Request for Information

indexReference documentsection within documentparagraph #Page numberRFI QuestionGovernment ResponseStatus
1GeneralGeneralGeneralGeneralPlease provide instruction on which organization or person we should contact in order to start/commence secrutity cleranance process for obtaining permits on time.The local point of contact for security clearances and permit information at Naval Station Rota is Joaquin Hermida Lopez. His email address is Joaquin.LopezHerm.SP@eu.navy.mil and phone number is 956-82-4247.closed
2GeneralGeneralGeneralGeneralIs it the contractor's responsbility to provide shore power for DDG while they are in maintenance period?The ship connects to shore power using U.S. Navy owned cables and Navy provided power. The contractor is not responsible for providing this power or cabling.closed
3GeneralGeneralGeneralGeneralShould the contractor have their own source of power supply or can this be provided by Rota Naval Base power supply eletric network?For the power and electrical needs of the contractor and sub-contractors required for the delivery order, the successful contractor will need to provide their own power generators, fuel for the generators and cabling for the duration of the delivery order.closed
4GeneralGeneralGeneralGeneralAccording to the questions made through FOB Portal, would NAVSUP expects to include Radar systems, communication systems, integrated combat system and/or AEGIS system maintenance activities (Arrays Antenna resurfacing) in the scope of this contract?For the systems mentioned (radar systems, communication systems, integrated combat system and/or AEGIS system maintenance activities, arrays antenna resurfacing) NAVSUP and the Forward Deployed Repair Maintenance Center have contracts with U.S. based companies to repair and maintain those systems. However, some work associated with these systems including structural, or electrical work (cable removal/installation) and scaffolding/containment may be required as necessary.closed
5GeneralGeneralGeneralGeneralIs there a tentative schedule for ship reotation? 3 of the 4 replacement DDG's will be flight 11A, something that Hasn't been homeported here before.Based upon the current schedule, the ship rotation should begin in the Spring of 2020 and complete by the end of 2021. However, that schedule could change based upon unforeseen issues.closed
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

File details come from the government source that posted it.