Data Rights: For all technical data produced or delivered under this contract, the Contractor shall grant the Government rights, as per Defense Federal Acquisition Regulation (FAR) Supplement (DFARS) 252.227-7013 Rights in Technical Data--Noncommercial Items. For all computer software produced or delivered under this contract, the Contractor shall grant the Government rights, as per DFARS 252.227-7014 Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation. This includes the source code and artifacts (such as Interface Description Language (IDL) / Web Service Description Language (WSDL) files and all required interop’s (technology that enables Common Object Model (COM) objects to interact with .NET objects and vice versa), build scripts and procedures, install scripts and procedures, minimal data required to build, install, and start application, and executable code, which shall be Government property. The Contractor shall flow these data rights down to all subcontractors and suppliers. These rights are IAW DFARS 252.227-7014, Rights in Data – General, DFARS 252.227-7020, Rights in Data – Special Works, and DFARS 252.227-7021, Rights in Data—Existing Works.

3.2.11.4 Government Furnished Property, Equipment, and Information: The Government reserves the right to provide Government Property, Equipment, and Information on an as needed basis at the task order level. The Contractor shall be required to manage and track such furnished property in accordance with applicable Government property clauses and reporting requirements. (CDRL A00H)

3.2.11.5 Contractor Acquired Material/Property: The Contractor shall document the transfer of the materials and property in the monthly status report and appropriate Government documentation.

3.2.11.6 Organizational Conflict of Interest: The Government requires that a Contractor-provided Organizational Conflict of Interest (OCI) Mitigation Plan be submitted within fifteen (15) days after contract award. All Contractor personnel working this contract shall receive company sponsored OCI training within fourteen (14) calendar days after contract award. (CDRL A003 OCI Mitigation Plan)

3.2.11.7 Non-Disclosure Agreements: In the performance of the contract, the Contractor may have access to non-public proprietary information. If the Government determines that the Contractor will have access to non-public proprietary information at a task order level, then the Contractor shall require that any employee performing services under that task order sign a Non-Disclosure Agreement (NDA). The NDA shall acknowledge the Contractor and employees’ duties and promise to comply with those obligations. The Contractor shall provide the COR/TOCOR a NDA for each individual Contractor employee before the employee begins performance by individual task orders.

3.2.11.8 Disclosure of Information: Contractor employees shall not discuss nor disclose any information to which they are exposed during the execution of tasks to parties other than the originator of the information, authorized Government investigative personnel, the Contracting Officer, or COR personnel. Improper disclosure of sensitive information may be grounds for removal of Contractor personnel.

3.2.11.9 Training. The Contractor shall provide qualified personnel who are capable of assuming their duties at contract award. Training for Contractor personnel shall be at the Contractor’s expense. In the event the Contractor must attend training, the Contractor shall coordinate training dates with the Government to ensure continuity of operations.

3.2.11.10 Quality Assurance. The Government will evaluate the Contractor’s performance under this contract and orders in accordance with the Contract Surveillance Plan (CSP) required by FAR Part 46. The principal evaluator of Contractor work quality is the Government COR/ACOR in coordination with TOCOR/TPOC. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the Government will survey, observe, test, sample, evaluate, and document the Contractor’s performance standards identified in the Contract and Orders.

3.2.12 Cybersecurity

3.2.12.1 Cybersecurity Plan

For Cybersecurity (CS) requirements see the Cybersecurity Plan (CSP), Attachment 5. Specific mentioned policies in the CS Plan can be accessed via the Cybersecurity Policy Chart at the following link: http://iac.dtic.mil/csiac/ia_policychart.html The Contractor shall be required to deliver a Program Cybersecurity Implementation Plan (CSIP) or Annex CSIP to address each of the sections of the Cybersecurity Plan (CSP). The contractor shall demonstrate its understanding of the CSP and describe how the requirement of each of the sections of the CSP will be achieved by the contractor. Sections of the CSP that are NOT applicable are required to be addressed.

The contractor shall describe why a particular section is not applicable. The final Program CSIP shall be in Adobe Acrobat format with a digital signature from the contractor cognizant authority.

If no approved Program CSIP currently exists between the contractor and the Government, then one must be created and submitted. If an approved Program CSIP already exists and sufficiently satisfies the CSP requirements for the contract, then no new CSIP delivery is required. In such cases, the Contractor in consultation with the Government shall only submit a Contract Letter to the Government stating that all CSP requirements are satisfied by the existing Program CSIP.

If CSP requirements are NOT adequately addressed by the existing Program CSIP, then an update to the Program CSIP or a supplemental CSIP document referred to as an “Annex CSIP” shall be created to satisfy the CSP requirements. An Annex CSIP shall address unique CSP Section "G" Assessment and Authorization requirements if a system is being delivered under the contract and unique Section "Q" Software requirements if software is being delivered. These Program CSIP updates or Annex CSIPs shall be submitted on a semi-annual (twice per year) basis in accordance with CDRL A004 Cybersecurity Implementation Plan.

3.2.12.2 Cybersecurity System/Software Assurance Report

CDRL A005 Cyber Security System/Software Assurance Report: If a system or software is to be delivered to the Government, then the Contractor shall address these requirements within the Cyber Security System/Software Assurance Report.

3.3 DETAILED SUPPORT: The following appropriations may be utilized on this contract:

Funding of Functional Performance Requirements: Functional performance requirements – the function required to execute TO requirements – are outlined below in Section 3.3.1 through 3.3.4. The applicability of each functional performance requirement to funding types is indicated in the table below.

SOW #
Description
RDT&E
O&M
OP
AP
Other
3.3.1
Contract Data Requirements
3.3.1.1
Process/Program Improvement
X
X
X
X
X
3.3.1.2
Project Planning Documents
X
X
X
X
X
3.3.1.3
Engineering Documents
X
X
X
X
X
3.3.1.4
Analysis and Design Documents
X
X
X
X
X
3.3.1.5
Testing Documentation
X
X
X
X
X
3.3.1.6
Training Documentation
X
X
X
X
X
3.3.1.7
Implementation Documentation
X
X
X
X
X
3.3.1.8
Software Application Source Code
X
X
X
X
X
3.3.1.9
Training Development/Delivery
X
X
X
X
X
3.3.1.10
Sustainment Support
X
X
X
X
X
3.3.1.11
Monthly Plan of Action & Milestones (POAM):
X
X
X
X
X
3.3.2
Software Development Life Cycle (SDLC)
3.3.2.1
Planning
X
X
X
X
X
3.3.2.2
Systems Analysis and Requirements
X
X
X
X
X
3.3.2.3
Systems Design
X
X
X
X
X
3.3.2.4
Development
X
X
X
X
3.3.2.5
Integration/Testing/Verification and Validation
X
X
X
X
X
3.3.2.6
Deployment
X
X
X
X
X
3.3.2.7
Operations and Maintenance
X
X
X
X
X
3.3.3
Commercial off the Shelf (COTS) and Software-as-a-Service (SaaS)
3.3.3.1
Software Requirements Analysis
X
X
X
X
X
3.3.3.2
Evaluation
X
X
X
X
X
3.3.3.3
Implementation
X
X
X
X
X
3.3.3.4
Operations and Support
X
X
X
X
X
3.3.4
Support Activities
3.3.4.1
Program/Project Management
X
X

X

3.3.4.2
Software and Systems Engineering
X
X
X
X
X
3.3.4.3
Enterprise Architecture
X
X
X
X
X
3.3.4.4
Information Assurance/Network Security/Cyber Security
X
X
X
X
X
3.3.4.5
Configuration Management
X
X
X
X
X
3.3.4.6
Risk Management
X
X
X
X
X
3.3.4.7
Data/Modeling/Analytics
X
X
X
X
X
3.3.4.8
Database Administration
X
X
X
X
X
3.3.4.9
Web Support
X
X
X
X
X
3.3.4.10
Sustainment
X
X
X
X
3.3.4.11
Education and Training
X
X
X
X
X
3.3.4.12
Help/Service Desk
X
X
X
X
X
3.3.4.13
Documentation
X
X
X
X
X
3.3.4.14
Status Reporting
X
X
X
X
X

3.3.1 Contract Data Requirements

3.3.1.1 Process/Program Improvement: The Contractor shall define, implement, measure, and maintain effective and efficient practices that enable repeatedly executed workload with high levels of success. The Contractor shall update existing processes, build, and develop new processes for Government approval. (CDRL A006 Process/Program Improvement Plans)

3.3.1.2 Project Planning Documents: The Contractor shall develop and/or update existing planning documents, build, and develop new processes for Government approval. All program-planning documents required by individual task orders shall be completed by the Contractor. (CDRL A008 Project Planning Documentation)

3.3.1.3 Engineering Documents: The Contractor shall provide engineering documents and attend reviews requested from the Government. All required engineering documents requested by the Government will be approved by the Government. (CDRL A009 Engineering Documentation)

3.3.1.4 Analysis and Design Documents: The Contractor shall develop all High-Level Design (HLD). HLD explains the architecture that would be used for developing a software product. The architecture diagram provides an overview of an entire system, identifying the main components that would be developed for the product and their interfaces and Low-Level Designs (LLD). LLD describes the class diagrams with the methods and relations between classes and program specs. It describes the modules so that the programmer can directly code the program from the document. Government approval of the HLD is required before the LLD effort can begin. Government approval of the LLD is required before development can begin. All required analysis and design documents requested will be approved by the Government. (CDRL A00A Analysis and Design Documentation)

3.3.1.5 Testing Documentation: The Contractor shall develop all testing documentation when requested by the Government. All required analysis and design documents requested will be approved by the Government. (CDRL A00B Testing Documentation)

3.3.1.6 Training Documentation: The Contractor shall develop curriculum and training documentation such as briefs and reading material as detailed in task order. The Contractor shall provide supporting documentation, and training to the Government as specified in individual task orders. All training documentation requested will be approved by the Government prior to distribution and before training is conducted. (CDRL A00C Training Documentation)

3.3.1.7 Implementation Documentation: The Contractor shall provide the software release package, supporting documentation, and training to the Government required in individual task orders. The Contractor shall provide software installation and implementation support to the Government as defined in the task order. All implementation documentation requested will be approved by the Government. (CDRL A00D Implementation Documentation)

3.3.1.8 Software Application Source Code: The Contractor shall develop the Software Application Source Code (and other IT artifacts) when requested by the Government in accordance with the approved design. The supporting documentation shall follow approved IT templates. All Software Application Source Code and artifacts will be approved by the Government. (CDRL A00E Software Application Source Code)

3.3.1.9 Training Development/Delivery: The Contractor shall provide courseware strategy, design, development/test, delivery, and maintenance training activities. The training will include, but not limited to, end user and “train the trainer” utilizing web based, classroom approaches, and other delivery methods. All training documentation requested will be approved by the Government prior to distribution and before training is conducted. (CDRL A00F Training Development)

3.3.1.10 Sustainment Support: The Contractor shall provide sustainment support including, but not limited…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .